Eight SWMS for bricklayers and block layers: brick and block laying, brick cleaning, scaffolds, silica dust, elevating work platforms and construction labouring.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost six template credits instead of eight.

Vista previa de SWMS Brick and Block Laying

Brick and Block Laying

SWMSVersion 11
Company doing the work
[Company]
Business contact
—
Phone #
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's signature
—
Date signed
—
Contact phone #
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone #
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Structural AlterationsStructures or buildings involving structural alterations or repairs that require temporary support to prevent collapse
  • FallsInvolves a risk of a person falling from 2m or more, including work on telecommunications towers

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Breathing Protection
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Provide training on the health effects associated with RCS

    • Hazard

      Exposure to respirable crystalline silica (RCS) – dust inhalation

      Before controls4 Acute
      Controls
      • Training and Information provided to workers on RCS should include:

        • Identification of RCS dust through Safety Datasheet (SDS) or labels

        • Dust exposure prevention strategies

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes).

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

21 pasos más del trabajo, de Planning access to the height location a Emergency response

Cada uno con sus peligros, niveles de riesgo y controles, además de las firmas de tu equipo.

Ver como

Cómo se ve en un navegador

Consigue este paquete ahorro

Regístrate gratis y luego elige cómo lo quieres. Cada documento va a tu Biblioteca, en una carpeta con el nombre del paquete.

  • Incluido en los planes de pago

    Usa créditos de plantilla de tu plan. Este paquete cuesta 6 en vez de 8.

    Comparar planes y precios
  • Cómprala una sola vez

    $539.70 $719.60 pago único, y es tuya para siempre. También sirve con el plan Gratis.

No necesitas tarjeta para registrarte. Los miembros con acceso anticipado tienen un 30% de descuento en cualquier plan.

Qué incluye

  1. Brick and Block Laying

    SWMS · 22 pasos del trabajo

    SWMS for brick and block laying: silica dust, materials delivery, mortar, cutting and laying, core steel, acid washing, scaffolds and ladders, and emergencies.

    También se vende por separado
  2. Construction Labourer

    SWMS · 16 pasos del trabajo

    Construction Labourer SWMS: 16 job steps for labourers on construction sites, from silica dust and mobile plant to ladders and emergency response.

    También se vende por separado
  3. Brick Cleaning

    SWMS · 13 pasos del trabajo

    SWMS for cleaning brickwork with high-pressure cleaners and a hydrochloric acid solution, from mixing and cleaning to refuelling and emergencies.

    También se vende por separado
  4. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 pasos del trabajo

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    También se vende por separado
  5. Working on Scaffolds

    SWMS · 7 pasos del trabajo

    Working on Scaffolds SWMS: 7 job steps covering scaffold inspection, general use, mobile scaffolds, trestles, emergencies and incidents.

    También se vende por separado
  6. Powered Non-powered Tools

    SWMS · 12 pasos del trabajo

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    También se vende por separado
  7. Manual Handling

    SWMS · 18 pasos del trabajo

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    También se vende por separado
  8. Silica Dust

    SWMS · 14 pasos del trabajo

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    También se vende por separado

Qué cubre

Peligros que cubre

Legislación y normas que cita

Cada SWMS incluye nuestra lista de referencia de legislación y códigos de práctica.

Lo que ahorras

PlantillaPasos del trabajoPor separado
Brick and Block Laying22$89.95 · 1 crédito
Construction Labourer16$89.95 · 1 crédito
Brick Cleaning13$89.95 · 1 crédito
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 crédito
Working on Scaffolds7$89.95 · 1 crédito
Powered Non-powered Tools12$89.95 · 1 crédito
Manual Handling18$89.95 · 1 crédito
Silica Dust14$89.95 · 1 crédito
Comprando uno por uno$719.60 · 8 créditos
En este paquete$539.70 · 6 créditos Ahorras $179.90

Opiniones

Todavía no hay opiniones.

Cómo funcionan las plantillas

Pruébalo antes de pagar.

  1. Vista previa gratis

    Los pasos del trabajo, los peligros y la primera tarea de cada plantilla se pueden leer. Sin registrarte.

  2. Prueba el editor

    Adapta un SWMS de demostración con tu empresa, tu trabajo y tu obra, en una computadora o en tu teléfono.

  3. Regístrate gratis

    Tus datos y tu logo se pasan. Esta plantilla se abre ya rellenada.

  4. Usa un crédito o compra una sola vez

    Los planes de pago incluyen créditos de plantilla cada mes. O compra esta para quedártela.