Bites and Stings Prevention and Treatment
- Company doing the work
- [Company]
- Business contact
- —
- Phone #
- —
- Responsible person (for monitoring SWMS and work)
- —
- Signature
- —
- Date
- —
- Contact phone #
- —
- Principal contractor (PC)
- [Principal contractor]
- PC address
- —
- PC phone #
- [PC phone]
- Date SWMS provided to PC
- —
- Job site address
- [Site address]
- Is the work associated with a construction project?
- —
Site management plan
If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.
High-risk construction work
This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)
None listed.
Planning and preparation
Planning/Preparation
Liaise with Principal Contractor to identify on-site safety systems and procedures
Establish supervisory and communication arrangements
Principal contractor to confirm emergency response procedures are in place.
Hold points
Hold points identified and signed off before continuing work. (specify the hold points)
Training/Licence
All workers to have a General Construction Induction Card
Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.
Trained First Aider on site
All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.
Worker duties and responsibilities
Fit condition for work, i.e., no signs of fatigue, alcohol or drugs
Attend all site inductions/briefings
Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)
Only carry out work related to the contract
Inspect completed work and report possible safety, environmental and quality matters to the supervisor.
Monitoring and review
All people involved in the task must have this SWMS communicated to them before work commences
SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident
If additional site hazards identified, review this SWMS and amend control measures to suit
People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP
Give the principal contractor a copy of the revised SWMS
The site supervisor to monitor works against the controls stated in this SWMS
SWMS must be kept on-site and made available for inspection or review
Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident
Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.
Site-specific notes
Legislation and codes of practice
None listed.
Personal protective equipment (PPE)
- Foot Protection
- Hand Protection
Job steps, hazards and controls
- Work activity
Planning
- Hazard
Working alone
Before controls4 AcuteControlsEnsure that workers do not work in isolation where contact with snakes is likely:
If working in isolation cannot be avoided, implement a regular check-in process to ensure regular contact
Establish communication systems.
After controls2 ModerateResponsible- Supervisorto undertake all planning processes
- Hazard
Bites & stings from insects, reptiles and hazardous plants
Before controls3 HighControlsEnsure that all workers have undertaken training and received instruction for recognising bite/sting symptoms and providing first aid treatment
First Aid requirements:
Provision of first aid equipment - adequate Bites/Stings First Aid kit is available
Each worker must have access to the equipment
Workers have access to facilities for the administration of first aid
people with known allergic responses should consult a doctor and ensure appropriate kit is available at all times (Including EpiPen - in date).
After controls2 ModerateResponsible
IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute
Overall risk after controls2 MModeratethe highest rating after controls
8 more job steps, from Exposure to the elements to Emergency response
Each with its hazards, risk ratings and controls, plus your crew's sign-on.