Civil Roadworks

حزمة توفير · PACK-50316

معاينة نموذج حزمة توفير Civil Roadworks
  • 40 نماذج
  • 40 بسعر 26
  • يصل في مجلد واحد في المكتبة

A set of 40 SWMS for road construction and maintenance contractors: kerb and channel, asphalt, road pavement stabilising, traffic line removal, traffic corridors and soil compaction.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost 26 template credits instead of 40.

معاينة SWMS Tipper and Dog

Tipper and Dog

SWMSVersion 14
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Energised ElectricalWork on or near energised electrical installations or services
  • Traffic CorridorsWork on, in or adjacent to a road, railway, shipping lane or other traffic corridor in use by traffic other than pedestrians
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Seat Belt

Job steps, hazards and controls

  • Work activity

    Check weather conditions & prepare

    • Hazard

      Extreme weather

      Before controls3 High
      Controls
      • Check weather conditions – do not work in extreme conditions

      • Reschedule works to work in more moderate temperatures.

      After controls2 Moderate
      Responsible
      • SupervisorMaintain awareness of weather conditions
      • OperatorFollow controls
    • Hazard

      Hyperthermia

      Hypothermia

      Before controls3 High
      Controls
      • Ensure vehicle cabin is air-conditioned

      • Workers trained to recognise the symptoms of hyperthermia and hypothermia

      • Hot conditions. Ensure:

        • Suitable protective clothing

        • Sun brim on hard hats

        • Safety glasses - UV rated

        • Use 30+ sunscreen on exposed skin

        • Adequate drinking water

        • Access to shade on breaks

        • Adequate breaks.

      • Cold conditions. Ensure:

        • Schedule warm-up breaks

        • Hold breaks inside

        • Dress warmly in layers

        • Stay dry (wet clothing chills the body rapidly)

        • Workers must get out of the cold as soon as they can if starting to feel symptoms

        • Alcohol, cigarettes, caffeine and certain medications increase susceptibility to cold.

      After controls2 Moderate
      Responsible
      • SupervisorMaintain awareness of weather conditions
      • OperatorFollow controls

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

15 خطوات عمل أخرى، من Working alone إلى Emergency response

لكل منها مخاطرها وتقييمات خطورتها وإجراءات التحكم فيها، إضافة إلى توقيع طاقمك.

المعاينة بصيغة

كيف يبدو في المتصفح

احصل على حزمة التوفير هذه

سجّل مجانًا، ثم اختر الطريقة التي تناسبك. يُضاف كل مستند إلى مكتبتك، في مجلد يحمل اسم الحزمة.

  • مشمول في الخطط المدفوعة

    استخدم أرصدة النماذج من خطتك. تكلفة هذه الحزمة 26 بدلًا من 40.

    قارن الخطط والأسعار
  • اشترِه مرة واحدة

    $2,338.70 $3,598.00 تُدفع مرة واحدة، ويبقى ملكك. يعمل على الخطة المجانية أيضًا.

لا حاجة إلى بطاقة للتسجيل. يحصل أعضاء الوصول المبكر على خصم 30% على أي خطة.

ما يتضمنه

  1. Tipper and Dog

    SWMS · 16 خطوات عمل

    Hazards and controls for operating a tip truck and dog trailer, including side tippers, from coupling trailers to tipping, refuelling and emergency response.

    يُباع أيضًا منفردًا
  2. Concrete Kerb - Channel

    SWMS · 16 خطوات عمل

    SWMS for installing extruded concrete kerb and channel: site set-up, traffic, plant delivery, subgrade, extrusion, wet cement, refuelling and emergencies.

    يُباع أيضًا منفردًا
  3. Traffic Line Removal

    SWMS · 16 خطوات عمل

    Traffic Line Removal SWMS: 16 job steps covering the hazards and controls for removing traffic line markings with mobile plant.

    يُباع أيضًا منفردًا
  4. Earthmoving Equipment

    SWMS · 23 خطوات عمل

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    يُباع أيضًا منفردًا
  5. Traffic Corridor - Establishing a Safe Work Zone

    SWMS · 8 خطوات عمل

    Traffic corridor SWMS: 8 job steps covering the traffic management plan, safe work zone set-up, traffic controllers, pedestrians and zone takeouts.

    يُباع أيضًا منفردًا
  6. Stabilising Road Pavement

    SWMS · 16 خطوات عمل

    SWMS for stabilising a road pavement: planning, set-up near roads, machinery, dust control, cement and lime spreading, grading, fuelling and emergencies.

    يُباع أيضًا منفردًا
  7. Hot Asphalt Truck

    SWMS · 11 خطوات عمل

    Covers operating a hot asphalt truck for road paving, with the risks and controls for each job step from travel to emergency response.

    يُباع أيضًا منفردًا
  8. Hydro Seeding

    SWMS · 12 خطوات عمل

    A SWMS for hydro seeding: the hazards and controls for spreading seed, fertilisers and agricultural chemicals to prepared seedbeds with a hydroseeder.

    يُباع أيضًا منفردًا
  9. Site Mobilisation

    SWMS · 13 خطوات عمل

    Site Mobilisation SWMS: 13 job steps for packing, transporting and unloading shipping containers by road vehicle, covering mobile plant, power lines and fuelling.

    يُباع أيضًا منفردًا
  10. Surveyor

    SWMS · 14 خطوات عمل

    Surveyor SWMS: 14 job steps covering laser operation, rail, road and water work, remote and public areas, mobile plant and emergency response.

    يُباع أيضًا منفردًا
  11. Soil Compactor

    SWMS · 19 خطوات عمل

    SWMS for soil compactor work: weather, site set-up, overhead lines, slopes, silica dust, refuelling, ground workers and emergency response.

    يُباع أيضًا منفردًا
  12. Water Cart

    SWMS · 14 خطوات عمل

    SWMS for diesel or petrol water cart work: travel, filling from a hydrant, dust suppression, working near plant, refuelling and emergencies.

    يُباع أيضًا منفردًا
  13. Soil Testing

    SWMS · 11 خطوات عمل

    Soil Testing SWMS: 11 job steps from remote travel and set-up to soil testing, mobile plant, completion and emergency response.

    يُباع أيضًا منفردًا
  14. Asphalt Concrete Road Application and Repairs

    SWMS · 18 خطوات عمل

    SWMS for asphalt and concrete road application and repairs: site set-up, traffic, power lines, cutting, applying material, fuelling and emergencies.

    يُباع أيضًا منفردًا
  15. Trench Excavation

    SWMS · 15 خطوات عمل

    Trench Excavation SWMS: 15 job steps covering excavating and working in trenches over 1.5 m deep, from planning to emergency response.

    يُباع أيضًا منفردًا
  16. Silica Dust

    SWMS · 14 خطوات عمل

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    يُباع أيضًا منفردًا
  17. Trailer Mounted Hydro Excavator

    SWMS · 20 خطوات عمل

    Trailer mounted hydro excavator SWMS: 20 job steps from coupling the trailer to hydro jetting, vacuum operation, unloading and emergencies.

    يُباع أيضًا منفردًا
  18. Road Profiler Machine

    SWMS · 23 خطوات عمل

    Road Profiler Machine SWMS: 23 job steps covering silica dust, mobile plant, power lines, underground services, roadside work and emergencies.

    يُباع أيضًا منفردًا
  19. Road Safety Barrier Installation

    SWMS · 21 خطوات عمل

    Safe work method statement for installing road safety barriers: 21 job steps from planning and traffic control to post driving, silica dust and emergencies.

    يُباع أيضًا منفردًا
  20. Roller Operation

    SWMS · 17 خطوات عمل

    Roller Operation SWMS: 17 job steps covering drum and multi-wheel rollers on roadworks, from site set-up and power lines to maintenance and emergencies.

    يُباع أيضًا منفردًا
  21. Mobile Plant Working Near-Around

    SWMS · 8 خطوات عمل

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    يُباع أيضًا منفردًا
  22. Civil Shoulder Grading

    SWMS · 17 خطوات عمل

    SWMS for road shoulder grading with a grader, water cart and roller: float transport, traffic, dust control, gravel, compaction, refuelling and emergencies.

    يُباع أيضًا منفردًا
  23. Bollard Speed Bump Tactile Paving

    SWMS · 15 خطوات عمل

    SWMS for installing bollards, speed bumps and tactile paving at crossings, pedestrian islands, vehicle crossovers, railway platforms and car parks.

    يُباع أيضًا منفردًا
  24. Scraper-Dozer-Grader

    SWMS · 20 خطوات عمل

    SWMS for scraper, dozer and grader work: site set-up, machine operation, slopes, power lines, underground services, refuelling and emergencies.

    يُباع أيضًا منفردًا
  25. Asphalt Paver

    SWMS · 13 خطوات عمل

    Asphalt Paver SWMS: 13 job steps covering hot mix paving, delivery and crane lifting, hot mix and fuel hazards, overhead lines, traffic and emergencies.

    يُباع أيضًا منفردًا
  26. Spotter

    SWMS · 11 خطوات عمل

    SWMS for spotters and safety observers: traffic and mobile plant, work near overhead and underground assets, scaffolding and EWPs, roll-over and first aid.

    يُباع أيضًا منفردًا
  27. Nuclear Densometer

    SWMS · 12 خطوات عمل

    Nuclear Densometer SWMS: 12 job steps covering storage, transport, radiation exposure, mobile plant, trenches and emergencies.

    يُباع أيضًا منفردًا
  28. Lasers

    SWMS · 9 خطوات عمل

    Lasers SWMS: 9 job steps covering Class 1, 2 and 3R construction lasers, beam set-up, eye injury, mobile plant, roadside work and emergencies.

    يُباع أيضًا منفردًا
  29. Horizontal Directional Boring

    SWMS · 16 خطوات عمل

    SWMS for horizontal directional boring: locating underground services, drilling, service strikes, rig maintenance, refuelling and emergencies.

    يُباع أيضًا منفردًا
  30. Sediment Fencing

    SWMS · 18 خطوات عمل

    SWMS for installing sediment and safety fencing: machine set-up, wire straining, nail and staple guns, refuelling and emergency response.

    يُباع أيضًا منفردًا
  31. Line Marking

    SWMS · 13 خطوات عمل

    Line Marking SWMS: 13 job steps for airless line marking on concrete and bitumen, covering traffic, paint, fuel, plant and emergencies.

    يُباع أيضًا منفردًا
  32. Civil Road Base and Seal

    SWMS · 18 خطوات عمل

    Civil road base and seal SWMS covering 18 job steps, from site set-up and machinery delivery to compaction, sealing, fuelling and emergencies.

    يُباع أيضًا منفردًا
  33. Construction Night Works

    SWMS · 4 خطوات عمل

    SWMS for general construction work at night: planning, work area set-up, night works and emergency response, with lighting, plant and fatigue controls.

    يُباع أيضًا منفردًا
  34. Light Vehicle on Construction

    SWMS · 16 خطوات عمل

    Light Vehicle on Construction SWMS: 16 job steps covering travel, loading, fuelling, breakdowns, accidents, mobile plant and emergencies.

    يُباع أيضًا منفردًا
  35. Site Establishment

    SWMS · 11 خطوات عمل

    Site Establishment SWMS: 11 job steps from planning and traffic management to tools, site set-up, working at height and emergency response.

    يُباع أيضًا منفردًا
  36. Guided Boring Pipe Jacking Works

    SWMS · 17 خطوات عمل

    A SWMS for guided boring and pipe jacking works: the hazards and controls for excavating launch and retrieval pits, hoisting and running the machine.

    يُباع أيضًا منفردًا
  37. Excavation Near Assets

    SWMS · 13 خطوات عمل

    SWMS for excavating near underground services and assets: site planning, survey, work area set-up, contact with utilities and emergency response.

    يُباع أيضًا منفردًا
  38. Manual Handling

    SWMS · 18 خطوات عمل

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    يُباع أيضًا منفردًا
  39. Confined Space Work

    SWMS · 10 خطوات عمل

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    يُباع أيضًا منفردًا
  40. Bulk Excavations

    SWMS · 13 خطوات عمل

    SWMS for bulk excavation work: planning, plant operation, shoring, water-charged ground, silica dust, re-fuelling, environmental controls and emergencies.

    يُباع أيضًا منفردًا

ما يغطيه

المخاطر التي يغطيها

التشريعات والمعايير التي يستند إليها

يأتي كل SWMS مع قائمة مراجع التشريعات ومدونات الممارسة الخاصة بنا.

ما توفّره

النموذجخطوات العملمنفردًا
Tipper and Dog16$89.95 · رصيد واحد
Concrete Kerb - Channel16$89.95 · رصيد واحد
Traffic Line Removal16$89.95 · رصيد واحد
Earthmoving Equipment23$89.95 · رصيد واحد
Traffic Corridor - Establishing a Safe Work Zone8$89.95 · رصيد واحد
Stabilising Road Pavement16$89.95 · رصيد واحد
Hot Asphalt Truck11$89.95 · رصيد واحد
Hydro Seeding12$89.95 · رصيد واحد
Site Mobilisation13$89.95 · رصيد واحد
Surveyor14$89.95 · رصيد واحد
Soil Compactor19$89.95 · رصيد واحد
Water Cart14$89.95 · رصيد واحد
Soil Testing11$89.95 · رصيد واحد
Asphalt Concrete Road Application and Repairs18$89.95 · رصيد واحد
Trench Excavation15$89.95 · رصيد واحد
Silica Dust14$89.95 · رصيد واحد
Trailer Mounted Hydro Excavator20$89.95 · رصيد واحد
Road Profiler Machine23$89.95 · رصيد واحد
Road Safety Barrier Installation21$89.95 · رصيد واحد
Roller Operation17$89.95 · رصيد واحد
Mobile Plant Working Near-Around8$89.95 · رصيد واحد
Civil Shoulder Grading17$89.95 · رصيد واحد
Bollard Speed Bump Tactile Paving15$89.95 · رصيد واحد
Scraper-Dozer-Grader20$89.95 · رصيد واحد
Asphalt Paver13$89.95 · رصيد واحد
Spotter11$89.95 · رصيد واحد
Nuclear Densometer12$89.95 · رصيد واحد
Lasers9$89.95 · رصيد واحد
Horizontal Directional Boring16$89.95 · رصيد واحد
Sediment Fencing18$89.95 · رصيد واحد
Line Marking13$89.95 · رصيد واحد
Civil Road Base and Seal18$89.95 · رصيد واحد
Construction Night Works4$89.95 · رصيد واحد
Light Vehicle on Construction16$89.95 · رصيد واحد
Site Establishment11$89.95 · رصيد واحد
Guided Boring Pipe Jacking Works17$89.95 · رصيد واحد
Excavation Near Assets13$89.95 · رصيد واحد
Manual Handling18$89.95 · رصيد واحد
Confined Space Work10$89.95 · رصيد واحد
Bulk Excavations13$89.95 · رصيد واحد
عند الشراء واحدًا تلو الآخر$3,598.00 · 40 أرصدة
ضمن هذه الحزمة$2,338.70 · 26 أرصدة توفّر $1,259.30

المراجعات

لا توجد مراجعات بعد.

كيف تعمل النماذج

جرّبه قبل أن تدفع.

  1. معاينة مجانية

    خطوات العمل والمخاطر والمهمة الأولى في كل نموذج متاحة للقراءة. دون تسجيل.

  2. جرّب المحرّر

    كيّف بيان SWMS تجريبيًا باسم شركتك ومهمتك وموقعك، على الحاسوب أو هاتفك.

  3. سجّل مجانًا

    تنتقل بياناتك وشعارك معك. وهذا النموذج يُفتح معبّأً مسبقًا.

  4. استخدم رصيدًا أو اشترِ مرة واحدة

    تتضمن الخطط المدفوعة أرصدة نماذج كل شهر. أو اشترِ هذا النموذج ليبقى لك.