Six SWMS for licensed asbestos removalists: licensed asbestos removal, asbestos transport and disposal, demolition, roofing removal and power tools.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost five template credits instead of six.

Vista previa de SWMS Demolition

Demolition

SWMSVersion 10
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Asbestos
  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous LinesChemical, fuel or refrigerant lines
  • Energised ElectricalEnergised electrical installations or services
  • Structural AlterationsStructures or buildings involving structural alterations or repairs that require temporary support to prevent collapse
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and Preparation

Planning / Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training / Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor / Review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Breathing Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Lack of planning - potential injury, property damage &/or environmental incident

      Before controls4 Acute
      Controls
      • Liaise with the building owner and obtain as applicable:

        • Drawings

        • Site survey

        • Plan of services

        • Structural engineer report

        • Existing defects

        • All chemicals, volatile fuels and gases deactivated

        • Hazardous Materials Registers (asbestos/lead)

        • Relationship to surrounding properties

        • Landscape Plan.

        • Vermin has been removed

        • Ensure vacant buildings are secure against fire risk.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Regulatory breach

      Before controls3 High
      Controls
      • All notices, permits and licences are in place before work commencing

      • Ensure that written notice is given to the regulator at least 5 days before demolition work commences in the following cases

        1. Demolition of a structure, or a part of a structure that is loadbearing and is at least 6 metres in height

        2. Demolition work involving load shifting machinery on a suspended floor

        3. Demolition work involving explosives.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Unpermitted work

      Before controls4 Acute
      Controls
      • Ensure all permits are issued

      • A “Competent Person must complete the Permit.”

      • Permit to be signed by all relevant personnel before work commences and displayed in the work area at all times.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Exposure to silica dust

      Before controls4 Acute
      Controls
      • Training and Information provided to workers on respirable crystalline silica (RCS) should include:

        • Identification of RCS dust through Material/Safety Datasheet (M/SDS) or labels

        • Dust exposure prevention strategies

        • Checking controls are working and using them

        • When and how to use respiratory protective equipment and what to do if something goes wrong (Including worker respirator fit and check processes).

      After controlsNot rated
      Responsible
      • Supervisor
    • Hazard

      Untrained &/or unlicensed workers

      Before controls3 High
      Controls
      • All contractors and their workers must have relevant training and licensing

      • Liaise with contractors to confirm their SWMS is suitable and available for review

      • All workers are to work under the applicable contractor SWMS

      • If a conflict in controls is identified between this SWMS and a contractor SWMS, stop work until the relevant SWMS are amended, and workers informed of changes.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

8 pasos más del trabajo, de Establish a Demolition Work Plan (DWP) a Emergency response

Cada uno con sus peligros, niveles de riesgo y controles, además de las firmas de tu equipo.

Ver como

Cómo se ve en un navegador

Consigue este paquete ahorro

Regístrate gratis y luego elige cómo lo quieres. Cada documento va a tu Biblioteca, en una carpeta con el nombre del paquete.

  • Incluido en los planes de pago

    Usa créditos de plantilla de tu plan. Este paquete cuesta 5 en vez de 6.

    Comparar planes y precios
  • Cómprala una sola vez

    $449.75 $539.70 pago único, y es tuya para siempre. También sirve con el plan Gratis.

No necesitas tarjeta para registrarte. Los miembros con acceso anticipado tienen un 30% de descuento en cualquier plan.

Qué incluye

  1. Demolition

    SWMS · 9 pasos del trabajo

    SWMS for demolition: planning, disconnecting services, site systems, environment, mechanical and manual demolition, monitoring and emergencies.

    También se vende por separado
  2. Asbestos Licensed Removal

    SWMS · 21 pasos del trabajo

    Safe work method statement for licensed removal of friable and non-friable asbestos over 10 m2, with 21 job steps from planning to clearance.

    También se vende por separado
  3. Powered Non-powered Tools

    SWMS · 12 pasos del trabajo

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    También se vende por separado
  4. Manual Handling

    SWMS · 18 pasos del trabajo

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    También se vende por separado
  5. Roofing Removal

    SWMS · 13 pasos del trabajo

    Roofing Removal SWMS: 13 job steps covering fall rescue planning, scaffold and ladder access, roof removal, asbestos and emergency response.

    También se vende por separado
  6. Asbestos Transport - Disposal

    SWMS · 8 pasos del trabajo

    SWMS for transporting and disposing of asbestos-containing material: planning, loading and unloading, travel, environmental controls and emergency response.

    También se vende por separado

Qué cubre

Peligros que cubre

Legislación y normas que cita

Cada SWMS incluye nuestra lista de referencia de legislación y códigos de práctica.

Lo que ahorras

PlantillaPasos del trabajoPor separado
Demolition9$89.95 · 1 crédito
Asbestos Licensed Removal21$89.95 · 1 crédito
Powered Non-powered Tools12$89.95 · 1 crédito
Manual Handling18$89.95 · 1 crédito
Roofing Removal13$89.95 · 1 crédito
Asbestos Transport - Disposal8$89.95 · 1 crédito
Comprando uno por uno$539.70 · 6 créditos
En este paquete$449.75 · 5 créditos Ahorras $89.95

Opiniones

Todavía no hay opiniones.

Cómo funcionan las plantillas

Pruébalo antes de pagar.

  1. Vista previa gratis

    Los pasos del trabajo, los peligros y la primera tarea de cada plantilla se pueden leer. Sin registrarte.

  2. Prueba el editor

    Adapta un SWMS de demostración con tu empresa, tu trabajo y tu obra, en una computadora o en tu teléfono.

  3. Regístrate gratis

    Tus datos y tu logo se pasan. Esta plantilla se abre ya rellenada.

  4. Usa un crédito o compra una sola vez

    Los planes de pago incluyen créditos de plantilla cada mes. O compra esta para quedártela.