Materials Duct Lifter

SWMS · SWMS-10440

  • काम के 6 चरण
  • संस्करण 3

This SWMS covers the safety steps, general hazards and controls for using a materials lifter on site. It runs from arrival and assessing site conditions through work area set-up, pre-inspection of the lifter, operation, completion and emergency response.

It includes controls for contact with electricity, unit rollover, crush injuries, falling objects, burns and manual tasks, with the responsible people shown for each hazard.

It suits businesses and workers who operate materials duct lifters, including construction teams, warehouse staff and logistics personnel.

इसका अपना पेज देखें

Materials Duct Lifter SWMS का प्रीव्यू

Materials Duct Lifter

SWMSVersion 3

Document details

Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Gas Mains
  • Hazardous Lines
  • Energised Electrical

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e. no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Hand Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures of unanticipated hazards.

      After controls2 Moderate
      Responsible
      • Supervisorto check the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

काम के 5 और चरण, Work area set-up से Emergency response तक

हर एक में उसके ख़तरे, जोखिम रेटिंग और नियंत्रण, और साथ में आपके क्रू का साइन-ऑन।

ऐसे प्रीव्यू करें

ब्राउज़र में यह कैसा दिखता है

यह सिस्टम पाएँ

मुफ़्त में साइन अप करें, फिर चुनें कि आप इसे कैसे लेना चाहते हैं। हर दस्तावेज़ आपकी लाइब्रेरी में, पैक के नाम वाले फ़ोल्डर में जाता है।

  • पेड प्लान में शामिल

    अपने प्लान के टेम्पलेट क्रेडिट इस्तेमाल करें। इसकी कीमत 20 है।

    प्लान और कीमतों की तुलना करें
  • एक बार ख़रीदें

    $999.90 एक बार का भुगतान, और यह हमेशा आपका रहेगा। मुफ़्त प्लान पर भी चलता है।

साइन अप के लिए कार्ड नहीं चाहिए। अर्ली एक्सेस सदस्यों को किसी भी प्लान पर 30% की छूट मिलती है।

इसमें क्या-क्या है

काम के 6 चरण

  1. Arrival on-site & assess onsite conditionsCheck the site conditions, signage and induction on arrival
  2. Work area set-upSet up the work area clear of power lines and on stable ground
  3. Pre-inspect the lifterPre-inspect the lifter before use
  4. Materials lifter operationOperate the lifter within its limits, hoisting and placing loads
  5. On completionSecure the site and park the machine when work is complete
  6. Emergency responseFollow site emergency and evacuation procedures

इसमें शामिल ख़तरे

टेम्पलेट कैसे काम करते हैं

आज़माएँ, पैसे देने से पहले।

  1. मुफ़्त प्रीव्यू

    हर टेम्पलेट के काम के चरण, ख़तरे और पहला काम पढ़ने के लिए खुले हैं। साइन अप की ज़रूरत नहीं।

  2. एडिटर आज़माएँ

    कंप्यूटर या अपने फ़ोन पर, एक डेमो SWMS को अपनी कंपनी, जॉब और साइट के हिसाब से ढालें।

  3. मुफ़्त में साइन अप करें

    आपकी जानकारी और लोगो साथ आ जाते हैं। यह टेम्पलेट पहले से भरा हुआ खुलता है।

  4. क्रेडिट इस्तेमाल करें या एक बार ख़रीदें

    पेड प्लान में हर महीने टेम्पलेट क्रेडिट मिलते हैं। या यह टेम्पलेट हमेशा के लिए ख़रीद लें।