عرض الوصول المبكر:وصول مبكر: خصم 30%، ما دمت مشتركًا.

احصل على العرض

مستندات النماذج مكتوبة باللغة الإنجليزية.

حزمة توفير · 32 نماذج

Civil Water and Sewerage Systems

حزمة توفير · PACK-50318

معاينة نموذج حزمة توفير Civil Water and Sewerage Systems
  • 32 نماذج
  • 32 بسعر 21
  • يصل في مجلد واحد في المكتبة

A set of 32 SWMS for civil contractors building water and sewerage systems: trench excavation, pipeline disinfecting, borehole drilling, drainage, soil testing and culvert and tank installation.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost 21 template credits instead of 32.

معاينة SWMS Soil Testing

Soil Testing

SWMSVersion 1
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following 'High-Risk Construction Work' (HRCW – identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Traffic CorridorsWork carried out adjacent to a road, railway or shipping lane, traffic corridor

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. Specify?

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Remote area emergency

      Before controls4 Acute
      Controls
      • Prepare a Remote / Isolated Work Plan. A signed copy must be taken by workers to the Remote/Isolated workplace each day, and the responsible supervisor must keep a copy at home base or head office

      • All relevant workers scheduled to work in the remote area are supplied with Personal Location Beacons (PLB)

      • All vehicles used to transport crew to remote locations are carrying Emergency Position Indicating Radio Beacon (EPIRB) onboard vehicle:

        • Cabin roof is marked with a specific identification number (for aerial identification.)

      • Complete a Departure Checklist (refer to Remote / Isolated Work Plan).

      After controls2 Moderate
      Responsible
      • The Organisationwill ensure 'Remote and Isolated Plan' is in place & check the site amenities are in place

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

10 خطوات عمل أخرى، من Travel to/from remote worksite إلى Emergency response

لكل منها مخاطرها وتقييمات خطورتها وإجراءات التحكم فيها، إضافة إلى توقيع طاقمك.

المعاينة بصيغة

كيف يبدو في المتصفح

احصل على حزمة التوفير هذه

سجّل مجانًا، ثم اختر الطريقة التي تناسبك. يُضاف كل مستند إلى مكتبتك، في مجلد يحمل اسم الحزمة.

  • مشمول في الخطط المدفوعة

    استخدم أرصدة النماذج من خطتك. تكلفة هذه الحزمة 21 بدلًا من 32.

    قارن الخطط والأسعار
  • اشترِه مرة واحدة

    $1,888.95 $2,878.40 تُدفع مرة واحدة، ويبقى ملكك. يعمل على الخطة المجانية أيضًا.

لا حاجة إلى بطاقة للتسجيل. يحصل أعضاء الوصول المبكر على خصم 30% على أي خطة.

ما يتضمنه

  1. Soil Testing

    SWMS · 11 خطوات عمل

    Soil Testing SWMS: 11 job steps from remote travel and set-up to soil testing, mobile plant, completion and emergency response.

    يُباع أيضًا منفردًا
  2. Pipeline Disinfecting

    SWMS · 12 خطوات عمل

    SWMS for disinfecting pipelines that carry potable water: chlorine handling, water testing, injecting the mains, refuelling, environment and emergencies.

    يُباع أيضًا منفردًا
  3. Vehicle Mounted Borehole Drilling

    SWMS · 14 خطوات عمل

    Vehicle Mounted Borehole Drilling SWMS: 14 job steps covering travel, work area set-up, drilling, maintenance, fuelling and emergencies.

    يُباع أيضًا منفردًا
  4. Mobile Plant Working Near-Around

    SWMS · 8 خطوات عمل

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    يُباع أيضًا منفردًا
  5. Spotter

    SWMS · 11 خطوات عمل

    SWMS for spotters and safety observers: traffic and mobile plant, work near overhead and underground assets, scaffolding and EWPs, roll-over and first aid.

    يُباع أيضًا منفردًا
  6. Bulk Excavations

    SWMS · 13 خطوات عمل

    SWMS for bulk excavation work: planning, plant operation, shoring, water-charged ground, silica dust, re-fuelling, environmental controls and emergencies.

    يُباع أيضًا منفردًا
  7. Trench Excavation

    SWMS · 15 خطوات عمل

    Trench Excavation SWMS: 15 job steps covering excavating and working in trenches over 1.5 m deep, from planning to emergency response.

    يُباع أيضًا منفردًا
  8. Plumbing Drainage

    SWMS · 18 خطوات عمل

    Plumbing drainage SWMS for installing pipes, stormwater tanks and polyethylene pipe welding, and for sewage and stormwater drainage on civil works.

    يُباع أيضًا منفردًا
  9. Mobile Crane

    SWMS · 16 خطوات عمل

    Mobile Crane SWMS: 16 job steps covering power lines, set-up, load equipment checks, lifting, maintenance, refuelling and emergencies.

    يُباع أيضًا منفردًا
  10. Traffic Corridor - Establishing a Safe Work Zone

    SWMS · 8 خطوات عمل

    Traffic corridor SWMS: 8 job steps covering the traffic management plan, safe work zone set-up, traffic controllers, pedestrians and zone takeouts.

    يُباع أيضًا منفردًا
  11. Tipper and Dog

    SWMS · 16 خطوات عمل

    Hazards and controls for operating a tip truck and dog trailer, including side tippers, from coupling trailers to tipping, refuelling and emergency response.

    يُباع أيضًا منفردًا
  12. Culvert-Tank Installation

    SWMS · 12 خطوات عمل

    Culvert-Tank Installation SWMS: 12 job steps for installing culverts, tanks and similar structures, from planning to emergency response.

    يُباع أيضًا منفردًا
  13. Confined Space Work

    SWMS · 10 خطوات عمل

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    يُباع أيضًا منفردًا
  14. Lasers

    SWMS · 9 خطوات عمل

    Lasers SWMS: 9 job steps covering Class 1, 2 and 3R construction lasers, beam set-up, eye injury, mobile plant, roadside work and emergencies.

    يُباع أيضًا منفردًا
  15. Sediment Fencing

    SWMS · 18 خطوات عمل

    SWMS for installing sediment and safety fencing: machine set-up, wire straining, nail and staple guns, refuelling and emergency response.

    يُباع أيضًا منفردًا
  16. Guided Boring Pipe Jacking Works

    SWMS · 17 خطوات عمل

    A SWMS for guided boring and pipe jacking works: the hazards and controls for excavating launch and retrieval pits, hoisting and running the machine.

    يُباع أيضًا منفردًا
  17. Silica Dust

    SWMS · 14 خطوات عمل

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    يُباع أيضًا منفردًا
  18. Construction Night Works

    SWMS · 4 خطوات عمل

    SWMS for general construction work at night: planning, work area set-up, night works and emergency response, with lighting, plant and fatigue controls.

    يُباع أيضًا منفردًا
  19. Overhead Electric Lines - Working Near

    SWMS · 6 خطوات عمل

    Overhead Electric Lines SWMS: 6 job steps covering exclusion zones, spotters, mobile plant near powerlines and emergency response.

    يُباع أيضًا منفردًا
  20. Earthmoving Equipment

    SWMS · 23 خطوات عمل

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    يُباع أيضًا منفردًا
  21. Nuclear Densometer

    SWMS · 12 خطوات عمل

    Nuclear Densometer SWMS: 12 job steps covering storage, transport, radiation exposure, mobile plant, trenches and emergencies.

    يُباع أيضًا منفردًا
  22. Dogman

    SWMS · 12 خطوات عمل

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    يُباع أيضًا منفردًا
  23. Electric Fusion - Poly Pipe Butt Welding (PPW)

    SWMS · 11 خطوات عمل

    Electric fusion poly pipe butt welding SWMS: 11 job steps covering mobile plant, hazardous atmospheres, hot plate and facer use, and emergencies.

    يُباع أيضًا منفردًا
  24. Manual Handling

    SWMS · 18 خطوات عمل

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    يُباع أيضًا منفردًا
  25. Horizontal Directional Boring

    SWMS · 16 خطوات عمل

    SWMS for horizontal directional boring: locating underground services, drilling, service strikes, rig maintenance, refuelling and emergencies.

    يُباع أيضًا منفردًا
  26. Excavation Near Assets

    SWMS · 13 خطوات عمل

    SWMS for excavating near underground services and assets: site planning, survey, work area set-up, contact with utilities and emergency response.

    يُباع أيضًا منفردًا
  27. Plumbing - Water Meter Installation

    SWMS · 16 خطوات عمل

    Plumbing SWMS for installing water meters: 16 job steps from site assessment and electrical hazards to excavation, confined space and emergency response.

    يُباع أيضًا منفردًا
  28. Geofabric Installation

    SWMS · 17 خطوات عمل

    Geofabric Installation SWMS: 17 job steps covering delivery, crane placement, rolling out, seaming and securing geomembrane on dams and landfills.

    يُباع أيضًا منفردًا
  29. Light Vehicle on Construction

    SWMS · 16 خطوات عمل

    Light Vehicle on Construction SWMS: 16 job steps covering travel, loading, fuelling, breakdowns, accidents, mobile plant and emergencies.

    يُباع أيضًا منفردًا
  30. Soil Compactor

    SWMS · 19 خطوات عمل

    SWMS for soil compactor work: weather, site set-up, overhead lines, slopes, silica dust, refuelling, ground workers and emergency response.

    يُباع أيضًا منفردًا
  31. Site Establishment

    SWMS · 11 خطوات عمل

    Site Establishment SWMS: 11 job steps from planning and traffic management to tools, site set-up, working at height and emergency response.

    يُباع أيضًا منفردًا
  32. Remote Control Trench Roller

    SWMS · 15 خطوات عمل

    SWMS for operating a remote control trench roller: transport, set-up, trench work, mobile plant, hydraulics, environment and emergencies.

    يُباع أيضًا منفردًا

ما يغطيه

المخاطر التي يغطيها

التشريعات والمعايير التي يستند إليها

يأتي كل SWMS مع قائمة مراجع التشريعات ومدونات الممارسة الخاصة بنا.

ما توفّره

النموذجخطوات العملمنفردًا
Soil Testing11$89.95 · رصيد واحد
Pipeline Disinfecting12$89.95 · رصيد واحد
Vehicle Mounted Borehole Drilling14$89.95 · رصيد واحد
Mobile Plant Working Near-Around8$89.95 · رصيد واحد
Spotter11$89.95 · رصيد واحد
Bulk Excavations13$89.95 · رصيد واحد
Trench Excavation15$89.95 · رصيد واحد
Plumbing Drainage18$89.95 · رصيد واحد
Mobile Crane16$89.95 · رصيد واحد
Traffic Corridor - Establishing a Safe Work Zone8$89.95 · رصيد واحد
Tipper and Dog16$89.95 · رصيد واحد
Culvert-Tank Installation12$89.95 · رصيد واحد
Confined Space Work10$89.95 · رصيد واحد
Lasers9$89.95 · رصيد واحد
Sediment Fencing18$89.95 · رصيد واحد
Guided Boring Pipe Jacking Works17$89.95 · رصيد واحد
Silica Dust14$89.95 · رصيد واحد
Construction Night Works4$89.95 · رصيد واحد
Overhead Electric Lines - Working Near6$89.95 · رصيد واحد
Earthmoving Equipment23$89.95 · رصيد واحد
Nuclear Densometer12$89.95 · رصيد واحد
Dogman12$89.95 · رصيد واحد
Electric Fusion - Poly Pipe Butt Welding (PPW)11$89.95 · رصيد واحد
Manual Handling18$89.95 · رصيد واحد
Horizontal Directional Boring16$89.95 · رصيد واحد
Excavation Near Assets13$89.95 · رصيد واحد
Plumbing - Water Meter Installation16$89.95 · رصيد واحد
Geofabric Installation17$89.95 · رصيد واحد
Light Vehicle on Construction16$89.95 · رصيد واحد
Soil Compactor19$89.95 · رصيد واحد
Site Establishment11$89.95 · رصيد واحد
Remote Control Trench Roller15$89.95 · رصيد واحد
عند الشراء واحدًا تلو الآخر$2,878.40 · 32 أرصدة
ضمن هذه الحزمة$1,888.95 · 21 أرصدة توفّر $989.45

المراجعات

لا توجد مراجعات بعد.

كيف تعمل النماذج

جرّبه قبل أن تدفع.

  1. معاينة مجانية

    خطوات العمل والمخاطر والمهمة الأولى في كل نموذج متاحة للقراءة. دون تسجيل.

  2. جرّب المحرّر

    كيّف بيان SWMS تجريبيًا باسم شركتك ومهمتك وموقعك، على الحاسوب أو هاتفك.

  3. سجّل مجانًا

    تنتقل بياناتك وشعارك معك. وهذا النموذج يُفتح معبّأً مسبقًا.

  4. استخدم رصيدًا أو اشترِ مرة واحدة

    تتضمن الخطط المدفوعة أرصدة نماذج كل شهر. أو اشترِ هذا النموذج ليبقى لك.