عرض الوصول المبكر:وصول مبكر: خصم 30%، ما دمت مشتركًا.

احصل على العرض

مستندات النماذج مكتوبة باللغة الإنجليزية.

حزمة توفير · 57 نماذج

Civil Roadworks Combo

حزمة توفير · PACK-50331

معاينة نموذج حزمة توفير Civil Roadworks Combo
  • 57 نماذج
  • 57 بسعر 38
  • يصل في مجلد واحد في المكتبة

A set of 40 SWMS, 14 SOPs, one plan and two forms for road construction and maintenance contractors.

The SWMS cover kerb and channel, asphalt, road pavement stabilising, traffic line removal, traffic corridors and soil compaction. The SOPs include Grader, Front-end Loader and Plant Attachment Maintenance. It also includes Excavation Collapse Emergency Response Plan, Plant Risk Assessment Form and Excavation Safety Inspection Checklist.

Each document is the same one sold on its own, so you get every update to it. Together they cost 38 template credits instead of 57.

معاينة SOP Driver Posture & Responsibilities

Driver Posture & Responsibilities

SOPVersion 4

Acronyms

  • PPE - Personal Protective Equipment

  • SOP - Safe Operating Procedure

8 أقسام أخرى

  1. Hazards
  2. Pre-operational inspection
  3. Precautions
  4. Driver responsibility
  5. Vehicle ergonomic principles
  6. و3 غيرها

مكتوبة بالكامل، وجاهزة لبيانات شركتك.

المعاينة بصيغة

كيف يبدو في المتصفح

احصل على حزمة التوفير هذه

سجّل مجانًا، ثم اختر الطريقة التي تناسبك. يُضاف كل مستند إلى مكتبتك، في مجلد يحمل اسم الحزمة.

  • مشمول في الخطط المدفوعة

    استخدم أرصدة النماذج من خطتك. تكلفة هذه الحزمة 38 بدلًا من 57.

    قارن الخطط والأسعار
  • اشترِه مرة واحدة

    $3,418.10 $5,127.15 تُدفع مرة واحدة، ويبقى ملكك. يعمل على الخطة المجانية أيضًا.

لا حاجة إلى بطاقة للتسجيل. يحصل أعضاء الوصول المبكر على خصم 30% على أي خطة.

ما يتضمنه

  1. Driver Posture & Responsibilities

    SOP · 9 أقسام

    Safe operating procedure for driver posture and responsibilities: hazards, ergonomics, fuelling, accident procedure and a vehicle pre-operational checklist.

    يُباع أيضًا منفردًا
  2. Soil Testing

    SWMS · 11 خطوات عمل

    Soil Testing SWMS: 11 job steps from remote travel and set-up to soil testing, mobile plant, completion and emergency response.

    يُباع أيضًا منفردًا
  3. Bollard Speed Bump Tactile Paving

    SWMS · 15 خطوات عمل

    SWMS for installing bollards, speed bumps and tactile paving at crossings, pedestrian islands, vehicle crossovers, railway platforms and car parks.

    يُباع أيضًا منفردًا
  4. Mobile Plant Working Near-Around

    SWMS · 8 خطوات عمل

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    يُباع أيضًا منفردًا
  5. Scraper-Dozer-Grader

    SWMS · 20 خطوات عمل

    SWMS for scraper, dozer and grader work: site set-up, machine operation, slopes, power lines, underground services, refuelling and emergencies.

    يُباع أيضًا منفردًا
  6. Handheld Power Tools

    SOP · 9 أقسام

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    يُباع أيضًا منفردًا
  7. Spotter

    SWMS · 11 خطوات عمل

    SWMS for spotters and safety observers: traffic and mobile plant, work near overhead and underground assets, scaffolding and EWPs, roll-over and first aid.

    يُباع أيضًا منفردًا
  8. Plant Risk Assessment Form

    نموذج تعبئة · 25 حقول

    Identify the hazards of an item of plant, score the risk with a risk matrix, and tick the control measures in place, with reviews and approval.

    يُباع أيضًا منفردًا
  9. Bulk Excavations

    SWMS · 13 خطوات عمل

    SWMS for bulk excavation work: planning, plant operation, shoring, water-charged ground, silica dust, re-fuelling, environmental controls and emergencies.

    يُباع أيضًا منفردًا
  10. Concrete Kerb - Channel

    SWMS · 16 خطوات عمل

    SWMS for installing extruded concrete kerb and channel: site set-up, traffic, plant delivery, subgrade, extrusion, wet cement, refuelling and emergencies.

    يُباع أيضًا منفردًا
  11. Trench Excavation

    SWMS · 15 خطوات عمل

    Trench Excavation SWMS: 15 job steps covering excavating and working in trenches over 1.5 m deep, from planning to emergency response.

    يُباع أيضًا منفردًا
  12. Grader

    SOP · 7 أقسام

    Safe operating procedure for a grader: hazards, PPE, training, maintenance, step-by-step operation and a hazard checklist.

    يُباع أيضًا منفردًا
  13. Front-end Loader

    SOP · 7 أقسام

    Safe operating procedure for a front-end loader: hazards, precautions, operation, maintenance and a hazard checklist for powered mobile machinery.

    يُباع أيضًا منفردًا
  14. Asphalt Paver

    SWMS · 13 خطوات عمل

    Asphalt Paver SWMS: 13 job steps covering hot mix paving, delivery and crane lifting, hot mix and fuel hazards, overhead lines, traffic and emergencies.

    يُباع أيضًا منفردًا
  15. Traffic Corridor - Establishing a Safe Work Zone

    SWMS · 8 خطوات عمل

    Traffic corridor SWMS: 8 job steps covering the traffic management plan, safe work zone set-up, traffic controllers, pedestrians and zone takeouts.

    يُباع أيضًا منفردًا
  16. Plant Attachment Maintenance

    SOP · 10 أقسام

    Safe operating procedure for plant attachment maintenance: hazards, PPE, training, isolation under LOTO, and cleaning, welding and hydraulics safety.

    يُباع أيضًا منفردًا
  17. Civil Shoulder Grading

    SWMS · 17 خطوات عمل

    SWMS for road shoulder grading with a grader, water cart and roller: float transport, traffic, dust control, gravel, compaction, refuelling and emergencies.

    يُباع أيضًا منفردًا
  18. Manual Handling

    SOP · 5 أقسام

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    يُباع أيضًا منفردًا
  19. Civil Road Base and Seal

    SWMS · 18 خطوات عمل

    Civil road base and seal SWMS covering 18 job steps, from site set-up and machinery delivery to compaction, sealing, fuelling and emergencies.

    يُباع أيضًا منفردًا
  20. Confined Space Work

    SWMS · 10 خطوات عمل

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    يُباع أيضًا منفردًا
  21. Lasers

    SWMS · 9 خطوات عمل

    Lasers SWMS: 9 job steps covering Class 1, 2 and 3R construction lasers, beam set-up, eye injury, mobile plant, roadside work and emergencies.

    يُباع أيضًا منفردًا
  22. Sediment Fencing

    SWMS · 18 خطوات عمل

    SWMS for installing sediment and safety fencing: machine set-up, wire straining, nail and staple guns, refuelling and emergency response.

    يُباع أيضًا منفردًا
  23. Guided Boring Pipe Jacking Works

    SWMS · 17 خطوات عمل

    A SWMS for guided boring and pipe jacking works: the hazards and controls for excavating launch and retrieval pits, hoisting and running the machine.

    يُباع أيضًا منفردًا
  24. Water Cart

    SWMS · 14 خطوات عمل

    SWMS for diesel or petrol water cart work: travel, filling from a hydrant, dust suppression, working near plant, refuelling and emergencies.

    يُباع أيضًا منفردًا
  25. Silica Dust

    SWMS · 14 خطوات عمل

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    يُباع أيضًا منفردًا
  26. Surveyor

    SWMS · 14 خطوات عمل

    Surveyor SWMS: 14 job steps covering laser operation, rail, road and water work, remote and public areas, mobile plant and emergency response.

    يُباع أيضًا منفردًا
  27. Stabilising Road Pavement

    SWMS · 16 خطوات عمل

    SWMS for stabilising a road pavement: planning, set-up near roads, machinery, dust control, cement and lime spreading, grading, fuelling and emergencies.

    يُباع أيضًا منفردًا
  28. Line Marking

    SWMS · 13 خطوات عمل

    Line Marking SWMS: 13 job steps for airless line marking on concrete and bitumen, covering traffic, paint, fuel, plant and emergencies.

    يُباع أيضًا منفردًا
  29. Trailer Mounted Hydro Excavator

    SWMS · 20 خطوات عمل

    Trailer mounted hydro excavator SWMS: 20 job steps from coupling the trailer to hydro jetting, vacuum operation, unloading and emergencies.

    يُباع أيضًا منفردًا
  30. Backhoe Loader

    SOP · 9 أقسام

    A safe operating procedure for backhoe loaders: hazards, PPE, clearances, operation steps, maintenance and a hazard checklist.

    يُباع أيضًا منفردًا
  31. Construction Night Works

    SWMS · 4 خطوات عمل

    SWMS for general construction work at night: planning, work area set-up, night works and emergency response, with lighting, plant and fatigue controls.

    يُباع أيضًا منفردًا
  32. Hand Tools

    SOP · 9 أقسام

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    يُباع أيضًا منفردًا
  33. Asphalt Patcher

    SOP · 7 أقسام

    Safe operating procedure for an asphalt patcher: hazards, PPE, training, maintenance, step-by-step operation and a hazard checklist.

    يُباع أيضًا منفردًا
  34. Earthmoving Equipment

    SWMS · 23 خطوات عمل

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    يُباع أيضًا منفردًا
  35. Falls from Heavy Vehicles

    SOP · 7 أقسام

    Safe operating procedure to prevent falls from heavy vehicles: worker training, maintenance, cab access, trailers and a training register.

    يُباع أيضًا منفردًا
  36. Roller Operation

    SWMS · 17 خطوات عمل

    Roller Operation SWMS: 17 job steps covering drum and multi-wheel rollers on roadworks, from site set-up and power lines to maintenance and emergencies.

    يُباع أيضًا منفردًا
  37. Nuclear Densometer

    SWMS · 12 خطوات عمل

    Nuclear Densometer SWMS: 12 job steps covering storage, transport, radiation exposure, mobile plant, trenches and emergencies.

    يُباع أيضًا منفردًا
  38. Excavation Collapse Emergency Response Plan

    خطة إدارة · 4 أقسام

    A seven-step emergency response plan for trench and excavation collapses, with site details, emergency contacts and a rescue equipment checklist.

    يُباع أيضًا منفردًا
  39. Outdoor Work

    SOP · 11 أقسام

    Safe operating procedure for outdoor work: hazards, PPE, hot and cold conditions, poisonous plants, animals, first aid and a training register.

    يُباع أيضًا منفردًا
  40. Skid Steer

    SOP · 9 أقسام

    Safe operating procedure for a skid steer: hazards, PPE, precautions, step-by-step operation, fuelling, maintenance and a hazard checklist.

    يُباع أيضًا منفردًا
  41. Asphalt Concrete Road Application and Repairs

    SWMS · 18 خطوات عمل

    SWMS for asphalt and concrete road application and repairs: site set-up, traffic, power lines, cutting, applying material, fuelling and emergencies.

    يُباع أيضًا منفردًا
  42. Manual Handling

    SWMS · 18 خطوات عمل

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    يُباع أيضًا منفردًا
  43. Excavator

    SOP · 9 أقسام

    Safe operating procedure for an excavator: hazards, PPE, licensing, clearances, maintenance, step-by-step operation and a hazard checklist.

    يُباع أيضًا منفردًا
  44. Road Safety Barrier Installation

    SWMS · 21 خطوات عمل

    Safe work method statement for installing road safety barriers: 21 job steps from planning and traffic control to post driving, silica dust and emergencies.

    يُباع أيضًا منفردًا
  45. Horizontal Directional Boring

    SWMS · 16 خطوات عمل

    SWMS for horizontal directional boring: locating underground services, drilling, service strikes, rig maintenance, refuelling and emergencies.

    يُباع أيضًا منفردًا
  46. Road Profiler Machine

    SWMS · 23 خطوات عمل

    Road Profiler Machine SWMS: 23 job steps covering silica dust, mobile plant, power lines, underground services, roadside work and emergencies.

    يُباع أيضًا منفردًا
  47. Site Mobilisation

    SWMS · 13 خطوات عمل

    Site Mobilisation SWMS: 13 job steps for packing, transporting and unloading shipping containers by road vehicle, covering mobile plant, power lines and fuelling.

    يُباع أيضًا منفردًا
  48. Traffic Line Removal

    SWMS · 16 خطوات عمل

    Traffic Line Removal SWMS: 16 job steps covering the hazards and controls for removing traffic line markings with mobile plant.

    يُباع أيضًا منفردًا
  49. Tipper and Dog

    SWMS · 16 خطوات عمل

    Hazards and controls for operating a tip truck and dog trailer, including side tippers, from coupling trailers to tipping, refuelling and emergency response.

    يُباع أيضًا منفردًا
  50. Excavation Near Assets

    SWMS · 13 خطوات عمل

    SWMS for excavating near underground services and assets: site planning, survey, work area set-up, contact with utilities and emergency response.

    يُباع أيضًا منفردًا
  51. Excavation Safety Inspection Checklist

    نموذج تعبئة · 22 حقول

    A checklist for inspecting excavation and trenching work: soil, utilities, protective systems, access, atmosphere, water and emergency response.

    يُباع أيضًا منفردًا
  52. Roller

    SOP · 8 أقسام

    Safe operating procedure for a roller: hazards, PPE, precautions, transporting, maintenance, step-by-step operation and a hazard checklist.

    يُباع أيضًا منفردًا
  53. Hydro Seeding

    SWMS · 12 خطوات عمل

    A SWMS for hydro seeding: the hazards and controls for spreading seed, fertilisers and agricultural chemicals to prepared seedbeds with a hydroseeder.

    يُباع أيضًا منفردًا
  54. Light Vehicle on Construction

    SWMS · 16 خطوات عمل

    Light Vehicle on Construction SWMS: 16 job steps covering travel, loading, fuelling, breakdowns, accidents, mobile plant and emergencies.

    يُباع أيضًا منفردًا
  55. Soil Compactor

    SWMS · 19 خطوات عمل

    SWMS for soil compactor work: weather, site set-up, overhead lines, slopes, silica dust, refuelling, ground workers and emergency response.

    يُباع أيضًا منفردًا
  56. Site Establishment

    SWMS · 11 خطوات عمل

    Site Establishment SWMS: 11 job steps from planning and traffic management to tools, site set-up, working at height and emergency response.

    يُباع أيضًا منفردًا
  57. Hot Asphalt Truck

    SWMS · 11 خطوات عمل

    Covers operating a hot asphalt truck for road paving, with the risks and controls for each job step from travel to emergency response.

    يُباع أيضًا منفردًا

ما يغطيه

المخاطر التي يغطيها

التشريعات والمعايير التي يستند إليها

يأتي كل SWMS مع قائمة مراجع التشريعات ومدونات الممارسة الخاصة بنا.

ما توفّره

النموذجخطوات العملمنفردًا
Driver Posture & Responsibilities0$89.95 · رصيد واحد
Soil Testing11$89.95 · رصيد واحد
Bollard Speed Bump Tactile Paving15$89.95 · رصيد واحد
Mobile Plant Working Near-Around8$89.95 · رصيد واحد
Scraper-Dozer-Grader20$89.95 · رصيد واحد
Handheld Power Tools0$89.95 · رصيد واحد
Spotter11$89.95 · رصيد واحد
Plant Risk Assessment Form0$89.95 · رصيد واحد
Bulk Excavations13$89.95 · رصيد واحد
Concrete Kerb - Channel16$89.95 · رصيد واحد
Trench Excavation15$89.95 · رصيد واحد
Grader0$89.95 · رصيد واحد
Front-end Loader0$89.95 · رصيد واحد
Asphalt Paver13$89.95 · رصيد واحد
Traffic Corridor - Establishing a Safe Work Zone8$89.95 · رصيد واحد
Plant Attachment Maintenance0$89.95 · رصيد واحد
Civil Shoulder Grading17$89.95 · رصيد واحد
Manual Handling0$89.95 · رصيد واحد
Civil Road Base and Seal18$89.95 · رصيد واحد
Confined Space Work10$89.95 · رصيد واحد
Lasers9$89.95 · رصيد واحد
Sediment Fencing18$89.95 · رصيد واحد
Guided Boring Pipe Jacking Works17$89.95 · رصيد واحد
Water Cart14$89.95 · رصيد واحد
Silica Dust14$89.95 · رصيد واحد
Surveyor14$89.95 · رصيد واحد
Stabilising Road Pavement16$89.95 · رصيد واحد
Line Marking13$89.95 · رصيد واحد
Trailer Mounted Hydro Excavator20$89.95 · رصيد واحد
Backhoe Loader0$89.95 · رصيد واحد
Construction Night Works4$89.95 · رصيد واحد
Hand Tools0$89.95 · رصيد واحد
Asphalt Patcher0$89.95 · رصيد واحد
Earthmoving Equipment23$89.95 · رصيد واحد
Falls from Heavy Vehicles0$89.95 · رصيد واحد
Roller Operation17$89.95 · رصيد واحد
Nuclear Densometer12$89.95 · رصيد واحد
Excavation Collapse Emergency Response Plan0$89.95 · رصيد واحد
Outdoor Work0$89.95 · رصيد واحد
Skid Steer0$89.95 · رصيد واحد
Asphalt Concrete Road Application and Repairs18$89.95 · رصيد واحد
Manual Handling18$89.95 · رصيد واحد
Excavator0$89.95 · رصيد واحد
Road Safety Barrier Installation21$89.95 · رصيد واحد
Horizontal Directional Boring16$89.95 · رصيد واحد
Road Profiler Machine23$89.95 · رصيد واحد
Site Mobilisation13$89.95 · رصيد واحد
Traffic Line Removal16$89.95 · رصيد واحد
Tipper and Dog16$89.95 · رصيد واحد
Excavation Near Assets13$89.95 · رصيد واحد
Excavation Safety Inspection Checklist0$89.95 · رصيد واحد
Roller0$89.95 · رصيد واحد
Hydro Seeding12$89.95 · رصيد واحد
Light Vehicle on Construction16$89.95 · رصيد واحد
Soil Compactor19$89.95 · رصيد واحد
Site Establishment11$89.95 · رصيد واحد
Hot Asphalt Truck11$89.95 · رصيد واحد
عند الشراء واحدًا تلو الآخر$5,127.15 · 57 أرصدة
ضمن هذه الحزمة$3,418.10 · 38 أرصدة توفّر $1,709.05

المراجعات

لا توجد مراجعات بعد.

كيف تعمل النماذج

جرّبه قبل أن تدفع.

  1. معاينة مجانية

    خطوات العمل والمخاطر والمهمة الأولى في كل نموذج متاحة للقراءة. دون تسجيل.

  2. جرّب المحرّر

    كيّف بيان SWMS تجريبيًا باسم شركتك ومهمتك وموقعك، على الحاسوب أو هاتفك.

  3. سجّل مجانًا

    تنتقل بياناتك وشعارك معك. وهذا النموذج يُفتح معبّأً مسبقًا.

  4. استخدم رصيدًا أو اشترِ مرة واحدة

    تتضمن الخطط المدفوعة أرصدة نماذج كل شهر. أو اشترِ هذا النموذج ليبقى لك.