Oferta de acceso anticipado:Acceso anticipado: 30% de descuento, mientras sigas suscrito.

Aprovechar la oferta

Las plantillas están escritas en inglés.

Prueba el editor gratis
Sistema · 140 documentos

Demolition Integrated Industry Suite

Sistema · SYS-50376

Vista previa de la plantilla Sistema Demolition Integrated Industry Suite
  • 140 documentos
  • Llega en una carpeta de la Biblioteca

A full set of safety documents for demolition contractors, from task-level procedures to a management system for the whole business.

The pack has 15 SWMS covering demolition, soft demolition, acrow props, silica dust, night works and earthmoving equipment, and 13 SOPs including Excavator, Mobile Scaffolding and Jackhammer.

It also includes an integrated management system that meets ISO 45001, ISO 14001 and ISO 9001: over 110 plans, policies, forms, registers and checklists, including Quality Project Management Plan, AS/NZS ISO 45001:2018 Internal Audit Checklist and Health and Wellbeing Module.

The documents arrive together in one folder of your Library, and you get every update to each of them.

Vista previa de SWMS Site Establishment

Site Establishment

SWMSVersion 3
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site Management Plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile Plant
  • Gas Mains
  • Hazardous Lines
  • Energised Electrical
  • Falls

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. Specify?

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

  • Act, Regulations, Codes of Practice References:

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Head Protection
  • Protective Clothing
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Contact with underground & overhead utility assets, e.g. electricity, gas, water

      Before controls4 Acute
      Controls
      • Refer to your State/Territory Guidance Material for working distances, i.e., No Go Zones.

      • If a permit to work obtained, always work within the terms of the permit. (have a copy of the permit on-site)

      • Assume overhead, and underground electrical lines energised unless the following is sighted:

        • An access authority confirming the electrical lines have been de-energised, or

        • A written document from the utility owner permitting work in the no-go zone.

      • Property is correctly identified, i.e., lot/plan numbers correspond, and boundaries located and clearly marked

      • Work planned to minimise impacts on neighbouring properties

      After controls2 Moderate
      Responsible
      • Supervisorto undertake all planning processes

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

10 pasos más del trabajo, de Check weather conditions & prepare a Emergency response

Cada uno con sus peligros, niveles de riesgo y controles, además de las firmas de tu equipo.

Ver como

Cómo se ve en un navegador

Consigue este sistema

Regístrate gratis y luego elige cómo lo quieres. Cada documento va a tu Biblioteca, en una carpeta con el nombre del paquete.

  • Incluido en los planes de pago

    Usa créditos de plantilla de tu plan. Esta cuesta 20.

    Comparar planes y precios
  • Cómprala una sola vez

    $999.90 pago único, y es tuya para siempre. También sirve con el plan Gratis.

No necesitas tarjeta para registrarte. Los miembros con acceso anticipado tienen un 30% de descuento en cualquier plan.

Qué incluye

  1. Site Establishment

    SWMS · 11 pasos del trabajo

    Site Establishment SWMS: 11 job steps from planning and traffic management to tools, site set-up, working at height and emergency response.

    También se vende por separado
  2. Construction Night Works

    SWMS · 4 pasos del trabajo

    SWMS for general construction work at night: planning, work area set-up, night works and emergency response, with lighting, plant and fatigue controls.

    También se vende por separado
  3. Manual Handling

    SWMS · 18 pasos del trabajo

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    También se vende por separado
  4. Tipper and Dog

    SWMS · 16 pasos del trabajo

    Hazards and controls for operating a tip truck and dog trailer, including side tippers, from coupling trailers to tipping, refuelling and emergency response.

    También se vende por separado
  5. Integrated HSEQ Demolition Management Plan

    Plan de gestión · 1 pasos del trabajo

    An integrated HSEQ plan for demolition work: policy, contractor duties, site, safety, environment and quality procedures, with forms and registers.

    También se vende por separado
  6. Earthmoving Equipment

    SWMS · 23 pasos del trabajo

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    También se vende por separado
  7. Silica Dust

    SWMS · 14 pasos del trabajo

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    También se vende por separado
  8. Welding

    SWMS · 10 pasos del trabajo

    Welding SWMS: 10 job steps covering fire and explosion, gas cylinders, fumes, electrical equipment, burns, heat stress, angle grinders and emergencies.

    También se vende por separado
  9. Spotter

    SWMS · 11 pasos del trabajo

    SWMS for spotters and safety observers: traffic and mobile plant, work near overhead and underground assets, scaffolding and EWPs, roll-over and first aid.

    También se vende por separado
  10. Mobile Plant Working Near-Around

    SWMS · 8 pasos del trabajo

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    También se vende por separado
  11. Height Access Equipment

    SWMS · 17 pasos del trabajo

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    También se vende por separado
  12. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 pasos del trabajo

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    También se vende por separado
  13. Plant Risk Assessment Form

    Formulario · 25 campos

    Identify the hazards of an item of plant, score the risk with a risk matrix, and tick the control measures in place, with reviews and approval.

    También se vende por separado
  14. Acrow Props

    SWMS · 13 pasos del trabajo

    SWMS for Acrow props used to support overhead loads: design, set-up, pre-inspection, installation, monitoring, removal and emergencies.

    También se vende por separado
  15. Powered Non-powered Tools

    SWMS · 12 pasos del trabajo

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    También se vende por separado
  16. Soft Demolition

    SWMS · 20 pasos del trabajo

    SWMS for soft demolition and strip-out: asbestos, silica dust, glass removal, working at height, tools, waste and emergency response.

    También se vende por separado
  17. Demolition

    SWMS · 9 pasos del trabajo

    SWMS for demolition: planning, disconnecting services, site systems, environment, mechanical and manual demolition, monitoring and emergencies.

    También se vende por separado
  18. Quality Project Management Plan

    Plan de gestión · 16 secciones

    A Quality Project Management Plan covering scope, responsibilities, audits, non-conformances, inspection and testing, and change management, with forms and registers.

    También se vende por separado
  19. Health and Wellbeing Module

    Política · 6 secciones

    A health and wellbeing policy module covering fitness for work, psychosocial hazards, violence, harassment, drugs and alcohol, and fatigue.

    También se vende por separado
  20. PPE Register

    Formulario · 6 campos

    A register of the PPE issued to each worker, such as gloves, safety glasses and hi-vis vests, with issue and replacement dates and worker and manager signatures.

    También se vende por separado
  21. Construction Site Inspection Monthly Checklist

    Formulario · 1 campos

    A monthly construction site inspection checklist: fifteen safety checks marked Pass or Fail by month, with a responsible person to initial.

    También se vende por separado
  22. Lock Out Tag Out - LOTO

    SOP · 9 secciones

    Lock out tag out (LOTO) procedure: isolate every energy source before maintenance, restore equipment to service, and assess the risks of the work.

    También se vende por separado
  23. AS/NZS ISO 45001:2018 Internal Audit Checklist

    Formulario · 16 campos

    A question-format checklist for auditing your OHS management system against the requirements of AS/NZS ISO 45001:2018.

    También se vende por separado
  24. Plant Hazard Checklist - Powered Mobile Plant

    Formulario · 7 campos

    A checklist to complete before operating powered mobile plant, covering condition, guarding, restraints, tyres, lights and attachments.

    También se vende por separado
  25. Quality Design Plan

    Plan de gestión · 12 secciones

    A Quality Design Plan to manage the design process and control design output: roles, milestones, communication, verification and approval.

    También se vende por separado
  26. Electrical Safety Audit Checklist - Construction Sites

    Formulario · 13 campos

    Checklist for identifying and controlling electrical hazards on construction sites, from overhead lines to site power supply.

    También se vende por separado
  27. Competency Guide

    Política · 10 temas

    A training competency grid showing which training each site position needs, with a key, a worked example and a blank grid to fill in.

    También se vende por separado
  28. Demo Hazardous Works Module

    Política · 13 secciones

    A construction hazardous works module covering plant, noise, falls, manual tasks, remote work, electrical safety and excavation, with checklists and registers.

    También se vende por separado
  29. Risk Assessment Form

    Formulario · 8 campos

    Risk assessment form for the health and safety risks of an item or service before you buy it, with a risk matrix, the hierarchy of control and worked examples.

    Solo en este sistema
  30. Roles and Responsibilities Schedule

    Formulario · 1 campos

    A schedule for one role: its title, responsibilities, who it reports to, its escalation path and the authority it holds.

    También se vende por separado
  31. Demolition IMS Manual

    Plan de gestión · 12 secciones

    An integrated management system manual for demolition businesses covering health and safety, environment and quality, to ISO 45001, 14001 and 9001.

    También se vende por separado
  32. Contractor Permit to Work

    Formulario · 13 campos

    A permit to work that records a contractor's details, high-risk work, SWMS, permits and insurance, with contractor and on-site manager sign-offs.

    También se vende por separado
  33. Return to Work Plan

    Plan de gestión · 7 secciones

    A return to work plan for an injured worker: their details, the RTW goal, work restrictions, suitable duties, appointments and who agreed to it.

    Solo en este sistema
  34. Products Processes – Identification and Material Traceability

    Formulario · 5 campos

    A register of products and processes with their identifier, name and location, for material identification and traceability.

    También se vende por separado
  35. Environmental Incident and Corrective Action Report Form

    Formulario · 23 campos

    A form to report an environmental incident, record the investigation and corrective actions, and sign off that they are complete.

    También se vende por separado
  36. Disaster Recovery Plan

    Plan de gestión · 9 secciones

    A Disaster Recovery Plan to prepare for disasters and accidents, with policy, procedure, responsibilities, a plan template and supporting forms.

    También se vende por separado
  37. Meeting and Toolbox Talk Record

    Formulario · 8 campos

    A toolbox talk and safety meeting record: attendees and signatures, the agenda, safety topics discussed, comments and the actions that follow.

    También se vende por separado
  38. Corrective and Preventative Actions Form

    Formulario · 9 campos

    Record a corrective or preventative action: the issue and its seriousness, the evaluation, the action, who is responsible and the manager's sign-off.

    También se vende por separado
  39. Emergency Response Plan

    Plan de gestión · 25 secciones

    An Emergency Response Plan so workers know what to do in an emergency: evacuation, fire, first aid, spills, threats and bomb threats, with registers and checklists.

    También se vende por separado
  40. Annual Audit Schedule

    Formulario · 1 campos

    A month-by-month schedule for planning safety, environmental or quality audits across the year, with a legend for planned and postponed audits.

    También se vende por separado
  41. Monitoring Register

    Formulario · 7 campos

    A register of the system items that need monitoring: responsibility, legislation, frequency, record retention period and comments.

    También se vende por separado
  42. AS/NZS ISO 14001:2016 Internal Audit Checklist

    Formulario · 29 campos

    An internal audit checklist for assessing your environmental management system against the requirements of AS/NZS ISO 14001:2016.

    También se vende por separado
  43. Monitoring and Measurement Schedule

    Formulario · 3 campos

    A register of what is monitored and measured: the location, the responsible person or position, and the date or time of each check.

    También se vende por separado
  44. Environmental Site Assessment Checklist

    Formulario · 3 campos

    An environmental checklist for construction sites covering air, chemicals, fauna, heritage, noise, erosion, waste, acid sulphate soils and emergencies.

    También se vende por separado
  45. Incident Register

    Formulario · 10 campos

    A register to record workplace incidents and near misses: when and where, what happened, who was involved, severity, status and the corrective actions taken.

    También se vende por separado
  46. Interested Parties Register

    Formulario · 5 campos

    A register of interested parties: who they are, what they need and expect, your objectives for each and their priority.

    También se vende por separado
  47. Infrastructure Responsibilities Register

    Formulario · 2 campos

    Register that lists the departments and people responsible for infrastructure use and maintenance, and the infrastructure each looks after.

    También se vende por separado
  48. Worker Training and Induction Register

    Formulario · 10 campos

    A register of the training and competencies each worker has completed, their licences and expiry dates, and whether they have been correctly inducted.

    También se vende por separado
  49. Emergency Drill Report

    Formulario · 4 secciones

    A form for reporting the outcome of an emergency drill: participants, simulation, problems found and corrective action.

    También se vende por separado
  50. Quarterly Objective and Targets Report

    Formulario · 7 campos

    A quarterly register for reporting results against your key objectives and targets at the end of March, June, September and December.

    También se vende por separado
  51. Test Protocols

    Formulario · 4 campos

    A register of test protocols: each protocol's number and name, its date of issue and the date it is due for review.

    También se vende por separado
  52. Emergency Response Register

    Formulario · 6 campos

    A register of a site's emergency response procedures: whether each is in place, its document, version and responsible person.

    También se vende por separado
  53. Operations-Processes – Identification Form

    Formulario · 3 campos

    A register for listing the operations and processes an organisation carries out, with an identifier and the location of each.

    También se vende por separado
  54. Asbestos Management Plan

    Plan de gestión · 18 secciones

    A framework for managing asbestos-containing material in the workplace, covering the register, controls, permits, incidents and training.

    También se vende por separado
  55. Management Review Meeting Report IMS

    Formulario · 6 campos

    An integrated management system review meeting report: attendance, agenda, ten review items for quality, safety and environment, and follow-up.

    También se vende por separado
  56. Inspection Test Plan

    Plan de gestión · 2 secciones

    A blank inspection test plan to record activities, test methods, acceptance criteria, records and inspections, with approval and review sign-off.

    También se vende por separado
  57. Chemical & SDS Register

    Formulario · 13 campos

    Keep a list of the hazardous substances and dangerous goods at your workplace, with their GHS and DG classification, SDS date, quantities, placards and manifests.

    También se vende por separado
  58. Verification of Competency Record

    Formulario · 25 campos

    A form for recording a worker's verification of competency: worker, assessor and expert details, method, result and a checklist.

    También se vende por separado
  59. Safe Work Method Statement Checklist

    Formulario · 3 campos

    A checklist to test that a SWMS meets regulatory requirements: consultation, hazards and controls, storage, supervision and training.

    También se vende por separado
  60. Operational Control Register

    Formulario · 7 campos

    A register of the documented operational controls for your processes: whether each is in place, its procedure, version and responsible person.

    También se vende por separado
  61. Incident Report Form

    Formulario · 28 campos

    Record a workplace incident, injury, near miss or property damage: what happened, who was involved, notifying the regulator, and the investigation that follows.

    También se vende por separado
  62. Plant and Equipment Register

    Formulario · 13 campos

    Record the maintenance requirements and history of all plant and equipment, and whether each item needs a licence to operate or registration with the regulator.

    También se vende por separado
  63. HSEQ Procurement Implementation Guide

    Política · 6 secciones

    A guide to applying the integrated HSEQ procurement procedure: factors to weigh, tailoring, responsibilities and a seven-step process.

    También se vende por separado
  64. Training Needs Register

    Formulario · 8 campos

    Training needs register recording each role's responsibilities, required qualifications and competencies, training needs, dates and course details.

    También se vende por separado
  65. Asbestos Register

    Formulario · 17 campos

    An asbestos register for the workplace: who is responsible, whether asbestos is present, and each item's type, condition and location.

    También se vende por separado
  66. Induction Checklist

    Formulario · 6 campos

    An induction checklist that ensures essential safety topics are covered for new workers and visitors, from site rules and emergencies to PPE and SWMS.

    También se vende por separado
  67. Operational Control Development Worksheet

    Formulario · 11 campos

    A worksheet for assessing documented controls: which procedures are in place, which need updating and which new documents are required.

    También se vende por separado
  68. Corrective-Preventative Actions Register

    Formulario · 7 campos

    Register to record the corrective and preventative actions to be taken from raised issues, with due dates, status and completion.

    También se vende por separado
  69. Injuries/Illness Register

    Formulario · 10 campos

    Register to record workplace injuries and illnesses, with the incident type, category and corrective actions taken.

    También se vende por separado
  70. Workplace Inspection Checklist

    Formulario · 5 campos

    A checklist for safety officers to inspect the workplace, from emergency management and first aid to machinery, chemicals, electrical safety and housekeeping.

    También se vende por separado
  71. SOP Template

    Formulario · 9 campos

    A Standard/Safe Operating Procedure (SOP) template for writing step-by-step procedures specific to your business tasks.

    También se vende por separado
  72. Outsourced Process Register

    Formulario · 9 campos

    A register for assessing outsourced processes: customer requirements, your requirements, validation and verification for each outsource company.

    También se vende por separado
  73. First Aid Worker Register

    Formulario · 8 campos

    A register of your first aid officers: who manages the first aid kit, each officer's location and contact details, and their qualifications and expiry dates.

    También se vende por separado
  74. Contractor Register

    Formulario · 7 campos

    A register of all the contractors your business works with: company, contact name, trade or work, phone, address and email, kept current.

    También se vende por separado
  75. Compliance Evaluation Report

    Formulario · 11 campos

    A compliance evaluation report for checking legislation, codes of practice and standards across health and safety, environmental and quality.

    También se vende por separado
  76. Construction Site Inspection Daily Checklist

    Formulario · 1 campos

    A daily construction site inspection checklist where workers mark each hazard check Pass (P) or Fail (F) across a four-week grid.

    También se vende por separado
  77. Health Surveillance Record

    Formulario · 13 campos

    A register of each worker's occupational exposures, the health surveillance required, the examiner's recommendation and the follow up completed.

    También se vende por separado
  78. High Risk Licence Table & Checklist

    Formulario · 2 secciones

    A checklist and table of high-risk work licences and classes, to confirm which on-site activities need a licensed worker.

    También se vende por separado
  79. Organisation Chart

    Formulario · 5 secciones

    An organisation chart naming who holds each safety role, from the PCBU, owner or CEO through senior management and the health and safety team to workers.

    Solo en este sistema
  80. SWMS Template

    Formulario · 1 pasos del trabajo

    SWMS Template: ready to fill in, with your business's details on every copy. Part of the Health and Safety Manual.

    También se vende por separado
  81. Isolation Permit to Work

    Formulario · 13 campos

    A permit for the safe isolation of plant and equipment during maintenance, cleaning or repairs, with sign-offs and priority release.

    También se vende por separado
  82. Daily Sign-in Register

    Formulario · 9 campos

    The Daily Sign-in Register lets site managers know who is on site and that they have been briefed on health and safety concerns.

    También se vende por separado
  83. Training Skills Responsibilities Register

    Formulario · 8 campos

    A register of roles, responsibilities, required competencies and training needs, with training dates, course details and comments.

    También se vende por separado
  84. Objectives Summary Form

    Formulario · 7 campos

    A form for management to record an objective, its background, target and the resources required, with the responsible person's sign-off.

    También se vende por separado
  85. Supplier Evaluation Scorecard IMS

    Formulario · 11 campos

    Supplier scorecard to rate HSEQ management, performance, procurement and subcontractor criteria from 1 to 5 and record an approval decision.

    También se vende por separado
  86. Work Groups Register

    Formulario · 8 campos

    A register for keeping track of workplace work groups, their locations, members and health and safety representatives.

    También se vende por separado
  87. Document Register

    Formulario · 14 campos

    A register of the documents your organisation holds: numbers, versions, titles, purpose, author, key dates and approvals, for version control.

    También se vende por separado
  88. Risk Register

    Formulario · 8 campos

    A form to record identified hazards and risk levels in the workplace, with current controls and recommended actions for uncontrolled risks.

    También se vende por separado
  89. Objectives and Targets Register

    Formulario · 5 campos

    A register of key objectives and targets, each with its performance metric and the person or area responsible.

    También se vende por separado
  90. Contractor Pre-Qualification Checklist

    Formulario · 22 campos

    A structured framework to assess contractor suitability, from safety programs and insurance to training, incident reporting and hazard identification.

    También se vende por separado
  91. Verification of Requirements Checklist IMS

    Formulario · 18 campos

    A checklist to verify delivered goods or services meet HSEQ requirements: procurement details, a verification table, overall result and approvals.

    También se vende por separado
  92. Change Request Form

    Formulario · 16 campos

    A form to detail and record a request for a change to systems or processes, with the change manager's initial risk analysis.

    También se vende por separado
  93. Customer Complaints Form

    Formulario · 18 campos

    A form for recording customer complaints, with an internal section for action, follow-up, outcome and sign-off.

    También se vende por separado
  94. Plant Hazard Checklist - Non-Mobile Plant

    Formulario · 8 campos

    A Y/N/NA checklist for inspecting non-mobile plant and equipment for hazards, guarding and safety controls before use.

    También se vende por separado
  95. Worker Training Record

    Formulario · 10 campos

    A record of one worker's training in one course: who approved it, start and completion dates, description, expected outcomes and training type.

    También se vende por separado
  96. AS/NZS ISO 9001:2016 Internal Audit Checklist

    Formulario · 41 campos

    A checklist for self-assessing your quality management system against AS/NZS ISO 9001:2016, with audit guidance, scope, auditors and space for findings.

    También se vende por separado
  97. Environmental Control Plan

    Plan de gestión · 7 secciones

    An Environmental Control Plan covering policy, responsibilities, risk control, and air, chemicals, waste, energy and water management.

    También se vende por separado
  98. Excavation Safety Inspection Checklist

    Formulario · 22 campos

    A checklist for inspecting excavation and trenching work: soil, utilities, protective systems, access, atmosphere, water and emergency response.

    También se vende por separado
  99. Product Approval Checklist

    Formulario · 8 campos

    A checklist for approving a design for release: project details, component sign-off with Yes and No tick boxes, and an approval signature.

    También se vende por separado
  100. Internal Audit Plan

    Plan de gestión · 5 secciones

    An Internal Audit Plan to set the audit's subject, scope, objectives, team and criteria, so audits are conducted efficiently and effectively.

    También se vende por separado
  101. Roles, Responsibilities, Accountabilities and Authorities Register

    Formulario · 6 campos

    A register of position holders: role type, name, who they report to, delegated authority and tenure dates, for defining responsibility and accountability.

    También se vende por separado
  102. Supplier Questionnaire IMS

    Formulario · 4 campos

    A questionnaire for suppliers to describe their HSEQ management system, performance, policies and subcontractor controls.

    También se vende por separado
  103. Hazard Report Form

    Formulario · 14 campos

    Hazard report form for workers to record a hazard, its exact location, when it was found and the recommended action, before it causes an incident.

    También se vende por separado
  104. Worker Competency Register

    Formulario · 10 campos

    A register of worker competency assessments: position or tasks, assessor, method, licences held, outcome and actions taken.

    También se vende por separado
  105. Quality Incident and Corrective Action Report Form

    Formulario · 26 campos

    A quality incident and corrective action report: incident details, witnesses, investigation, root cause, preventative actions and sign-off.

    También se vende por separado
  106. Project Acceptance Criteria

    Formulario · 7 campos

    A project acceptance criteria form: the criteria each deliverable must meet before acceptance, and a milestones table with planned dates.

    También se vende por separado
  107. Communications Program Schedule

    Formulario · 5 campos

    Register of the communication protocols and timings with internal and external stakeholders, for workers, customers, regulators and contractors.

    También se vende por separado
  108. Internal Audit Report

    Formulario · 11 campos

    Helps auditors give management clear, objective and impartial information about what is going well and what needs to be improved.

    También se vende por separado
  109. Competency Mapping Register

    Formulario · 5 campos

    A register of the skills, knowledge, qualifications and experience each role or task requires, with worked examples.

    También se vende por separado
  110. Falls Prevention Checklist

    Formulario · 7 campos

    A checklist to inspect your workplace for fall hazards and address them before they cause injury.

    También se vende por separado
  111. Disaster Recovery Response Register

    Formulario · 8 campos

    A register of operations and activities, with whether an emergency recovery procedure is in place, its document, version and responsible person.

    También se vende por separado
  112. Working Alone Communication Log

    Formulario · 28 campos

    A communication log for workers working alone in remote or isolated areas: contacts, agreed call-in times, a call-in log and emergency actions.

    También se vende por separado
  113. Non-Conformance Report

    Formulario · 12 campos

    A report to document and address deviations from project specifications or quality standards, with corrective, preventative and monitoring actions.

    También se vende por separado
  114. Remote and Isolated Work Plan

    Plan de gestión · 7 secciones

    A plan for each remote or isolated trip: who goes and how to reach them, the risk assessment, high-risk work and items to take, call-in times and emergency actions.

    También se vende por separado
  115. Contractor Performance Assessment Checklist

    Formulario · 11 campos

    A checklist for scoring a contractor's safety performance, contract administration and work quality, with a recommendation.

    También se vende por separado
  116. Monitoring and Measuring Equipment Register

    Formulario · 5 campos

    A register of monitoring and measuring equipment: identifier, name, procedure, and the dates of the last and next calibration or service.

    También se vende por separado
  117. Construction Site Inspection Weekly Checklist

    Formulario · 3 campos

    A weekly checklist for supervisors to inspect a construction site and record Pass or Fail for each safety item.

    También se vende por separado
  118. Compliance Requirements Register

    Formulario · 3 campos

    A register of the regulatory and internal compliance requirements that apply to each process or function, with the legislation and a description.

    También se vende por separado
  119. Complaints Register

    Formulario · 11 campos

    A complaints register to log each complaint, the customer's details, the product affected, who is responsible and its status.

    También se vende por separado
  120. Measuring and Calibration Register

    Formulario · 5 campos

    A register of measuring and monitoring equipment with its procedure and the dates of last and next calibration or service.

    También se vende por separado
  121. Procurement Request Form IMS

    Formulario · 15 campos

    An internal request to buy goods or services, covering hazards, requirements, controls, supplier capability, risk level and sign-off.

    También se vende por separado
  122. Hand Tools

    SOP · 9 secciones

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    También se vende por separado
  123. Trestle Scaffold

    SOP · 7 secciones

    Safe operating procedure for trestle scaffolds: hazards, PPE, training, pre-operational inspection, step-by-step operation and a training register.

    También se vende por separado
  124. Handheld Power Tools

    SOP · 9 secciones

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    También se vende por separado
  125. Cherry Picker

    SOP · 10 secciones

    Safe operating procedure for a cherry picker: hazards, PPE, inspection, function tests, operation, emergency response and a hazard checklist.

    También se vende por separado
  126. Excavator

    SOP · 9 secciones

    Safe operating procedure for an excavator: hazards, PPE, licensing, clearances, maintenance, step-by-step operation and a hazard checklist.

    También se vende por separado
  127. Mobile Scaffolding

    SOP · 8 secciones

    Safe operating procedure for mobile scaffolding: hazards, PPE, inspection, erecting, moving and dismantling, and a working at height checklist.

    También se vende por separado
  128. Scissor Lift

    SOP · 10 secciones

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    También se vende por separado
  129. Jackhammer

    SOP · 9 secciones

    Safe operating procedure for a jackhammer: hazards, PPE, pre-operational inspection, precautions, operation, fuelling, maintenance and a hazard checklist.

    También se vende por separado
  130. Platform Ladder

    SOP · 7 secciones

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    También se vende por separado
  131. Demolition Saw - Fuel Operated

    SOP · 8 secciones

    Safe operating procedure for a fuel-operated demolition saw: hazards, PPE, precautions, inspection, operation, maintenance, fuelling and a hazard checklist.

    También se vende por separado
  132. Extension Ladder

    SOP · 7 secciones

    Extension ladder safe operating procedure: hazards, pre-use inspection, transporting, set-up, use and carrying, with a training register.

    También se vende por separado
  133. Manual Handling

    SOP · 5 secciones

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    También se vende por separado
  134. Psychosocial Hazards Management Plan

    Plan de gestión · 4 secciones

    A plan to manage and prevent psychosocial hazards at work, with policies, procedures, a risk assessment checklist and incident report forms.

    También se vende por separado
  135. Workplace Sexual and Gender-Based Harassment Prevention Plan

    Plan de gestión · 11 secciones

    A prevention plan for sexual and gender-based harassment, with a policy, risk assessment, complaint process, incident report form and checklist.

    También se vende por separado
  136. Workplace Fatigue Management Plan

    Plan de gestión · 6 secciones

    A workplace fatigue management plan with a policy, responsibilities, risk assessment, shift design guidelines and fatigue, driver and hours forms.

    También se vende por separado
  137. Workplace Violence Report Form

    Formulario · 22 campos

    A form to record a workplace violence incident: the people involved, a description, witnesses and follow-up such as a police report.

    También se vende por separado
  138. PH Incident Report Form

    Formulario · 22 campos

    An incident report form for recording a behaviour or incident, the people involved, witnesses and follow-up, with informal and formal complaint steps.

    También se vende por separado
  139. DV Workplace Safety Plan

    Plan de gestión · 2 secciones

    A plan to support a worker affected by domestic violence, with contact details, safety measures and a short risk assessment to fill in.

    También se vende por separado
  140. Psychosocial Risk Assessment Checklist

    Formulario · 25 secciones

    A psychosocial risk assessment checklist of 113 questions in 24 hazard groups, with a line for current controls and possible solutions under each question.

    Solo en este sistema

Qué cubre

Peligros que cubre

Legislación y normas que cita

Cada SWMS incluye nuestra lista de referencia de legislación y códigos de práctica.

Cómo encaja el sistema

Cada documento remite a los que necesita, desde el plan que fija las reglas hasta lo que hace el equipo el día del trabajo.

Formularios, registros y listas de control

Plant Risk Assessment Form25 camposTambién se vende por separadoPPE Register6 camposTambién se vende por separadoConstruction Site Inspection Monthly Checklist1 camposTambién se vende por separadoAS/NZS ISO 45001:2018 Internal Audit Checklist16 camposTambién se vende por separadoPlant Hazard Checklist - Powered Mobile Plant7 camposTambién se vende por separadoElectrical Safety Audit Checklist - Construction Sites13 camposTambién se vende por separadoRisk Assessment Form8 camposSolo en este sistemaRoles and Responsibilities Schedule1 camposTambién se vende por separadoContractor Permit to Work13 camposTambién se vende por separadoProducts Processes – Identification and Material Traceability5 camposTambién se vende por separadoEnvironmental Incident and Corrective Action Report Form23 camposTambién se vende por separadoMeeting and Toolbox Talk Record8 camposRemite a Hazard Report FormTambién se vende por separadoCorrective and Preventative Actions Form9 camposTambién se vende por separadoAnnual Audit Schedule1 camposTambién se vende por separadoMonitoring Register7 camposTambién se vende por separadoAS/NZS ISO 14001:2016 Internal Audit Checklist29 camposTambién se vende por separadoMonitoring and Measurement Schedule3 camposTambién se vende por separadoEnvironmental Site Assessment Checklist3 camposTambién se vende por separadoIncident Register10 camposTambién se vende por separadoInterested Parties Register5 camposTambién se vende por separadoInfrastructure Responsibilities Register2 camposTambién se vende por separadoWorker Training and Induction Register10 camposTambién se vende por separadoEmergency Drill Report4 seccionesTambién se vende por separadoQuarterly Objective and Targets Report7 camposTambién se vende por separadoTest Protocols4 camposTambién se vende por separadoEmergency Response Register6 camposTambién se vende por separadoOperations-Processes – Identification Form3 camposTambién se vende por separadoManagement Review Meeting Report IMS6 camposTambién se vende por separadoChemical & SDS Register13 camposTambién se vende por separadoVerification of Competency Record25 camposTambién se vende por separadoSafe Work Method Statement Checklist3 camposTambién se vende por separadoOperational Control Register7 camposTambién se vende por separadoIncident Report Form28 camposTambién se vende por separadoPlant and Equipment Register13 camposTambién se vende por separadoTraining Needs Register8 camposRemite a Organisation ChartTambién se vende por separadoAsbestos Register17 camposTambién se vende por separadoInduction Checklist6 camposTambién se vende por separadoOperational Control Development Worksheet11 camposTambién se vende por separadoCorrective-Preventative Actions Register7 camposTambién se vende por separadoInjuries/Illness Register10 camposTambién se vende por separadoWorkplace Inspection Checklist5 camposTambién se vende por separadoSOP Template9 camposTambién se vende por separadoOutsourced Process Register9 camposTambién se vende por separadoFirst Aid Worker Register8 camposTambién se vende por separadoContractor Register7 camposTambién se vende por separadoCompliance Evaluation Report11 camposTambién se vende por separadoConstruction Site Inspection Daily Checklist1 camposTambién se vende por separadoHealth Surveillance Record13 camposTambién se vende por separadoHigh Risk Licence Table & Checklist2 seccionesTambién se vende por separadoOrganisation Chart5 seccionesSolo en este sistemaSWMS Template1 pasos del trabajoTambién se vende por separadoIsolation Permit to Work13 camposTambién se vende por separadoDaily Sign-in Register9 camposTambién se vende por separadoTraining Skills Responsibilities Register8 camposTambién se vende por separadoObjectives Summary Form7 camposTambién se vende por separadoSupplier Evaluation Scorecard IMS11 camposTambién se vende por separadoWork Groups Register8 camposTambién se vende por separadoDocument Register14 camposTambién se vende por separadoRisk Register8 camposTambién se vende por separadoObjectives and Targets Register5 camposTambién se vende por separadoContractor Pre-Qualification Checklist22 camposTambién se vende por separadoVerification of Requirements Checklist IMS18 camposTambién se vende por separadoChange Request Form16 camposTambién se vende por separadoCustomer Complaints Form18 camposTambién se vende por separadoPlant Hazard Checklist - Non-Mobile Plant8 camposTambién se vende por separadoWorker Training Record10 camposTambién se vende por separadoAS/NZS ISO 9001:2016 Internal Audit Checklist41 camposTambién se vende por separadoExcavation Safety Inspection Checklist22 camposTambién se vende por separadoProduct Approval Checklist8 camposTambién se vende por separadoRoles, Responsibilities, Accountabilities and Authorities Register6 camposTambién se vende por separadoSupplier Questionnaire IMS4 camposTambién se vende por separadoHazard Report Form14 camposRemite a Incident Report FormTambién se vende por separadoWorker Competency Register10 camposTambién se vende por separadoQuality Incident and Corrective Action Report Form26 camposTambién se vende por separadoProject Acceptance Criteria7 camposTambién se vende por separadoCommunications Program Schedule5 camposTambién se vende por separadoInternal Audit Report11 camposTambién se vende por separadoCompetency Mapping Register5 camposTambién se vende por separadoFalls Prevention Checklist7 camposTambién se vende por separadoDisaster Recovery Response Register8 camposTambién se vende por separadoWorking Alone Communication Log28 camposTambién se vende por separadoNon-Conformance Report12 camposTambién se vende por separadoContractor Performance Assessment Checklist11 camposTambién se vende por separadoMonitoring and Measuring Equipment Register5 camposTambién se vende por separadoConstruction Site Inspection Weekly Checklist3 camposTambién se vende por separadoCompliance Requirements Register3 camposTambién se vende por separadoComplaints Register11 camposTambién se vende por separadoMeasuring and Calibration Register5 camposTambién se vende por separadoProcurement Request Form IMS15 camposTambién se vende por separadoWorkplace Violence Report Form22 camposTambién se vende por separadoPH Incident Report Form22 camposTambién se vende por separadoPsychosocial Risk Assessment Checklist25 seccionesSolo en este sistema

Opiniones

Todavía no hay opiniones.

Cómo funcionan las plantillas

Pruébalo antes de pagar.

  1. Vista previa gratis

    Los pasos del trabajo, los peligros y la primera tarea de cada plantilla se pueden leer. Sin registrarte.

  2. Prueba el editor

    Adapta un SWMS de demostración con tu empresa, tu trabajo y tu obra, en una computadora o en tu teléfono.

  3. Regístrate gratis

    Tus datos y tu logo se pasan. Esta plantilla se abre ya rellenada.

  4. Usa un crédito o compra una sola vez

    Los planes de pago incluyen créditos de plantilla cada mes. O compra esta para quedártela.