Oferta de acceso anticipado:Acceso anticipado: 30% de descuento, mientras sigas suscrito.

Aprovechar la oferta

Las plantillas están escritas en inglés.

Prueba el editor gratis
Paquete ahorro · 38 plantillas

Shop-fitting Integrated Industry Suite

Paquete ahorro · PACK-50394

Vista previa de la plantilla Paquete ahorro Shop-fitting Integrated Industry Suite
  • 38 plantillas
  • 38 por el precio de 27
  • Llega en una carpeta de la Biblioteca

A set of 15 SWMS, 22 SOPs and one plan for shop-fitters and fit-out contractors.

The SWMS cover site establishment, partitioning, plasterboard, suspended ceilings, glazing and soft demolition. The SOPs include Table Saw, Reciprocating Saw and Handheld Circular Saw. It also includes Construction HSEQ Site Management Plan.

Each document is the same one sold on its own, so you get every update to it. Together they cost 27 template credits instead of 38.

Vista previa de Construction HSEQ Site Management Plan

Construction HSEQ Site Management Plan

Plan de gestiónVersion 5

HSEQ Site Management Plan

by Company

Insert project name here

Introduction

This Health, Safety, Environmental and Quality (HSEQ) Site Management Plan (SMP) will assist Organisations in meeting HSEQ obligations. In conjunction with the applicable recording forms, this plan provides onsite processes and procedures for the management of HSEQ aspects for site works.

This SMP will be available for inspection by all relevant persons, including visitors, direct workers, contractors, workers of contractors, and government-appointed inspectors. The SMP is monitored and updated as required, and the most current copy kept on-site for the duration of the project.

The SMP will include essential information for persons on-site to ensure health and safety as far as is reasonable and protection of the environment. This information includes roles and responsibilities of key personnel, Health and Safety Representatives (HSR) and participation arrangements, guides for resolving issues, site rules, and processes in place for hazard identification, risk assessment and controls, managing incidents, emergency response and review/monitoring procedures. The SMP includes essential information for tasks that are "High Risk" including the development of Safe Work Method Statements (SWMS) and how these will be collected, assessed monitored and reviewed.

Management commitment and approval

40 secciones más

  1. Contractor responsibilities
  2. Project details
  3. Occupational health and safety
  4. Environment
  5. Quality
  6. y 35 más

Escritas completas, listas para los datos de tu negocio.

Ver como

Cómo se ve en un navegador

Consigue este paquete ahorro

Regístrate gratis y luego elige cómo lo quieres. Cada documento va a tu Biblioteca, en una carpeta con el nombre del paquete.

  • Incluido en los planes de pago

    Usa créditos de plantilla de tu plan. Este paquete cuesta 27 en vez de 38.

    Comparar planes y precios
  • Cómprala una sola vez

    $2,428.65 $3,418.10 pago único, y es tuya para siempre. También sirve con el plan Gratis.

No necesitas tarjeta para registrarte. Los miembros con acceso anticipado tienen un 30% de descuento en cualquier plan.

Qué incluye

  1. Construction HSEQ Site Management Plan

    Plan de gestión · 41 secciones

    A construction site management plan covering health and safety, environment and quality, with registers, checklists and forms.

    También se vende por separado
  2. Height Access Equipment

    SWMS · 17 pasos del trabajo

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    También se vende por separado
  3. Internal External Lock-Up Fix Stage Carpentry

    SWMS · 15 pasos del trabajo

    Covers internal and external lock-up and fix stage carpentry, with the risks and controls for each job step from site arrival to emergency response.

    También se vende por separado
  4. Battery Charging and Handling

    SOP · 7 secciones

    Safe operating procedure for charging and handling batteries: hazards, emergency response to acid splashes, PPE, precautions, recharging area and battery movement.

    También se vende por separado
  5. Painting and Decorating

    SWMS · 15 pasos del trabajo

    SWMS for painting and decorating work: transport, site set-up, ladders and scaffolds, surface preparation, mixing, spraying and emergencies.

    También se vende por separado
  6. Glazing

    SWMS · 15 pasos del trabajo

    A glazing SWMS covering cutting, drilling, grinding and installing glass balustrades, windows, doors, shower screens and mirrors.

    También se vende por separado
  7. Table Saw

    SOP · 9 secciones

    Safe operating procedure for a table saw: hazards, PPE, precautions, pre-operational inspection, operation, kickback prevention and a hazard checklist.

    También se vende por separado
  8. Soft Demolition

    SWMS · 20 pasos del trabajo

    SWMS for soft demolition and strip-out: asbestos, silica dust, glass removal, working at height, tools, waste and emergency response.

    También se vende por separado
  9. Reciprocating Saw

    SOP · 9 secciones

    Safe operating procedure for a reciprocating saw: hazards, PPE, training, pre-operational inspection, maintenance, operation, first aid and a hazard checklist.

    También se vende por separado
  10. Trestle Scaffold

    SOP · 7 secciones

    Safe operating procedure for trestle scaffolds: hazards, PPE, training, pre-operational inspection, step-by-step operation and a training register.

    También se vende por separado
  11. Plasterboard

    SWMS · 16 pasos del trabajo

    Plasterboard SWMS for fixing and setting sheets to walls and ceilings, with cornice: 16 job steps from silica dust training to cutting, sanding and stilts.

    También se vende por separado
  12. Electric Air Compressor

    SOP · 9 secciones

    Safe operating procedure for an electric air compressor: hazards, PPE, inspection, operation, cleaning and a hazard checklist.

    También se vende por separado
  13. Manual Handling

    SOP · 5 secciones

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    También se vende por separado
  14. Site Establishment Shop Fit-out

    SWMS · 10 pasos del trabajo

    Site Establishment Shop Fit-out SWMS: 10 job steps from planning and arrival to powered tools, completion and emergency response.

    También se vende por separado
  15. Handheld Circular Saw

    SOP · 8 secciones

    Safe operating procedure for a handheld circular saw: hazards, PPE, precautions, inspection, operation, kickback and a hazard checklist.

    También se vende por separado
  16. Nail Gun - Battery Operated -

    SOP · 8 secciones

    Safe operating procedure for a battery-operated nail gun: hazards, PPE, battery charging, operation, jammed nails and a training register.

    También se vende por separado
  17. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 pasos del trabajo

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    También se vende por separado
  18. Silica Dust

    SWMS · 14 pasos del trabajo

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    También se vende por separado
  19. Platform Ladder

    SOP · 7 secciones

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    También se vende por separado
  20. Docking Saw

    SOP · 10 secciones

    Safe operating procedure for a docking saw: hazards, PPE, pre-operational inspection, maintenance, step-by-step operation and a hazard checklist.

    También se vende por separado
  21. V Cut Mitre Saw

    SOP · 10 secciones

    Safe operating procedure for a V cut mitre saw: hazards, PPE, training, inspection, blade replacement, operation, maintenance and a hazard checklist.

    También se vende por separado
  22. Angle Grinder

    SOP · 9 secciones

    Safe operating procedure for an angle grinder: hazards, PPE, inspection, precautions, operation, changing discs, maintenance and a hazard checklist.

    También se vende por separado
  23. Pneumatic Tools

    SOP · 8 secciones

    Safe operating procedure for pneumatic tools: hazards, PPE, precautions, maintenance, pre-operational inspection, operation and a hazard checklist.

    También se vende por separado
  24. Jigsaw

    SOP · 9 secciones

    Safe operating procedure for a jigsaw: hazards, PPE, training, pre-operational inspection, operation, blade replacement, maintenance and a hazard checklist.

    También se vende por separado
  25. Mitre/Drop Saw

    SOP · 8 secciones

    Safe operating procedure for a mitre or drop saw: hazards, PPE, precautions, inspection, maintenance, operation, blade replacement and a hazard checklist.

    También se vende por separado
  26. Hand Tools

    SOP · 9 secciones

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    También se vende por separado
  27. Handheld Router

    SOP · 9 secciones

    Safe operating procedure for a handheld router: hazards, PPE, training, inspection, maintenance, operating steps and a hazard checklist.

    También se vende por separado
  28. Cabinet Installation

    SWMS · 12 pasos del trabajo

    SWMS for cabinet making and installation: client consultation, site set-up, tools, hazardous substances, dust control, ladders, cuts and emergencies.

    También se vende por separado
  29. Suspended Grid System Ceiling Installation

    SWMS · 12 pasos del trabajo

    Suspended grid system ceiling installation SWMS: 12 job steps covering ladders and trestles, silica dust, falling objects, mobile plant and emergencies.

    También se vende por separado
  30. Powered Non-powered Tools

    SWMS · 12 pasos del trabajo

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    También se vende por separado
  31. Scissor Lift

    SOP · 10 secciones

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    También se vende por separado
  32. Manual Handling

    SWMS · 18 pasos del trabajo

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    También se vende por separado
  33. Tiling

    SWMS · 14 pasos del trabajo

    Tiling SWMS: 14 job steps covering silica dust, weather, delivery, ladders and scaffold, tile cutting, completion and emergencies.

    También se vende por separado
  34. Partitioning Steel-Stud-Track

    SWMS · 12 pasos del trabajo

    Covers installing steel, stud and track partitioning in commercial premises, with the risks and controls for each job step from silica training to emergency response.

    También se vende por separado
  35. Nail Gun - Pneumatic -

    SOP · 8 secciones

    Safe operating procedure for a pneumatic nail gun: hazards, PPE, training, inspection, maintenance, operation, jammed nails and a hazard checklist.

    También se vende por separado
  36. Working with Guarded Machinery

    SOP · 12 secciones

    Safe operating procedure for working with or near guarded machinery: hazards, PPE, maintenance and LOTO, cleaning, reporting and a hazard checklist.

    También se vende por separado
  37. Mobile Scaffolding

    SOP · 8 secciones

    Safe operating procedure for mobile scaffolding: hazards, PPE, inspection, erecting, moving and dismantling, and a working at height checklist.

    También se vende por separado
  38. Handheld Drill

    SOP · 9 secciones

    Safe operating procedure for a handheld drill: hazards, PPE, precautions, pre-operational inspection, operation, maintenance and a hazard checklist.

    También se vende por separado

Qué cubre

Peligros que cubre

Legislación y normas que cita

Cada SWMS incluye nuestra lista de referencia de legislación y códigos de práctica.

Lo que ahorras

PlantillaPasos del trabajoPor separado
Construction HSEQ Site Management Plan0$89.95 · 1 crédito
Height Access Equipment17$89.95 · 1 crédito
Internal External Lock-Up Fix Stage Carpentry15$89.95 · 1 crédito
Battery Charging and Handling0$89.95 · 1 crédito
Painting and Decorating15$89.95 · 1 crédito
Glazing15$89.95 · 1 crédito
Table Saw0$89.95 · 1 crédito
Soft Demolition20$89.95 · 1 crédito
Reciprocating Saw0$89.95 · 1 crédito
Trestle Scaffold0$89.95 · 1 crédito
Plasterboard16$89.95 · 1 crédito
Electric Air Compressor0$89.95 · 1 crédito
Manual Handling0$89.95 · 1 crédito
Site Establishment Shop Fit-out10$89.95 · 1 crédito
Handheld Circular Saw0$89.95 · 1 crédito
Nail Gun - Battery Operated -0$89.95 · 1 crédito
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 crédito
Silica Dust14$89.95 · 1 crédito
Platform Ladder0$89.95 · 1 crédito
Docking Saw0$89.95 · 1 crédito
V Cut Mitre Saw0$89.95 · 1 crédito
Angle Grinder0$89.95 · 1 crédito
Pneumatic Tools0$89.95 · 1 crédito
Jigsaw0$89.95 · 1 crédito
Mitre/Drop Saw0$89.95 · 1 crédito
Hand Tools0$89.95 · 1 crédito
Handheld Router0$89.95 · 1 crédito
Cabinet Installation12$89.95 · 1 crédito
Suspended Grid System Ceiling Installation12$89.95 · 1 crédito
Powered Non-powered Tools12$89.95 · 1 crédito
Scissor Lift0$89.95 · 1 crédito
Manual Handling18$89.95 · 1 crédito
Tiling14$89.95 · 1 crédito
Partitioning Steel-Stud-Track12$89.95 · 1 crédito
Nail Gun - Pneumatic -0$89.95 · 1 crédito
Working with Guarded Machinery0$89.95 · 1 crédito
Mobile Scaffolding0$89.95 · 1 crédito
Handheld Drill0$89.95 · 1 crédito
Comprando uno por uno$3,418.10 · 38 créditos
En este paquete$2,428.65 · 27 créditos Ahorras $989.45

Opiniones

Todavía no hay opiniones.

Cómo funcionan las plantillas

Pruébalo antes de pagar.

  1. Vista previa gratis

    Los pasos del trabajo, los peligros y la primera tarea de cada plantilla se pueden leer. Sin registrarte.

  2. Prueba el editor

    Adapta un SWMS de demostración con tu empresa, tu trabajo y tu obra, en una computadora o en tu teléfono.

  3. Regístrate gratis

    Tus datos y tu logo se pasan. Esta plantilla se abre ya rellenada.

  4. Usa un crédito o compra una sola vez

    Los planes de pago incluyen créditos de plantilla cada mes. O compra esta para quedártela.