अर्ली एक्सेस ऑफ़र:अर्ली एक्सेस: 30% की छूट, जब तक आपकी सदस्यता चलती रहे.

ऑफ़र लें

टेम्पलेट दस्तावेज़ अंग्रेज़ी में लिखे गए हैं।

सिस्टम · 121 दस्तावेज़

Electrician-HVAC-Solar OHS-WHS Industry Suite

सिस्टम · SYS-50454

Electrician-HVAC-Solar OHS-WHS Industry Suite सिस्टम टेम्पलेट का पूर्वावलोकन
  • 121 दस्तावेज़
  • लाइब्रेरी के एक फ़ोल्डर में आता है

A full set of safety documents for electrical, HVAC and solar contractors, from task-level procedures to a management system for the whole business.

The pack has 28 SWMS covering switchboards, cable ladder, tray and conduit, solar installation, refrigeration, mechanical ventilation and telecommunications towers, and ten SOPs including Oxy-Acetylene Welding, Refrigerant Gases and Lock Out Tag Out - LOTO.

It also includes an OHS management system that meets ISO 45001: over 80 plans, policies, forms, registers and checklists, including Trades OHS Manual, Emergency Response Plan and Return to Work Plan.

The documents arrive together in one folder of your Library, and you get every update to each of them.

PPE Register का प्रीव्यू

PPE Register

फ़ॉर्मVersion 3

इसका मार्गदर्शन और उदाहरण वाली एंट्री लॉक हैं

आप देख सकते हैं कि फ़ॉर्म कैसे बना है। इसे लें और किसी भी डिवाइस पर भरें, प्रिंट करें, या अपने हिसाब से बदलें।

ऐसे प्रीव्यू करें

ब्राउज़र में यह कैसा दिखता है

यह सिस्टम पाएँ

मुफ़्त में साइन अप करें, फिर चुनें कि आप इसे कैसे लेना चाहते हैं। हर दस्तावेज़ आपकी लाइब्रेरी में, पैक के नाम वाले फ़ोल्डर में जाता है।

  • पेड प्लान में शामिल

    अपने प्लान के टेम्पलेट क्रेडिट इस्तेमाल करें। इसकी कीमत 20 है।

    प्लान और कीमतों की तुलना करें
  • एक बार ख़रीदें

    $999.90 एक बार का भुगतान, और यह हमेशा आपका रहेगा। मुफ़्त प्लान पर भी चलता है।

साइन अप के लिए कार्ड नहीं चाहिए। अर्ली एक्सेस सदस्यों को किसी भी प्लान पर 30% की छूट मिलती है।

क्या-क्या शामिल है

  1. PPE Register

    फ़ॉर्म · 6 फ़ील्ड

    A register of the PPE issued to each worker, such as gloves, safety glasses and hi-vis vests, with issue and replacement dates and worker and manager signatures.

    अलग से भी मिलता है
  2. Lock Out Tag Out - LOTO

    SOP · 9 सेक्शन

    Lock out tag out (LOTO) procedure: isolate every energy source before maintenance, restore equipment to service, and assess the risks of the work.

    अलग से भी मिलता है
  3. Trades OHS Manual

    मैनेजमेंट प्लान · 14 सेक्शन

    An OHS manual built on ISO 45001:2018: leadership, planning, support, operation, performance evaluation and improvement for trades businesses.

    अलग से भी मिलता है
  4. Roles and Responsibilities Schedule

    फ़ॉर्म · 1 फ़ील्ड

    A schedule for one role: its title, responsibilities, who it reports to, its escalation path and the authority it holds.

    अलग से भी मिलता है
  5. Return to Work Plan

    मैनेजमेंट प्लान · 7 सेक्शन

    A return to work plan for an injured worker: their details, the RTW goal, work restrictions, suitable duties, appointments and who agreed to it.

    सिर्फ़ इसी सिस्टम में
  6. Disaster Recovery Plan

    मैनेजमेंट प्लान · 9 सेक्शन

    A Disaster Recovery Plan to prepare for disasters and accidents, with policy, procedure, responsibilities, a plan template and supporting forms.

    अलग से भी मिलता है
  7. Meeting and Toolbox Talk Record

    फ़ॉर्म · 8 फ़ील्ड

    A toolbox talk and safety meeting record: attendees and signatures, the agenda, safety topics discussed, comments and the actions that follow.

    अलग से भी मिलता है
  8. Corrective and Preventative Actions Form

    फ़ॉर्म · 9 फ़ील्ड

    Record a corrective or preventative action: the issue and its seriousness, the evaluation, the action, who is responsible and the manager's sign-off.

    अलग से भी मिलता है
  9. Emergency Response Plan

    मैनेजमेंट प्लान · 25 सेक्शन

    An Emergency Response Plan so workers know what to do in an emergency: evacuation, fire, first aid, spills, threats and bomb threats, with registers and checklists.

    अलग से भी मिलता है
  10. Annual Audit Schedule

    फ़ॉर्म · 1 फ़ील्ड

    A month-by-month schedule for planning safety, environmental or quality audits across the year, with a legend for planned and postponed audits.

    अलग से भी मिलता है
  11. Monitoring Register

    फ़ॉर्म · 7 फ़ील्ड

    A register of the system items that need monitoring: responsibility, legislation, frequency, record retention period and comments.

    अलग से भी मिलता है
  12. OHS Procurement Implementation Guide

    नीति · 2 सेक्शन

    A guide to putting the OHS Procurement Procedure into practice: factors to weigh, tailoring by risk, and each step of the process.

    अलग से भी मिलता है
  13. Monitoring and Measurement Schedule

    फ़ॉर्म · 3 फ़ील्ड

    A register of what is monitored and measured: the location, the responsible person or position, and the date or time of each check.

    अलग से भी मिलता है
  14. Incident Register

    फ़ॉर्म · 10 फ़ील्ड

    A register to record workplace incidents and near misses: when and where, what happened, who was involved, severity, status and the corrective actions taken.

    अलग से भी मिलता है
  15. Interested Parties Register

    फ़ॉर्म · 5 फ़ील्ड

    A register of interested parties: who they are, what they need and expect, your objectives for each and their priority.

    अलग से भी मिलता है
  16. Infrastructure Responsibilities Register

    फ़ॉर्म · 2 फ़ील्ड

    Register that lists the departments and people responsible for infrastructure use and maintenance, and the infrastructure each looks after.

    अलग से भी मिलता है
  17. Worker Training and Induction Register

    फ़ॉर्म · 10 फ़ील्ड

    A register of the training and competencies each worker has completed, their licences and expiry dates, and whether they have been correctly inducted.

    अलग से भी मिलता है
  18. Emergency Drill Report

    फ़ॉर्म · 4 सेक्शन

    A form for reporting the outcome of an emergency drill: participants, simulation, problems found and corrective action.

    अलग से भी मिलता है
  19. AS/NZS ISO 45001:2018 Internal Audit Checklist

    फ़ॉर्म · 16 फ़ील्ड

    A question-format checklist for auditing your OHS management system against the requirements of AS/NZS ISO 45001:2018.

    अलग से भी मिलता है
  20. Workplace Fatigue Management Plan

    मैनेजमेंट प्लान · 6 सेक्शन

    A workplace fatigue management plan with a policy, responsibilities, risk assessment, shift design guidelines and fatigue, driver and hours forms.

    अलग से भी मिलता है
  21. Construction Hazardous Works Module

    नीति · 12 सेक्शन

    Seven hazardous works modules for construction projects, with hazard checklists, registers, rescue plans and an excavation inspection checklist.

    अलग से भी मिलता है
  22. Quarterly Objective and Targets Report

    फ़ॉर्म · 7 फ़ील्ड

    A quarterly register for reporting results against your key objectives and targets at the end of March, June, September and December.

    अलग से भी मिलता है
  23. Emergency Response Register

    फ़ॉर्म · 6 फ़ील्ड

    A register of a site's emergency response procedures: whether each is in place, its document, version and responsible person.

    अलग से भी मिलता है
  24. Operations-Processes – Identification Form

    फ़ॉर्म · 3 फ़ील्ड

    A register for listing the operations and processes an organisation carries out, with an identifier and the location of each.

    अलग से भी मिलता है
  25. Chemical & SDS Register

    फ़ॉर्म · 13 फ़ील्ड

    Keep a list of the hazardous substances and dangerous goods at your workplace, with their GHS and DG classification, SDS date, quantities, placards and manifests.

    अलग से भी मिलता है
  26. Verification of Competency Record

    फ़ॉर्म · 25 फ़ील्ड

    A form for recording a worker's verification of competency: worker, assessor and expert details, method, result and a checklist.

    अलग से भी मिलता है
  27. Operational Control Register

    फ़ॉर्म · 7 फ़ील्ड

    A register of the documented operational controls for your processes: whether each is in place, its procedure, version and responsible person.

    अलग से भी मिलता है
  28. Incident Report Form

    फ़ॉर्म · 28 फ़ील्ड

    Record a workplace incident, injury, near miss or property damage: what happened, who was involved, notifying the regulator, and the investigation that follows.

    अलग से भी मिलता है
  29. Plant and Equipment Register

    फ़ॉर्म · 13 फ़ील्ड

    Record the maintenance requirements and history of all plant and equipment, and whether each item needs a licence to operate or registration with the regulator.

    अलग से भी मिलता है
  30. Training Needs Register

    फ़ॉर्म · 8 फ़ील्ड

    Training needs register recording each role's responsibilities, required qualifications and competencies, training needs, dates and course details.

    अलग से भी मिलता है
  31. Asbestos Register

    फ़ॉर्म · 17 फ़ील्ड

    An asbestos register for the workplace: who is responsible, whether asbestos is present, and each item's type, condition and location.

    अलग से भी मिलता है
  32. OHS Procurement Request Form

    फ़ॉर्म · 17 फ़ील्ड

    A form to request a purchase of goods or services, recording the OHS hazards, supplier requirements, controls and risk level before sign-off.

    अलग से भी मिलता है
  33. Induction Checklist

    फ़ॉर्म · 6 फ़ील्ड

    An induction checklist that ensures essential safety topics are covered for new workers and visitors, from site rules and emergencies to PPE and SWMS.

    अलग से भी मिलता है
  34. Operational Control Development Worksheet

    फ़ॉर्म · 11 फ़ील्ड

    A worksheet for assessing documented controls: which procedures are in place, which need updating and which new documents are required.

    अलग से भी मिलता है
  35. Corrective-Preventative Actions Register

    फ़ॉर्म · 7 फ़ील्ड

    Register to record the corrective and preventative actions to be taken from raised issues, with due dates, status and completion.

    अलग से भी मिलता है
  36. OHS Supplier Questionnaire

    फ़ॉर्म · 32 फ़ील्ड

    Questionnaire for suppliers of goods or services: OHS management system, performance data, policies and procedures, subcontractors and a signed declaration.

    सिर्फ़ इसी सिस्टम में
  37. Injuries/Illness Register

    फ़ॉर्म · 10 फ़ील्ड

    Register to record workplace injuries and illnesses, with the incident type, category and corrective actions taken.

    अलग से भी मिलता है
  38. Verification of OHS Requirements Checklist

    फ़ॉर्म · 19 फ़ील्ड

    Checklist to verify that delivered goods or services meet the OHS requirements set in the purchase order, contract or specifications.

    अलग से भी मिलता है
  39. Workplace Inspection Checklist

    फ़ॉर्म · 5 फ़ील्ड

    A checklist for safety officers to inspect the workplace, from emergency management and first aid to machinery, chemicals, electrical safety and housekeeping.

    अलग से भी मिलता है
  40. SOP Template

    फ़ॉर्म · 9 फ़ील्ड

    A Standard/Safe Operating Procedure (SOP) template for writing step-by-step procedures specific to your business tasks.

    अलग से भी मिलता है
  41. Outsourced Process Register

    फ़ॉर्म · 9 फ़ील्ड

    A register for assessing outsourced processes: customer requirements, your requirements, validation and verification for each outsource company.

    अलग से भी मिलता है
  42. First Aid Worker Register

    फ़ॉर्म · 8 फ़ील्ड

    A register of your first aid officers: who manages the first aid kit, each officer's location and contact details, and their qualifications and expiry dates.

    अलग से भी मिलता है
  43. Compliance Evaluation Report

    फ़ॉर्म · 11 फ़ील्ड

    A compliance evaluation report for checking legislation, codes of practice and standards across health and safety, environmental and quality.

    अलग से भी मिलता है
  44. Health Surveillance Record

    फ़ॉर्म · 13 फ़ील्ड

    A register of each worker's occupational exposures, the health surveillance required, the examiner's recommendation and the follow up completed.

    अलग से भी मिलता है
  45. High Risk Licence Table & Checklist

    फ़ॉर्म · 2 सेक्शन

    A checklist and table of high-risk work licences and classes, to confirm which on-site activities need a licensed worker.

    अलग से भी मिलता है
  46. SWMS Template

    फ़ॉर्म · काम के 1 चरण

    SWMS Template: ready to fill in, with your business's details on every copy. Part of the Health and Safety Manual.

    अलग से भी मिलता है
  47. Management Review Meeting Report

    फ़ॉर्म · 7 फ़ील्ड

    A form to record a management review meeting: attendance, discussion, previous action items and new actions.

    अलग से भी मिलता है
  48. Isolation Permit to Work

    फ़ॉर्म · 13 फ़ील्ड

    A permit for the safe isolation of plant and equipment during maintenance, cleaning or repairs, with sign-offs and priority release.

    अलग से भी मिलता है
  49. Workplace Violence Report Form

    फ़ॉर्म · 22 फ़ील्ड

    A form to record a workplace violence incident: the people involved, a description, witnesses and follow-up such as a police report.

    अलग से भी मिलता है
  50. Objectives Summary Form

    फ़ॉर्म · 7 फ़ील्ड

    A form for management to record an objective, its background, target and the resources required, with the responsible person's sign-off.

    अलग से भी मिलता है
  51. Work Groups Register

    फ़ॉर्म · 8 फ़ील्ड

    A register for keeping track of workplace work groups, their locations, members and health and safety representatives.

    अलग से भी मिलता है
  52. Document Register

    फ़ॉर्म · 14 फ़ील्ड

    A register of the documents your organisation holds: numbers, versions, titles, purpose, author, key dates and approvals, for version control.

    अलग से भी मिलता है
  53. Risk Register

    फ़ॉर्म · 8 फ़ील्ड

    A form to record identified hazards and risk levels in the workplace, with current controls and recommended actions for uncontrolled risks.

    अलग से भी मिलता है
  54. OHS Supplier Evaluation Scorecard

    फ़ॉर्म · 10 फ़ील्ड

    A scorecard to rate a supplier's OHS management, performance, hazard controls and subcontractor management, with notes and an approval decision.

    अलग से भी मिलता है
  55. Risk Assessment Form

    फ़ॉर्म · 8 फ़ील्ड

    Risk assessment form for the health and safety risks of an item or service before you buy it, with a risk matrix, the hierarchy of control and worked examples.

    सिर्फ़ इसी सिस्टम में
  56. Objectives and Targets Register

    फ़ॉर्म · 5 फ़ील्ड

    A register of key objectives and targets, each with its performance metric and the person or area responsible.

    अलग से भी मिलता है
  57. Chemical Risk Assessment Form

    फ़ॉर्म · 28 फ़ील्ड

    A form to assess the risks of a hazardous chemical, rate them with a matrix and record the controls needed to protect workers.

    अलग से भी मिलता है
  58. Chemical Manifest

    फ़ॉर्म · 17 फ़ील्ड

    Chemical manifest to record the bulk and packaged hazardous chemicals on site, with a site plan, its legend and the emergency contacts.

    अलग से भी मिलता है
  59. Change Request Form

    फ़ॉर्म · 16 फ़ील्ड

    A form to detail and record a request for a change to systems or processes, with the change manager's initial risk analysis.

    अलग से भी मिलता है
  60. Worker Training Record

    फ़ॉर्म · 10 फ़ील्ड

    A record of one worker's training in one course: who approved it, start and completion dates, description, expected outcomes and training type.

    अलग से भी मिलता है
  61. Electrical Equipment Register

    फ़ॉर्म · 8 फ़ील्ड

    A register for the testing and tagging of plug-in electrical equipment in the workplace: test dates and types, results, the next test due and management sign-off.

    अलग से भी मिलता है
  62. Organisation Chart

    फ़ॉर्म · 5 सेक्शन

    An organisation chart naming who holds each safety role, from the PCBU, owner or CEO through senior management and the health and safety team to workers.

    सिर्फ़ इसी सिस्टम में
  63. Internal Audit Plan

    मैनेजमेंट प्लान · 5 सेक्शन

    An Internal Audit Plan to set the audit's subject, scope, objectives, team and criteria, so audits are conducted efficiently and effectively.

    अलग से भी मिलता है
  64. Roles, Responsibilities, Accountabilities and Authorities Register

    फ़ॉर्म · 6 फ़ील्ड

    A register of position holders: role type, name, who they report to, delegated authority and tenure dates, for defining responsibility and accountability.

    अलग से भी मिलता है
  65. Hazard Report Form

    फ़ॉर्म · 14 फ़ील्ड

    Hazard report form for workers to record a hazard, its exact location, when it was found and the recommended action, before it causes an incident.

    अलग से भी मिलता है
  66. Worker Competency Register

    फ़ॉर्म · 10 फ़ील्ड

    A register of worker competency assessments: position or tasks, assessor, method, licences held, outcome and actions taken.

    अलग से भी मिलता है
  67. Communications Program Schedule

    फ़ॉर्म · 5 फ़ील्ड

    Register of the communication protocols and timings with internal and external stakeholders, for workers, customers, regulators and contractors.

    अलग से भी मिलता है
  68. Internal Audit Report

    फ़ॉर्म · 11 फ़ील्ड

    Helps auditors give management clear, objective and impartial information about what is going well and what needs to be improved.

    अलग से भी मिलता है
  69. Competency Mapping Register

    फ़ॉर्म · 5 फ़ील्ड

    A register of the skills, knowledge, qualifications and experience each role or task requires, with worked examples.

    अलग से भी मिलता है
  70. Disaster Recovery Response Register

    फ़ॉर्म · 8 फ़ील्ड

    A register of operations and activities, with whether an emergency recovery procedure is in place, its document, version and responsible person.

    अलग से भी मिलता है
  71. Working Alone Communication Log

    फ़ॉर्म · 28 फ़ील्ड

    A communication log for workers working alone in remote or isolated areas: contacts, agreed call-in times, a call-in log and emergency actions.

    अलग से भी मिलता है
  72. Non-Conformance Report

    फ़ॉर्म · 12 फ़ील्ड

    A report to document and address deviations from project specifications or quality standards, with corrective, preventative and monitoring actions.

    अलग से भी मिलता है
  73. Audiometric Testing Record

    फ़ॉर्म · 9 फ़ील्ड

    A record of workers' hearing tests to help manage the risk of noise-induced hearing loss: test dates, results, further action and the next test.

    अलग से भी मिलता है
  74. Remote and Isolated Work Plan

    मैनेजमेंट प्लान · 7 सेक्शन

    A plan for each remote or isolated trip: who goes and how to reach them, the risk assessment, high-risk work and items to take, call-in times and emergency actions.

    अलग से भी मिलता है
  75. Monitoring and Measuring Equipment Register

    फ़ॉर्म · 5 फ़ील्ड

    A register of monitoring and measuring equipment: identifier, name, procedure, and the dates of the last and next calibration or service.

    अलग से भी मिलता है
  76. Compliance Requirements Register

    फ़ॉर्म · 3 फ़ील्ड

    A register of the regulatory and internal compliance requirements that apply to each process or function, with the legislation and a description.

    अलग से भी मिलता है
  77. Electrical Emergency Response Plan

    मैनेजमेंट प्लान · 16 सेक्शन

    Sets clear responsibilities and response steps for electrical emergencies, with contact, personnel, first aid, training and drill registers.

    अलग से भी मिलता है
  78. Solar Installation

    SWMS · काम के 17 चरण

    SWMS for installing solar panels on a roof: working at height, electrical isolation, batteries, hand and power tools, chemicals and emergencies.

    अलग से भी मिलता है
  79. Refrigeration

    SWMS · काम के 18 चरण

    SWMS for refrigeration work: cylinder handling, system evacuation, flushing and charging, working at height, testing and emergency response.

    अलग से भी मिलता है
  80. Air Conditioning Service and Repairs

    SWMS · काम के 14 चरण

    SWMS for air conditioning service and repairs: refrigerants, indoor and outdoor unit maintenance, energised electrical work, testing and emergencies.

    अलग से भी मिलता है
  81. Working in Roof Spaces

    SWMS · काम के 8 चरण

    SWMS for working in roof spaces, ceiling spaces and subfloors: electrical hazards, ladders, heat stress, vermin, snakes and emergency response.

    अलग से भी मिलता है
  82. Materials Duct Lifter

    SWMS · काम के 6 चरण

    Materials Duct Lifter SWMS: 6 job steps covering site set-up, power line clearances, lifter pre-inspection, operation and emergency response.

    अलग से भी मिलता है
  83. Electricians Safety Management Plan

    मैनेजमेंट प्लान · काम के 8 चरण

    A safety management plan for electrical businesses: policy, live and de-energised work, emergency response, first aid, incidents, permits and forms.

    अलग से भी मिलता है
  84. Working On/Near Telecommunications Towers

    SWMS · काम के 8 चरण

    Working on or near telecommunications towers SWMS: 8 job steps covering tower climbing, falls, RF exposure, completion and emergencies.

    अलग से भी मिलता है
  85. Asbestos Awareness

    SWMS · काम के 4 चरण

    Asbestos Awareness SWMS: 4 job steps for identifying and reporting asbestos-containing materials and responding to accidental disturbance.

    अलग से भी मिलता है
  86. Cable Ladder Tray-Conduit Installation

    SWMS · काम के 12 चरण

    Cable ladder, tray and conduit installation SWMS: 12 job steps covering services, ladders and scaffold, tools, silica dust, hot work and emergencies.

    अलग से भी मिलता है
  87. Low Voltage Electrical Repairs and Installations

    SWMS · काम के 20 चरण

    SWMS for low voltage electrical repairs, maintenance and installations, including isolation, working near live parts, testing and appliances.

    अलग से भी मिलता है
  88. Electrical Temporary Connections

    SWMS · काम के 14 चरण

    Electrical Temporary Connections SWMS: 14 job steps from silica training and set-up to live electrical work, leads and emergency response.

    अलग से भी मिलता है
  89. Manual Handling

    SWMS · काम के 18 चरण

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    अलग से भी मिलता है
  90. Refrigerant Gas

    SWMS · काम के 9 चरण

    SWMS for the safe use of fluorocarbon refrigerants: licensing, cylinder transport and storage, refrigerant recovery, inspection and emergency response.

    अलग से भी मिलता है
  91. Confined Space Work

    SWMS · काम के 10 चरण

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    अलग से भी मिलता है
  92. Pipework Mechanical

    SWMS · काम के 19 चरण

    SWMS for mechanical pipework installation: fire system, condenser water and chilled water pipework, from site set-up to commissioning.

    अलग से भी मिलता है
  93. Mechanical Ventilation System

    SWMS · काम के 15 चरण

    Mechanical Ventilation System SWMS: 15 job steps for installing a commercial kitchen exhaust canopy or hood, from set-up to emergency response.

    अलग से भी मिलता है
  94. Electrical New Installation

    SWMS · काम के 20 चरण

    SWMS for new electrical installations: planning, site set-up, tools, ladders, live work, excavation, switchboards, testing and emergencies.

    अलग से भी मिलता है
  95. Electrical Demolition

    SWMS · काम के 13 चरण

    Electrical Demolition SWMS: 13 job steps covering power shutdown, removing fixtures and cabling, asbestos, ceiling spaces and working at height.

    अलग से भी मिलता है
  96. Silica Dust

    SWMS · काम के 14 चरण

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    अलग से भी मिलता है
  97. Duct Work Installation

    SWMS · काम के 11 चरण

    SWMS for installing ductwork for exhaust and air conditioning systems: site set-up, delivery, roof space work, tools, chemicals and emergencies.

    अलग से भी मिलता है
  98. Mobile Plant Working Near-Around

    SWMS · काम के 8 चरण

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    अलग से भी मिलता है
  99. Height Access Equipment

    SWMS · काम के 17 चरण

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    अलग से भी मिलता है
  100. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · काम के 12 चरण

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    अलग से भी मिलता है
  101. Electrical Renovations

    SWMS · काम के 20 चरण

    Electrical Renovations SWMS: 20 job steps covering power isolation, switchboards, rough-in, fitting appliances, commissioning and emergencies.

    अलग से भी मिलता है
  102. Air Conditioning Installation

    SWMS · काम के 16 चरण

    Covers installing, maintaining or repairing air conditioning units, with the risks and controls for each job step from planning to emergency response.

    अलग से भी मिलता है
  103. Switchboard Installation

    SWMS · काम के 14 चरण

    SWMS for installing switchboards, covering energised electrical work, arc flash, silica and asbestos controls, ladders and emergency response.

    अलग से भी मिलता है
  104. Risers Working In

    SWMS · काम के 12 चरण

    Safe work method statement for working in risers, covering 12 job steps from rescue planning and entry assessment to falls, heat stress and emergencies.

    अलग से भी मिलता है
  105. Confined Space Emergency Rescue Plan

    मैनेजमेंट प्लान · 11 सेक्शन

    A seven-step emergency rescue plan for confined spaces, with site details, assembly points, first aid officers and rescue equipment.

    अलग से भी मिलता है
  106. Cable Hauling

    SWMS · काम के 16 चरण

    A SWMS for cable hauling near roads and in pits or manholes: the hazards and controls from training and planning to pulling cable and emergency response.

    अलग से भी मिलता है
  107. Powered Non-powered Tools

    SWMS · काम के 12 चरण

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    अलग से भी मिलता है
  108. Psychosocial Hazards Management Plan

    मैनेजमेंट प्लान · 4 सेक्शन

    A plan to manage and prevent psychosocial hazards at work, with policies, procedures, a risk assessment checklist and incident report forms.

    अलग से भी मिलता है
  109. Workplace Sexual and Gender-Based Harassment Prevention Plan

    मैनेजमेंट प्लान · 11 सेक्शन

    A prevention plan for sexual and gender-based harassment, with a policy, risk assessment, complaint process, incident report form and checklist.

    अलग से भी मिलता है
  110. PH Incident Report Form

    फ़ॉर्म · 22 फ़ील्ड

    An incident report form for recording a behaviour or incident, the people involved, witnesses and follow-up, with informal and formal complaint steps.

    अलग से भी मिलता है
  111. DV Workplace Safety Plan

    मैनेजमेंट प्लान · 2 सेक्शन

    A plan to support a worker affected by domestic violence, with contact details, safety measures and a short risk assessment to fill in.

    अलग से भी मिलता है
  112. Psychosocial Risk Assessment Checklist

    फ़ॉर्म · 25 सेक्शन

    A psychosocial risk assessment checklist of 113 questions in 24 hazard groups, with a line for current controls and possible solutions under each question.

    सिर्फ़ इसी सिस्टम में
  113. Hand Tools

    SOP · 9 सेक्शन

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    अलग से भी मिलता है
  114. Oxy-Acetylene Welding

    SOP · 9 सेक्शन

    Safe operating procedure for oxy-acetylene welding: hazards, PPE, training, pre-operational inspection, step-by-step operation and a register.

    अलग से भी मिलता है
  115. Handheld Power Tools

    SOP · 9 सेक्शन

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    अलग से भी मिलता है
  116. Cherry Picker

    SOP · 10 सेक्शन

    Safe operating procedure for a cherry picker: hazards, PPE, inspection, function tests, operation, emergency response and a hazard checklist.

    अलग से भी मिलता है
  117. Scissor Lift

    SOP · 10 सेक्शन

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    अलग से भी मिलता है
  118. Platform Ladder

    SOP · 7 सेक्शन

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    अलग से भी मिलता है
  119. Extension Ladder

    SOP · 7 सेक्शन

    Extension ladder safe operating procedure: hazards, pre-use inspection, transporting, set-up, use and carrying, with a training register.

    अलग से भी मिलता है
  120. Refrigerant Gases

    SOP · 12 सेक्शन

    Safe operating procedure for refrigerant gases: hazards, PPE, tank transport, handling, storage, filling and maintenance, with a training register.

    अलग से भी मिलता है
  121. Manual Handling

    SOP · 5 सेक्शन

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    अलग से भी मिलता है

इसमें क्या-क्या है

इसमें शामिल ख़तरे

इसमें दिए गए कानून और मानक

हर SWMS के साथ कानूनों और कोड ऑफ़ प्रैक्टिस की हमारी संदर्भ सूची आती है।

सिस्टम के हिस्से कैसे जुड़ते हैं

हर दस्तावेज़ उन दस्तावेज़ों की ओर इशारा करता है जिन पर वह निर्भर है, नियम तय करने वाले प्लान से लेकर काम के दिन क्रू के काम तक।

SWMS

Solar Installationकाम के 17 चरणअलग से भी मिलता हैRefrigerationकाम के 18 चरणअलग से भी मिलता हैAir Conditioning Service and Repairsकाम के 14 चरणअलग से भी मिलता हैWorking in Roof Spacesकाम के 8 चरणअलग से भी मिलता हैMaterials Duct Lifterकाम के 6 चरणअलग से भी मिलता हैWorking On/Near Telecommunications Towersकाम के 8 चरणअलग से भी मिलता हैAsbestos Awarenessकाम के 4 चरणअलग से भी मिलता हैCable Ladder Tray-Conduit Installationकाम के 12 चरणअलग से भी मिलता हैLow Voltage Electrical Repairs and Installationsकाम के 20 चरणअलग से भी मिलता हैElectrical Temporary Connectionsकाम के 14 चरणअलग से भी मिलता हैManual Handlingकाम के 18 चरणअलग से भी मिलता हैRefrigerant Gasकाम के 9 चरणअलग से भी मिलता हैConfined Space Workकाम के 10 चरणअलग से भी मिलता हैPipework Mechanicalकाम के 19 चरणअलग से भी मिलता हैMechanical Ventilation Systemकाम के 15 चरणअलग से भी मिलता हैElectrical New Installationकाम के 20 चरणअलग से भी मिलता हैElectrical Demolitionकाम के 13 चरणअलग से भी मिलता हैSilica Dustकाम के 14 चरणअलग से भी मिलता हैDuct Work Installationकाम के 11 चरणअलग से भी मिलता हैMobile Plant Working Near-Aroundकाम के 8 चरणअलग से भी मिलता हैHeight Access Equipmentकाम के 17 चरणअलग से भी मिलता हैEWP, Boom, Cherry Picker and Scissor Liftकाम के 12 चरणअलग से भी मिलता हैElectrical Renovationsकाम के 20 चरणअलग से भी मिलता हैAir Conditioning Installationकाम के 16 चरणअलग से भी मिलता हैSwitchboard Installationकाम के 14 चरणअलग से भी मिलता हैRisers Working Inकाम के 12 चरणअलग से भी मिलता हैCable Haulingकाम के 16 चरणअलग से भी मिलता हैPowered Non-powered Toolsकाम के 12 चरणअलग से भी मिलता है

फ़ॉर्म, रजिस्टर और चेकलिस्ट

PPE Register6 फ़ील्डअलग से भी मिलता हैRoles and Responsibilities Schedule1 फ़ील्डअलग से भी मिलता हैMeeting and Toolbox Talk Record8 फ़ील्डइनका हवाला देता है: Hazard Report Formअलग से भी मिलता हैCorrective and Preventative Actions Form9 फ़ील्डअलग से भी मिलता हैAnnual Audit Schedule1 फ़ील्डअलग से भी मिलता हैMonitoring Register7 फ़ील्डअलग से भी मिलता हैMonitoring and Measurement Schedule3 फ़ील्डअलग से भी मिलता हैIncident Register10 फ़ील्डअलग से भी मिलता हैInterested Parties Register5 फ़ील्डअलग से भी मिलता हैInfrastructure Responsibilities Register2 फ़ील्डअलग से भी मिलता हैWorker Training and Induction Register10 फ़ील्डअलग से भी मिलता हैEmergency Drill Report4 सेक्शनअलग से भी मिलता हैAS/NZS ISO 45001:2018 Internal Audit Checklist16 फ़ील्डअलग से भी मिलता हैQuarterly Objective and Targets Report7 फ़ील्डअलग से भी मिलता हैEmergency Response Register6 फ़ील्डअलग से भी मिलता हैOperations-Processes – Identification Form3 फ़ील्डअलग से भी मिलता हैChemical & SDS Register13 फ़ील्डअलग से भी मिलता हैVerification of Competency Record25 फ़ील्डअलग से भी मिलता हैOperational Control Register7 फ़ील्डअलग से भी मिलता हैIncident Report Form28 फ़ील्डअलग से भी मिलता हैPlant and Equipment Register13 फ़ील्डअलग से भी मिलता हैTraining Needs Register8 फ़ील्डइनका हवाला देता है: Organisation Chartअलग से भी मिलता हैAsbestos Register17 फ़ील्डअलग से भी मिलता हैOHS Procurement Request Form17 फ़ील्डअलग से भी मिलता हैInduction Checklist6 फ़ील्डअलग से भी मिलता हैOperational Control Development Worksheet11 फ़ील्डअलग से भी मिलता हैCorrective-Preventative Actions Register7 फ़ील्डअलग से भी मिलता हैOHS Supplier Questionnaire32 फ़ील्डसिर्फ़ इसी सिस्टम मेंInjuries/Illness Register10 फ़ील्डअलग से भी मिलता हैVerification of OHS Requirements Checklist19 फ़ील्डअलग से भी मिलता हैWorkplace Inspection Checklist5 फ़ील्डअलग से भी मिलता हैSOP Template9 फ़ील्डअलग से भी मिलता हैOutsourced Process Register9 फ़ील्डअलग से भी मिलता हैFirst Aid Worker Register8 फ़ील्डअलग से भी मिलता हैCompliance Evaluation Report11 फ़ील्डअलग से भी मिलता हैHealth Surveillance Record13 फ़ील्डअलग से भी मिलता हैHigh Risk Licence Table & Checklist2 सेक्शनअलग से भी मिलता हैSWMS Templateकाम के 1 चरणअलग से भी मिलता हैManagement Review Meeting Report7 फ़ील्डअलग से भी मिलता हैIsolation Permit to Work13 फ़ील्डअलग से भी मिलता हैWorkplace Violence Report Form22 फ़ील्डअलग से भी मिलता हैObjectives Summary Form7 फ़ील्डअलग से भी मिलता हैWork Groups Register8 फ़ील्डअलग से भी मिलता हैDocument Register14 फ़ील्डअलग से भी मिलता हैRisk Register8 फ़ील्डअलग से भी मिलता हैOHS Supplier Evaluation Scorecard10 फ़ील्डअलग से भी मिलता हैRisk Assessment Form8 फ़ील्डसिर्फ़ इसी सिस्टम मेंObjectives and Targets Register5 फ़ील्डअलग से भी मिलता हैChemical Risk Assessment Form28 फ़ील्डअलग से भी मिलता हैChemical Manifest17 फ़ील्डअलग से भी मिलता हैChange Request Form16 फ़ील्डअलग से भी मिलता हैWorker Training Record10 फ़ील्डअलग से भी मिलता हैElectrical Equipment Register8 फ़ील्डअलग से भी मिलता हैOrganisation Chart5 सेक्शनसिर्फ़ इसी सिस्टम मेंRoles, Responsibilities, Accountabilities and Authorities Register6 फ़ील्डअलग से भी मिलता हैHazard Report Form14 फ़ील्डइनका हवाला देता है: Incident Report Formअलग से भी मिलता हैWorker Competency Register10 फ़ील्डअलग से भी मिलता हैCommunications Program Schedule5 फ़ील्डअलग से भी मिलता हैInternal Audit Report11 फ़ील्डअलग से भी मिलता हैCompetency Mapping Register5 फ़ील्डअलग से भी मिलता हैDisaster Recovery Response Register8 फ़ील्डअलग से भी मिलता हैWorking Alone Communication Log28 फ़ील्डअलग से भी मिलता हैNon-Conformance Report12 फ़ील्डअलग से भी मिलता हैAudiometric Testing Record9 फ़ील्डअलग से भी मिलता हैMonitoring and Measuring Equipment Register5 फ़ील्डअलग से भी मिलता हैCompliance Requirements Register3 फ़ील्डअलग से भी मिलता हैPH Incident Report Form22 फ़ील्डअलग से भी मिलता हैPsychosocial Risk Assessment Checklist25 सेक्शनसिर्फ़ इसी सिस्टम में

रिव्यू

अभी कोई रिव्यू नहीं।

टेम्पलेट कैसे काम करते हैं

आज़माएँ, पैसे देने से पहले।

  1. मुफ़्त प्रीव्यू

    हर टेम्पलेट के काम के चरण, ख़तरे और पहला काम पढ़ने के लिए खुले हैं। साइन अप की ज़रूरत नहीं।

  2. एडिटर आज़माएँ

    कंप्यूटर या अपने फ़ोन पर, एक डेमो SWMS को अपनी कंपनी, जॉब और साइट के हिसाब से ढालें।

  3. मुफ़्त में साइन अप करें

    आपकी जानकारी और लोगो साथ आ जाते हैं। यह टेम्पलेट पहले से भरा हुआ खुलता है।

  4. क्रेडिट इस्तेमाल करें या एक बार ख़रीदें

    पेड प्लान में हर महीने टेम्पलेट क्रेडिट मिलते हैं। या यह टेम्पलेट हमेशा के लिए ख़रीद लें।