This Tilt Tray Safe Work Method Statement (SWMS) covers hazards and controls associated with the movement of plant and structures such as portable buildings or shipping containers (referred to as the load) using a tilt tray transport vehicle.

It covers 11 job steps, from planning the route, working alone and transporting the load to arriving at site, picking up and setting down the load, the environment, housekeeping, manual tasks, refuelling, completing the job and emergency response.

It identifies control measures for a wide range of potential hazards, includes an emergency response, and incorporates measures to minimise environmental impact during operations.

It suits businesses and contractors using tilt tray transport vehicles, especially in construction, logistics and any operation moving heavy plant and structures, and safety officers and site managers enforcing compliance.

Tilt Tray SWMS 预览

Tilt Tray

SWMSVersion 6
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Gas MainsWork on or near pressurised gas distribution mains or piping
  • Hazardous LinesWork on or near chemical, fuel or refrigerant lines
  • Energised ElectricalWork on or near energised electrical installations or services
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere
  • Traffic CorridorsWork carried out adjacent to a road, railway or shipping lane, traffic corridor

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/Review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Hand Protection
  • Seat Belt

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Unplanned route; Unpermitted travel

      Before controls4 Acute
      Controls
      • Plan all driving routes as per State requirements for the size of the load

      • Permitted travel routes travel times/curfews as required

      • Ensure travel path will not damage utilities (gas, telecommunication, electrical, water or sewerage systems), or bridges, rail, or other property

      • Ensure drivers/offsiders fully briefed on the day's work requirements

      • In the absence of load-checking and warning devices, ensure operators are trained to recognise acceptable load distributions

      • Special provisions, certifications/permits required for oversize loads (check state authority for details)

      • In the absence of load checking and warning devices, ensure operators are trained to recognise acceptable loads.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 10 个工作步骤,从“Working alone”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个模板

免费注册,然后选择获取方式。你的公司信息会自动填好。

  • 付费套餐包含

    使用套餐中的模板额度。这一份需要 1 个额度。

    比较套餐和价格
  • 单独购买

    $89.95 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

涵盖内容

11 个工作步骤

  1. PlanningPlan the route, permits and travel times, and brief the drivers
  2. Working aloneKeep in contact and keep a first aid kit on hand when working alone
  3. Vehicle operation & transporting the loadInspect the truck before use, and drive and carry the load safely
  4. Arriving at sitePark safely, report to the site supervisor and complete the induction
  5. Pick up/set down of loadLoad and unload the tray safely, clear of people and power lines
  6. EnvironmentControl noise, waste, fuel and spills to protect the environment
  7. House keepingKeep the work area clean and free of trip hazards
  8. Manual tasksSchedule rest breaks and avoid over-pulling on tie-downs
  9. RefuellingRefuel in a ventilated area away from ignition sources, with an extinguisher on hand
  10. On completionPark and secure the truck, check it for damage and sign out
  11. Emergency responseCall 000, follow the site emergency procedures and give first aid

涵盖的危险

评价

暂无评价。

查看全部

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。