抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

模板文件为英文。

Turf Laying Maxi Rolls

SWMS · SWMS-10554

Turf Laying Maxi Rolls SWMS模板预览
  • 14 个工作步骤
  • 版本 4
  • Landscaping
  • 任何手机都能看

This SWMS covers the hazards and controls for laying maxi turf rolls with a stand-on turf-laying machine.

It takes your crew through 14 job steps, from checking the weather, arriving on site and setting up the work area to delivering the turf layer, laying and trimming the turf, rolling it, fuelling the plant, completion and emergency response.

It suits businesses and contractors in landscaping and construction that lay turf with maxi rolls, and the site supervisors, turf-laying operators and safety officers who run the work.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

Turf Laying Maxi Rolls SWMS 预览

Turf Laying Maxi Rolls

SWMSVersion 4
Company doing the work
[Company]
Business contact
—
Business contact phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile Plant

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Act, regulations, codes of practice references

None listed.

Personal Protective Equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Hand Protection
  • Sun Protection

Job steps, hazards and controls

  • Work activity

    Check weather conditions & prepare

    • Hazard

      Extreme weather

      Before controls3 High
      Controls
      • Check weather conditions – do not work in extreme conditions

      • Reschedule works to work in more moderate temperatures.

      After controls2 Moderate
      Responsible
      • Supervisorto maintain awareness of weather conditions
      • Operatorto follow controls
    • Hazard

      Hyperthermia; Hypothermia

      Before controls3 High
      Controls
      • Ensure vehicle cabin is air-conditioned

      • Workers trained to recognise the symptoms of hyperthermia and hypothermia

      • Hot conditions. Ensure:

        • Suitable protective clothing

        • Sun brim on hard hats

        • Safety glasses - UV rated

        • Use 30+ sunscreen on exposed skin

        • Adequate drinking water

        • Access to shade on breaks

        • Adequate breaks.

      • Cold conditions. Ensure:

        • Schedule warm-up breaks

        • Hold breaks inside

        • Dress warmly in layers

        • Stay dry (wet clothing chills the body rapidly)

        • Workers must get out of the cold as soon as they can if starting to feel symptoms

        • Alcohol, cigarettes, caffeine and certain medications increase susceptibility to cold.

      After controls2 Moderate
      Responsible
      • Supervisorto maintain awareness of weather conditions
      • Operatorto follow controls

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 13 个工作步骤,从“Arrival on-site & assess onsite conditions”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个模板

免费注册,然后选择获取方式。你的公司信息会自动填好。

  • 付费套餐包含

    使用套餐中的模板额度。这一份需要 1 个额度。

    比较套餐和价格
  • 单独购买

    $89.95 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

涵盖内容

14 个工作步骤

  1. Check weather conditions & prepareCheck the weather and prepare for the conditions
  2. Arrival on-site & assess onsite conditionsAssess the site for safety before starting work
  3. Work area set-upSet up safe work zones and exclusion areas
  4. EnvironmentManage the effects on the environment, including noise, air quality and waste
  5. House keepingKeep the work area clean and safe to prevent accidents
  6. Manual tasksPrevent musculoskeletal injuries during manual tasks
  7. Delivery, set-up & removal of the turf layerDeliver, set up and remove the turf layer safely
  8. Establish a communication system with ground workersSet up clear communication with the ground workers
  9. Laying the turfLay the turf safely
  10. Trimming the turf using a demo sawTrim the turf safely with a demolition saw
  11. Rolling the turfRoll the turf safely
  12. Fuelling the plantRefuel the plant safely to prevent fires and exposure to fuel
  13. On completionSecure the equipment and the work area on completion
  14. Emergency responseRespond to emergencies on site

涵盖的危险

评价

暂无评价。

查看全部

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。