عرض الوصول المبكر:وصول مبكر: خصم 30%، ما دمت مشتركًا.

احصل على العرض

مستندات النماذج مكتوبة باللغة الإنجليزية.

جرّب المحرّر مجانًا
حزمة توفير · 46 نماذج

Civil Water and Sewerage Systems Combo

حزمة توفير · PACK-50333

معاينة نموذج حزمة توفير Civil Water and Sewerage Systems Combo
  • 46 نماذج
  • 46 بسعر 31
  • يصل في مجلد واحد في المكتبة

A set of 32 SWMS and 14 SOPs for civil contractors building water and sewerage systems.

The SWMS cover trench excavation, pipeline disinfecting, borehole drilling, drainage, soil testing and culvert and tank installation. The SOPs include Grader, Front-end Loader and Plant Attachment Maintenance.

Each document is the same one sold on its own, so you get every update to it. Together they cost 31 template credits instead of 46.

معاينة SOP Driver Posture & Responsibilities

Driver Posture & Responsibilities

SOPVersion 4

Acronyms

  • PPE - Personal Protective Equipment

  • SOP - Safe Operating Procedure

8 أقسام أخرى

  1. Hazards
  2. Pre-operational inspection
  3. Precautions
  4. Driver responsibility
  5. Vehicle ergonomic principles
  6. و3 غيرها

مكتوبة بالكامل، وجاهزة لبيانات شركتك.

المعاينة بصيغة

كيف يبدو في المتصفح

احصل على حزمة التوفير هذه

سجّل مجانًا، ثم اختر الطريقة التي تناسبك. يُضاف كل مستند إلى مكتبتك، في مجلد يحمل اسم الحزمة.

  • مشمول في الخطط المدفوعة

    استخدم أرصدة النماذج من خطتك. تكلفة هذه الحزمة 31 بدلًا من 46.

    قارن الخطط والأسعار
  • اشترِه مرة واحدة

    $2,788.45 $4,137.70 تُدفع مرة واحدة، ويبقى ملكك. يعمل على الخطة المجانية أيضًا.

لا حاجة إلى بطاقة للتسجيل. يحصل أعضاء الوصول المبكر على خصم 30% على أي خطة.

ما يتضمنه

  1. Driver Posture & Responsibilities

    SOP · 9 أقسام

    Safe operating procedure for driver posture and responsibilities: hazards, ergonomics, fuelling, accident procedure and a vehicle pre-operational checklist.

    يُباع أيضًا منفردًا
  2. Soil Testing

    SWMS · 11 خطوات عمل

    Soil Testing SWMS: 11 job steps from remote travel and set-up to soil testing, mobile plant, completion and emergency response.

    يُباع أيضًا منفردًا
  3. Pipeline Disinfecting

    SWMS · 12 خطوات عمل

    SWMS for disinfecting pipelines that carry potable water: chlorine handling, water testing, injecting the mains, refuelling, environment and emergencies.

    يُباع أيضًا منفردًا
  4. Vehicle Mounted Borehole Drilling

    SWMS · 14 خطوات عمل

    Vehicle Mounted Borehole Drilling SWMS: 14 job steps covering travel, work area set-up, drilling, maintenance, fuelling and emergencies.

    يُباع أيضًا منفردًا
  5. Mobile Plant Working Near-Around

    SWMS · 8 خطوات عمل

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    يُباع أيضًا منفردًا
  6. Handheld Power Tools

    SOP · 9 أقسام

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    يُباع أيضًا منفردًا
  7. Spotter

    SWMS · 11 خطوات عمل

    SWMS for spotters and safety observers: traffic and mobile plant, work near overhead and underground assets, scaffolding and EWPs, roll-over and first aid.

    يُباع أيضًا منفردًا
  8. Bulk Excavations

    SWMS · 13 خطوات عمل

    SWMS for bulk excavation work: planning, plant operation, shoring, water-charged ground, silica dust, re-fuelling, environmental controls and emergencies.

    يُباع أيضًا منفردًا
  9. Trench Excavation

    SWMS · 15 خطوات عمل

    Trench Excavation SWMS: 15 job steps covering excavating and working in trenches over 1.5 m deep, from planning to emergency response.

    يُباع أيضًا منفردًا
  10. Grader

    SOP · 7 أقسام

    Safe operating procedure for a grader: hazards, PPE, training, maintenance, step-by-step operation and a hazard checklist.

    يُباع أيضًا منفردًا
  11. Plumbing Drainage

    SWMS · 18 خطوات عمل

    Plumbing drainage SWMS for installing pipes, stormwater tanks and polyethylene pipe welding, and for sewage and stormwater drainage on civil works.

    يُباع أيضًا منفردًا
  12. Mobile Crane

    SWMS · 16 خطوات عمل

    Mobile Crane SWMS: 16 job steps covering power lines, set-up, load equipment checks, lifting, maintenance, refuelling and emergencies.

    يُباع أيضًا منفردًا
  13. Front-end Loader

    SOP · 7 أقسام

    Safe operating procedure for a front-end loader: hazards, precautions, operation, maintenance and a hazard checklist for powered mobile machinery.

    يُباع أيضًا منفردًا
  14. Traffic Corridor - Establishing a Safe Work Zone

    SWMS · 8 خطوات عمل

    Traffic corridor SWMS: 8 job steps covering the traffic management plan, safe work zone set-up, traffic controllers, pedestrians and zone takeouts.

    يُباع أيضًا منفردًا
  15. Plant Attachment Maintenance

    SOP · 10 أقسام

    Safe operating procedure for plant attachment maintenance: hazards, PPE, training, isolation under LOTO, and cleaning, welding and hydraulics safety.

    يُباع أيضًا منفردًا
  16. Tipper and Dog

    SWMS · 16 خطوات عمل

    Hazards and controls for operating a tip truck and dog trailer, including side tippers, from coupling trailers to tipping, refuelling and emergency response.

    يُباع أيضًا منفردًا
  17. Culvert-Tank Installation

    SWMS · 12 خطوات عمل

    Culvert-Tank Installation SWMS: 12 job steps for installing culverts, tanks and similar structures, from planning to emergency response.

    يُباع أيضًا منفردًا
  18. Manual Handling

    SOP · 5 أقسام

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    يُباع أيضًا منفردًا
  19. Confined Space Work

    SWMS · 10 خطوات عمل

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    يُباع أيضًا منفردًا
  20. Lasers

    SWMS · 9 خطوات عمل

    Lasers SWMS: 9 job steps covering Class 1, 2 and 3R construction lasers, beam set-up, eye injury, mobile plant, roadside work and emergencies.

    يُباع أيضًا منفردًا
  21. Sediment Fencing

    SWMS · 18 خطوات عمل

    SWMS for installing sediment and safety fencing: machine set-up, wire straining, nail and staple guns, refuelling and emergency response.

    يُباع أيضًا منفردًا
  22. Guided Boring Pipe Jacking Works

    SWMS · 17 خطوات عمل

    A SWMS for guided boring and pipe jacking works: the hazards and controls for excavating launch and retrieval pits, hoisting and running the machine.

    يُباع أيضًا منفردًا
  23. Silica Dust

    SWMS · 14 خطوات عمل

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    يُباع أيضًا منفردًا
  24. Backhoe Loader

    SOP · 9 أقسام

    A safe operating procedure for backhoe loaders: hazards, PPE, clearances, operation steps, maintenance and a hazard checklist.

    يُباع أيضًا منفردًا
  25. Construction Night Works

    SWMS · 4 خطوات عمل

    SWMS for general construction work at night: planning, work area set-up, night works and emergency response, with lighting, plant and fatigue controls.

    يُباع أيضًا منفردًا
  26. Hand Tools

    SOP · 9 أقسام

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    يُباع أيضًا منفردًا
  27. Overhead Electric Lines - Working Near

    SWMS · 6 خطوات عمل

    Overhead Electric Lines SWMS: 6 job steps covering exclusion zones, spotters, mobile plant near powerlines and emergency response.

    يُباع أيضًا منفردًا
  28. Asphalt Patcher

    SOP · 7 أقسام

    Safe operating procedure for an asphalt patcher: hazards, PPE, training, maintenance, step-by-step operation and a hazard checklist.

    يُباع أيضًا منفردًا
  29. Earthmoving Equipment

    SWMS · 23 خطوات عمل

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    يُباع أيضًا منفردًا
  30. Falls from Heavy Vehicles

    SOP · 7 أقسام

    Safe operating procedure to prevent falls from heavy vehicles: worker training, maintenance, cab access, trailers and a training register.

    يُباع أيضًا منفردًا
  31. Nuclear Densometer

    SWMS · 12 خطوات عمل

    Nuclear Densometer SWMS: 12 job steps covering storage, transport, radiation exposure, mobile plant, trenches and emergencies.

    يُباع أيضًا منفردًا
  32. Outdoor Work

    SOP · 11 أقسام

    Safe operating procedure for outdoor work: hazards, PPE, hot and cold conditions, poisonous plants, animals, first aid and a training register.

    يُباع أيضًا منفردًا
  33. Dogman

    SWMS · 12 خطوات عمل

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    يُباع أيضًا منفردًا
  34. Skid Steer

    SOP · 9 أقسام

    Safe operating procedure for a skid steer: hazards, PPE, precautions, step-by-step operation, fuelling, maintenance and a hazard checklist.

    يُباع أيضًا منفردًا
  35. Electric Fusion - Poly Pipe Butt Welding (PPW)

    SWMS · 11 خطوات عمل

    Electric fusion poly pipe butt welding SWMS: 11 job steps covering mobile plant, hazardous atmospheres, hot plate and facer use, and emergencies.

    يُباع أيضًا منفردًا
  36. Manual Handling

    SWMS · 18 خطوات عمل

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    يُباع أيضًا منفردًا
  37. Excavator

    SOP · 9 أقسام

    Safe operating procedure for an excavator: hazards, PPE, licensing, clearances, maintenance, step-by-step operation and a hazard checklist.

    يُباع أيضًا منفردًا
  38. Horizontal Directional Boring

    SWMS · 16 خطوات عمل

    SWMS for horizontal directional boring: locating underground services, drilling, service strikes, rig maintenance, refuelling and emergencies.

    يُباع أيضًا منفردًا
  39. Excavation Near Assets

    SWMS · 13 خطوات عمل

    SWMS for excavating near underground services and assets: site planning, survey, work area set-up, contact with utilities and emergency response.

    يُباع أيضًا منفردًا
  40. Roller

    SOP · 8 أقسام

    Safe operating procedure for a roller: hazards, PPE, precautions, transporting, maintenance, step-by-step operation and a hazard checklist.

    يُباع أيضًا منفردًا
  41. Plumbing - Water Meter Installation

    SWMS · 16 خطوات عمل

    Plumbing SWMS for installing water meters: 16 job steps from site assessment and electrical hazards to excavation, confined space and emergency response.

    يُباع أيضًا منفردًا
  42. Geofabric Installation

    SWMS · 17 خطوات عمل

    Geofabric Installation SWMS: 17 job steps covering delivery, crane placement, rolling out, seaming and securing geomembrane on dams and landfills.

    يُباع أيضًا منفردًا
  43. Light Vehicle on Construction

    SWMS · 16 خطوات عمل

    Light Vehicle on Construction SWMS: 16 job steps covering travel, loading, fuelling, breakdowns, accidents, mobile plant and emergencies.

    يُباع أيضًا منفردًا
  44. Soil Compactor

    SWMS · 19 خطوات عمل

    SWMS for soil compactor work: weather, site set-up, overhead lines, slopes, silica dust, refuelling, ground workers and emergency response.

    يُباع أيضًا منفردًا
  45. Site Establishment

    SWMS · 11 خطوات عمل

    Site Establishment SWMS: 11 job steps from planning and traffic management to tools, site set-up, working at height and emergency response.

    يُباع أيضًا منفردًا
  46. Remote Control Trench Roller

    SWMS · 15 خطوات عمل

    SWMS for operating a remote control trench roller: transport, set-up, trench work, mobile plant, hydraulics, environment and emergencies.

    يُباع أيضًا منفردًا

ما يغطيه

المخاطر التي يغطيها

التشريعات والمعايير التي يستند إليها

يأتي كل SWMS مع قائمة مراجع التشريعات ومدونات الممارسة الخاصة بنا.

ما توفّره

النموذجخطوات العملمنفردًا
Driver Posture & Responsibilities0$89.95 · رصيد واحد
Soil Testing11$89.95 · رصيد واحد
Pipeline Disinfecting12$89.95 · رصيد واحد
Vehicle Mounted Borehole Drilling14$89.95 · رصيد واحد
Mobile Plant Working Near-Around8$89.95 · رصيد واحد
Handheld Power Tools0$89.95 · رصيد واحد
Spotter11$89.95 · رصيد واحد
Bulk Excavations13$89.95 · رصيد واحد
Trench Excavation15$89.95 · رصيد واحد
Grader0$89.95 · رصيد واحد
Plumbing Drainage18$89.95 · رصيد واحد
Mobile Crane16$89.95 · رصيد واحد
Front-end Loader0$89.95 · رصيد واحد
Traffic Corridor - Establishing a Safe Work Zone8$89.95 · رصيد واحد
Plant Attachment Maintenance0$89.95 · رصيد واحد
Tipper and Dog16$89.95 · رصيد واحد
Culvert-Tank Installation12$89.95 · رصيد واحد
Manual Handling0$89.95 · رصيد واحد
Confined Space Work10$89.95 · رصيد واحد
Lasers9$89.95 · رصيد واحد
Sediment Fencing18$89.95 · رصيد واحد
Guided Boring Pipe Jacking Works17$89.95 · رصيد واحد
Silica Dust14$89.95 · رصيد واحد
Backhoe Loader0$89.95 · رصيد واحد
Construction Night Works4$89.95 · رصيد واحد
Hand Tools0$89.95 · رصيد واحد
Overhead Electric Lines - Working Near6$89.95 · رصيد واحد
Asphalt Patcher0$89.95 · رصيد واحد
Earthmoving Equipment23$89.95 · رصيد واحد
Falls from Heavy Vehicles0$89.95 · رصيد واحد
Nuclear Densometer12$89.95 · رصيد واحد
Outdoor Work0$89.95 · رصيد واحد
Dogman12$89.95 · رصيد واحد
Skid Steer0$89.95 · رصيد واحد
Electric Fusion - Poly Pipe Butt Welding (PPW)11$89.95 · رصيد واحد
Manual Handling18$89.95 · رصيد واحد
Excavator0$89.95 · رصيد واحد
Horizontal Directional Boring16$89.95 · رصيد واحد
Excavation Near Assets13$89.95 · رصيد واحد
Roller0$89.95 · رصيد واحد
Plumbing - Water Meter Installation16$89.95 · رصيد واحد
Geofabric Installation17$89.95 · رصيد واحد
Light Vehicle on Construction16$89.95 · رصيد واحد
Soil Compactor19$89.95 · رصيد واحد
Site Establishment11$89.95 · رصيد واحد
Remote Control Trench Roller15$89.95 · رصيد واحد
عند الشراء واحدًا تلو الآخر$4,137.70 · 46 أرصدة
ضمن هذه الحزمة$2,788.45 · 31 أرصدة توفّر $1,349.25

المراجعات

لا توجد مراجعات بعد.

كيف تعمل النماذج

جرّبه قبل أن تدفع.

  1. معاينة مجانية

    خطوات العمل والمخاطر والمهمة الأولى في كل نموذج متاحة للقراءة. دون تسجيل.

  2. جرّب المحرّر

    كيّف بيان SWMS تجريبيًا باسم شركتك ومهمتك وموقعك، على الحاسوب أو هاتفك.

  3. سجّل مجانًا

    تنتقل بياناتك وشعارك معك. وهذا النموذج يُفتح معبّأً مسبقًا.

  4. استخدم رصيدًا أو اشترِ مرة واحدة

    تتضمن الخطط المدفوعة أرصدة نماذج كل شهر. أو اشترِ هذا النموذج ليبقى لك.