Oferta de acceso anticipado:Acceso anticipado: 30% de descuento, mientras sigas suscrito.

Aprovechar la oferta

Las plantillas están escritas en inglés.

Paquete ahorro · 15 plantillas

Asbestos Removal Combo

Paquete ahorro · PACK-50362

Vista previa de la plantilla Paquete ahorro Asbestos Removal Combo
  • 15 plantillas
  • 15 por el precio de 12
  • Llega en una carpeta de la Biblioteca

A set of six SWMS, seven SOPs and two plans for licensed asbestos removalists.

The SWMS cover licensed asbestos removal, asbestos transport and disposal, demolition, roofing removal and power tools. The SOPs include Mobile Scaffolding, Extension Ladder and Handheld Power Tools. It also includes Falls Emergency Rescue Plan and Asbestos Removal Control Plan.

Each document is the same one sold on its own, so you get every update to it. Together they cost 12 template credits instead of 15.

Vista previa de SOP Extension Ladder

Extension Ladder

SOPVersion 4

Acronyms

  • LOTO - Lockout/Tagout.

  • PPE - Personal Protective Equipment.

  • SOP - Safe Operating Procedure.

6 secciones más

  1. Hazards
  2. Personal protective equipment
  3. Pre-operational inspection
  4. Precautions
  5. Operation
  6. y 1 más

Escritas completas, listas para los datos de tu negocio.

Ver como

Cómo se ve en un navegador

Consigue este paquete ahorro

Regístrate gratis y luego elige cómo lo quieres. Cada documento va a tu Biblioteca, en una carpeta con el nombre del paquete.

  • Incluido en los planes de pago

    Usa créditos de plantilla de tu plan. Este paquete cuesta 12 en vez de 15.

    Comparar planes y precios
  • Cómprala una sola vez

    $1,079.40 $1,349.25 pago único, y es tuya para siempre. También sirve con el plan Gratis.

No necesitas tarjeta para registrarte. Los miembros con acceso anticipado tienen un 30% de descuento en cualquier plan.

Qué incluye

  1. Extension Ladder

    SOP · 7 secciones

    Extension ladder safe operating procedure: hazards, pre-use inspection, transporting, set-up, use and carrying, with a training register.

    También se vende por separado
  2. Demolition

    SWMS · 9 pasos del trabajo

    SWMS for demolition: planning, disconnecting services, site systems, environment, mechanical and manual demolition, monitoring and emergencies.

    También se vende por separado
  3. Falls Emergency Rescue Plan

    Plan de gestión · 14 secciones

    A pre-planned procedure for rescuing a worker who has fallen and is suspended in a harness, with a pre-planning checklist and a site-specific rescue plan.

    También se vende por separado
  4. Handheld Power Tools

    SOP · 9 secciones

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    También se vende por separado
  5. Manual Handling

    SOP · 5 secciones

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    También se vende por separado
  6. Asbestos Licensed Removal

    SWMS · 21 pasos del trabajo

    Safe work method statement for licensed removal of friable and non-friable asbestos over 10 m2, with 21 job steps from planning to clearance.

    También se vende por separado
  7. Platform Ladder

    SOP · 7 secciones

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    También se vende por separado
  8. Hand Tools

    SOP · 9 secciones

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    También se vende por separado
  9. Powered Non-powered Tools

    SWMS · 12 pasos del trabajo

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    También se vende por separado
  10. Scissor Lift

    SOP · 10 secciones

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    También se vende por separado
  11. Manual Handling

    SWMS · 18 pasos del trabajo

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    También se vende por separado
  12. Roofing Removal

    SWMS · 13 pasos del trabajo

    Roofing Removal SWMS: 13 job steps covering fall rescue planning, scaffold and ladder access, roof removal, asbestos and emergency response.

    También se vende por separado
  13. Asbestos Transport - Disposal

    SWMS · 8 pasos del trabajo

    SWMS for transporting and disposing of asbestos-containing material: planning, loading and unloading, travel, environmental controls and emergency response.

    También se vende por separado
  14. Asbestos Removal Control Plan

    Plan de gestión · 11 secciones

    A plan for those carrying out asbestos removal: identification, emergency plan, PPE, removal methods, waste, decontamination and an inspection checklist.

    También se vende por separado
  15. Mobile Scaffolding

    SOP · 8 secciones

    Safe operating procedure for mobile scaffolding: hazards, PPE, inspection, erecting, moving and dismantling, and a working at height checklist.

    También se vende por separado

Qué cubre

Peligros que cubre

Legislación y normas que cita

Cada SWMS incluye nuestra lista de referencia de legislación y códigos de práctica.

Lo que ahorras

PlantillaPasos del trabajoPor separado
Extension Ladder0$89.95 · 1 crédito
Demolition9$89.95 · 1 crédito
Falls Emergency Rescue Plan0$89.95 · 1 crédito
Handheld Power Tools0$89.95 · 1 crédito
Manual Handling0$89.95 · 1 crédito
Asbestos Licensed Removal21$89.95 · 1 crédito
Platform Ladder0$89.95 · 1 crédito
Hand Tools0$89.95 · 1 crédito
Powered Non-powered Tools12$89.95 · 1 crédito
Scissor Lift0$89.95 · 1 crédito
Manual Handling18$89.95 · 1 crédito
Roofing Removal13$89.95 · 1 crédito
Asbestos Transport - Disposal8$89.95 · 1 crédito
Asbestos Removal Control Plan0$89.95 · 1 crédito
Mobile Scaffolding0$89.95 · 1 crédito
Comprando uno por uno$1,349.25 · 15 créditos
En este paquete$1,079.40 · 12 créditos Ahorras $269.85

Opiniones

Todavía no hay opiniones.

Cómo funcionan las plantillas

Pruébalo antes de pagar.

  1. Vista previa gratis

    Los pasos del trabajo, los peligros y la primera tarea de cada plantilla se pueden leer. Sin registrarte.

  2. Prueba el editor

    Adapta un SWMS de demostración con tu empresa, tu trabajo y tu obra, en una computadora o en tu teléfono.

  3. Regístrate gratis

    Tus datos y tu logo se pasan. Esta plantilla se abre ya rellenada.

  4. Usa un crédito o compra una sola vez

    Los planes de pago incluyen créditos de plantilla cada mes. O compra esta para quedártela.