Early access offer:Early access: 30% off, for as long as you stay subscribed.

Claim offer
Try the editor free

System · 133 documentsPart of Mechanical Engineering Integrated Industry Suite

Waterjet Cutter

SOP · SOP-60007

  • Version 4

The Waterjet Cutter Safe Operating Procedure (SOP) is designed to help businesses implement safe practices when using a waterjet cutter.

It covers the hazards (noise, electricity and high-pressure water), the PPE to wear, operator training, a pre-operational inspection, step-by-step operation, shut down, maintenance including LOTO, and a hazard checklist for powered non-mobile plant.

It can be added to your existing management system and used to help ensure workers are adequately trained.

See its own page

Preview of the Waterjet Cutter SOP

Waterjet Cutting Machine SOP

SOPVersion 4

Acronyms

  • LOTO - Lockout/Tagout.

  • PPE - Personal Protective Equipment.

  • SOP - Safe Operating Procedure.

Hazards

  • Noise

  • Electricity

  • Hot surfaces

  • Bacteria build-up

  • Moving objects

  • Sharp, flying debris

  • Water under high pressure

  • Slippery walkway

  • Manual Handling

Waterjet cutting head with nozzle cutting a pattern into a workpiece on the machine table

Personal protective equipment

  • Foot Protection
  • Eye Protection
  • Hand Protection
  • Hearing Protection

Pre-operational inspection

Follow the pre-operational checklist in the manufacturer’s operational manual, ensure:

  • Power cord undamaged/good condition, test and tagged – current as per legislative requirement

  • Emergency STOP buttons are operational and are pulled out

  • Pump guards in place

  • The table is clear of debris & other objects

  • Guards in place, undamaged

  • Controls labelled and working correctly

  • No trip hazards present in the work area

  • Area is clear of other persons.

Precautions

4 more sections, from Operation to Hazard checklist (powered non-mobile plant)

Written in full, ready for your business's details.

Preview as

How it reads in a browser

Get this system

Sign up free, then choose how you'd like it. Every document goes into your Library, in a folder named for the pack.

  • Included in paid plans

    Use template credits from your plan. This one costs 20.

    Compare plans and prices
  • Buy it once

    $999.90 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What it covers

9 sections

  1. Hazards
  2. Personal protective equipment
  3. Pre-operational inspection
  4. Precautions
  5. Operation
  6. Maintenance
  7. Shut down
  8. Hazard checklist (powered non-mobile plant)

Plus definitions

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.