Oferta de acceso anticipado:Acceso anticipado: 30% de descuento, mientras sigas suscrito.

Aprovechar la oferta

Las plantillas están escritas en inglés.

Prueba el editor gratis
Paquete ahorro · 30 plantillas

Carpentry on Construction Combo

Paquete ahorro · PACK-50334

Vista previa de la plantilla Paquete ahorro Carpentry on Construction Combo
  • 30 plantillas
  • 30 por el precio de 24
  • Llega en una carpeta de la Biblioteca

A set of ten SWMS and 20 SOPs for carpenters working on construction sites.

The SWMS cover lock-up and fix stage carpentry, decking, cladding, cabinet installation and framing and trusses. The SOPs include Table Saw, Reciprocating Saw and Handheld Circular Saw.

Each document is the same one sold on its own, so you get every update to it. Together they cost 24 template credits instead of 30.

Vista previa de SWMS Internal External Lock-Up Fix Stage Carpentry

Internal External Lock-Up Fix Stage Carpentry

SWMSVersion 10
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column):

  • Mobile PlantMobile plant movement
  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous LinesChemical, fuel or refrigerant lines
  • Energised ElectricalEnergised electrical installations or services
  • FallsInvolves a risk of a person falling from 2m or more
  • Telecom TowersIncluding work on telecommunications towers

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers are trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract.

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences.

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards are identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

(add site-specific notes)

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Provide training on the health effects associated with RCS

    • Hazard

      Exposure to respirable crystalline silica (RCS) – dust inhalation

      Before controls3 High
      Controls
      • Training and Information provided to workers on RCS should include the following:

        • Identification of RCS dust through Material/Safety Datasheet (M/SDS) or labels

        • Dust exposure prevention

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes)

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

14 pasos más del trabajo, de Check weather conditions & prepare a Emergency response

Cada uno con sus peligros, niveles de riesgo y controles, además de las firmas de tu equipo.

Ver como

Cómo se ve en un navegador

Consigue este paquete ahorro

Regístrate gratis y luego elige cómo lo quieres. Cada documento va a tu Biblioteca, en una carpeta con el nombre del paquete.

  • Incluido en los planes de pago

    Usa créditos de plantilla de tu plan. Este paquete cuesta 24 en vez de 30.

    Comparar planes y precios
  • Cómprala una sola vez

    $2,158.80 $2,698.50 pago único, y es tuya para siempre. También sirve con el plan Gratis.

No necesitas tarjeta para registrarte. Los miembros con acceso anticipado tienen un 30% de descuento en cualquier plan.

Qué incluye

  1. Internal External Lock-Up Fix Stage Carpentry

    SWMS · 15 pasos del trabajo

    Covers internal and external lock-up and fix stage carpentry, with the risks and controls for each job step from site arrival to emergency response.

    También se vende por separado
  2. Battery Charging and Handling

    SOP · 7 secciones

    Safe operating procedure for charging and handling batteries: hazards, emergency response to acid splashes, PPE, precautions, recharging area and battery movement.

    También se vende por separado
  3. Table Saw

    SOP · 9 secciones

    Safe operating procedure for a table saw: hazards, PPE, precautions, pre-operational inspection, operation, kickback prevention and a hazard checklist.

    También se vende por separado
  4. Mobile Plant Working Near-Around

    SWMS · 8 pasos del trabajo

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    También se vende por separado
  5. Reciprocating Saw

    SOP · 9 secciones

    Safe operating procedure for a reciprocating saw: hazards, PPE, training, pre-operational inspection, maintenance, operation, first aid and a hazard checklist.

    También se vende por separado
  6. Trestle Scaffold

    SOP · 7 secciones

    Safe operating procedure for trestle scaffolds: hazards, PPE, training, pre-operational inspection, step-by-step operation and a training register.

    También se vende por separado
  7. Electric Air Compressor

    SOP · 9 secciones

    Safe operating procedure for an electric air compressor: hazards, PPE, inspection, operation, cleaning and a hazard checklist.

    También se vende por separado
  8. Manual Handling

    SOP · 5 secciones

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    También se vende por separado
  9. Decking

    SWMS · 19 pasos del trabajo

    SWMS for building a timber deck: falls from height, mobile plant, post footings, silica dust, wet cement and deck finishes.

    También se vende por separado
  10. Handheld Circular Saw

    SOP · 8 secciones

    Safe operating procedure for a handheld circular saw: hazards, PPE, precautions, inspection, operation, kickback and a hazard checklist.

    También se vende por separado
  11. Nail Gun - Battery Operated -

    SOP · 8 secciones

    Safe operating procedure for a battery-operated nail gun: hazards, PPE, battery charging, operation, jammed nails and a training register.

    También se vende por separado
  12. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 pasos del trabajo

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    También se vende por separado
  13. Docking Saw

    SOP · 10 secciones

    Safe operating procedure for a docking saw: hazards, PPE, pre-operational inspection, maintenance, step-by-step operation and a hazard checklist.

    También se vende por separado
  14. V Cut Mitre Saw

    SOP · 10 secciones

    Safe operating procedure for a V cut mitre saw: hazards, PPE, training, inspection, blade replacement, operation, maintenance and a hazard checklist.

    También se vende por separado
  15. Pneumatic Tools

    SOP · 8 secciones

    Safe operating procedure for pneumatic tools: hazards, PPE, precautions, maintenance, pre-operational inspection, operation and a hazard checklist.

    También se vende por separado
  16. Jigsaw

    SOP · 9 secciones

    Safe operating procedure for a jigsaw: hazards, PPE, training, pre-operational inspection, operation, blade replacement, maintenance and a hazard checklist.

    También se vende por separado
  17. Mitre/Drop Saw

    SOP · 8 secciones

    Safe operating procedure for a mitre or drop saw: hazards, PPE, precautions, inspection, maintenance, operation, blade replacement and a hazard checklist.

    También se vende por separado
  18. Hand Tools

    SOP · 9 secciones

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    También se vende por separado
  19. Handheld Router

    SOP · 9 secciones

    Safe operating procedure for a handheld router: hazards, PPE, training, inspection, maintenance, operating steps and a hazard checklist.

    También se vende por separado
  20. Cladding

    SWMS · 12 pasos del trabajo

    SWMS for installing cladding or siding, such as Hardie plank, on the outside of structures: delivery, access, silica dust, tools and emergencies.

    También se vende por separado
  21. Cabinet Installation

    SWMS · 12 pasos del trabajo

    SWMS for cabinet making and installation: client consultation, site set-up, tools, hazardous substances, dust control, ladders, cuts and emergencies.

    También se vende por separado
  22. Powered Non-powered Tools

    SWMS · 12 pasos del trabajo

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    También se vende por separado
  23. Scissor Lift

    SOP · 10 secciones

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    También se vende por separado
  24. Manual Handling

    SWMS · 18 pasos del trabajo

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    También se vende por separado
  25. Air Compressor

    SWMS · 9 pasos del trabajo

    SWMS for portable air compressor work: transport, set-up, operation, fuel and electrical hazards, noise, housekeeping, shut-down and emergencies.

    También se vende por separado
  26. Framing and Trusses - Timber-Steel

    SWMS · 15 pasos del trabajo

    SWMS for erecting timber and steel framing and trusses: delivery, working at height, standing frames, craning and bracing trusses, and emergency response.

    También se vende por separado
  27. Nail Gun - Pneumatic -

    SOP · 8 secciones

    Safe operating procedure for a pneumatic nail gun: hazards, PPE, training, inspection, maintenance, operation, jammed nails and a hazard checklist.

    También se vende por separado
  28. Working with Guarded Machinery

    SOP · 12 secciones

    Safe operating procedure for working with or near guarded machinery: hazards, PPE, maintenance and LOTO, cleaning, reporting and a hazard checklist.

    También se vende por separado
  29. Mobile Scaffolding

    SOP · 8 secciones

    Safe operating procedure for mobile scaffolding: hazards, PPE, inspection, erecting, moving and dismantling, and a working at height checklist.

    También se vende por separado
  30. Handheld Drill

    SOP · 9 secciones

    Safe operating procedure for a handheld drill: hazards, PPE, precautions, pre-operational inspection, operation, maintenance and a hazard checklist.

    También se vende por separado

Qué cubre

Peligros que cubre

Legislación y normas que cita

Cada SWMS incluye nuestra lista de referencia de legislación y códigos de práctica.

Lo que ahorras

PlantillaPasos del trabajoPor separado
Internal External Lock-Up Fix Stage Carpentry15$89.95 · 1 crédito
Battery Charging and Handling0$89.95 · 1 crédito
Table Saw0$89.95 · 1 crédito
Mobile Plant Working Near-Around8$89.95 · 1 crédito
Reciprocating Saw0$89.95 · 1 crédito
Trestle Scaffold0$89.95 · 1 crédito
Electric Air Compressor0$89.95 · 1 crédito
Manual Handling0$89.95 · 1 crédito
Decking19$89.95 · 1 crédito
Handheld Circular Saw0$89.95 · 1 crédito
Nail Gun - Battery Operated -0$89.95 · 1 crédito
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 crédito
Docking Saw0$89.95 · 1 crédito
V Cut Mitre Saw0$89.95 · 1 crédito
Pneumatic Tools0$89.95 · 1 crédito
Jigsaw0$89.95 · 1 crédito
Mitre/Drop Saw0$89.95 · 1 crédito
Hand Tools0$89.95 · 1 crédito
Handheld Router0$89.95 · 1 crédito
Cladding12$89.95 · 1 crédito
Cabinet Installation12$89.95 · 1 crédito
Powered Non-powered Tools12$89.95 · 1 crédito
Scissor Lift0$89.95 · 1 crédito
Manual Handling18$89.95 · 1 crédito
Air Compressor9$89.95 · 1 crédito
Framing and Trusses - Timber-Steel15$89.95 · 1 crédito
Nail Gun - Pneumatic -0$89.95 · 1 crédito
Working with Guarded Machinery0$89.95 · 1 crédito
Mobile Scaffolding0$89.95 · 1 crédito
Handheld Drill0$89.95 · 1 crédito
Comprando uno por uno$2,698.50 · 30 créditos
En este paquete$2,158.80 · 24 créditos Ahorras $539.70

Opiniones

Todavía no hay opiniones.

Cómo funcionan las plantillas

Pruébalo antes de pagar.

  1. Vista previa gratis

    Los pasos del trabajo, los peligros y la primera tarea de cada plantilla se pueden leer. Sin registrarte.

  2. Prueba el editor

    Adapta un SWMS de demostración con tu empresa, tu trabajo y tu obra, en una computadora o en tu teléfono.

  3. Regístrate gratis

    Tus datos y tu logo se pasan. Esta plantilla se abre ya rellenada.

  4. Usa un crédito o compra una sola vez

    Los planes de pago incluyen créditos de plantilla cada mes. O compra esta para quedártela.