Early access offer:Early access: 30% off, for as long as you stay subscribed.

Claim offer
Try the editor free

System · 133 documentsPart of Mechanical Engineering Integrated Industry Suite

Threading Machine

SOP · SOP-60059

  • Version 4

The Threading Machine safe operating procedure gives step-by-step instructions for operating a pipe threading machine so your team can work safely and efficiently.

It covers the hazards, the precautions and operator training, the pre-operational inspection and maintenance, then the operation: installing, cutting, reaming and removing pipe, and shutdown.

A hazard checklist for powered non-mobile plant completes it. Add it to your existing management system to help make sure workers are adequately trained.

See its own page

Preview of the Threading Machine SOP

Threading Machine

SOPVersion 4

Acronyms

  • LOTO - Lockout/Tagout.

  • PPE - Personal Protective Equipment.

  • SOP - Safe Operating Procedure.

  • FOR - Forward.

  • REV - Reverse.

Operator using a threading machine, with its cutter, reamer and die head at the front

9 more sections

  1. Hazards
  2. Personal protective equipment
  3. Precautions
  4. Pre-operational inspection
  5. Maintenance
  6. and 4 more

Written in full, ready for your business's details.

Preview as

How it reads in a browser

Get this system

Sign up free, then choose how you'd like it. Every document goes into your Library, in a folder named for the pack.

  • Included in paid plans

    Use template credits from your plan. This one costs 20.

    Compare plans and prices
  • Buy it once

    $999.90 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What it covers

10 sections

  1. Hazards
  2. Personal protective equipment
  3. Precautions
  4. Pre-operational inspection
  5. Maintenance
  6. Operation
  7. Work area
  8. Shutdown
  9. Hazard checklist (powered non-mobile plant)

Plus definitions

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.