얼리 액세스 혜택:얼리 액세스: 30% 할인, 구독을 유지하는 동안 계속.

혜택 받기

템플릿 문서는 영어로 작성되어 있습니다.

알뜰 팩 · 템플릿 22개

Landscaping

알뜰 팩 · PACK-50058

Landscaping 알뜰 팩 템플릿 미리보기
  • 템플릿 22개
  • 15 가격에 22개
  • 라이브러리 폴더 하나에 모두 담겨 제공

A set of 22 SWMS for landscaping contractors: retaining walls, paving, decking, turf laying, tree felling and fencing.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost 15 template credits instead of 22.

Mobile Plant Working Near-Around SWMS 미리 보기

Mobile Plant Working Near-Around

SWMSVersion 8
Company doing the work
[Company]
Business contact
—
Phone #
—
Responsible person (for monitoring SWMS and work)
—
Signature
—
Date
—
Contact phone #
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone #
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column)

  • Mobile Plant

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Undertake a site-specific induction, including training in communication with plant operators:

        • Groundworkers instructed on:

          • The UHF channel to communicate with plant operators

          • Not to approach mobile plant until the operator has agreed to their request to approach

          • On set distances to maintain from the mobile plant while in operation

          • Groundworkers and mobile plant operators are aware of any traffic management plan and no go zones

          • Are made familiar with the blind spots of the mobile plant

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures unanticipated hazards.

      After controls2 Moderate
      Responsible
      • Supervisorto check the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

작업 단계 7개 더: Housekeeping부터 Emergency response까지

단계마다 위험 요소, 위험도 평가, 관리 조치가 있고, 작업자 서명란도 포함됩니다.

미리 보기 방식

브라우저에서 보이는 모습

이 알뜰 팩 받기

무료로 가입한 뒤 받는 방법을 선택하세요. 모든 문서가 팩 이름으로 된 폴더에 담겨 라이브러리에 들어갑니다.

  • 유료 요금제에 포함

    요금제의 템플릿 크레딧을 사용하세요. 이 팩은 22 대신 15입니다.

    요금제와 가격 비교
  • 한 번 구매하기

    $1,349.25 $1,978.90 한 번 결제로 계속 소유합니다. 무료 요금제에서도 사용할 수 있습니다.

가입에 카드가 필요 없습니다. 얼리 액세스 회원은 모든 요금제에서 30% 할인을 받습니다.

포함 내용

  1. Mobile Plant Working Near-Around

    SWMS · 작업 단계 8개

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    단독으로도 판매
  2. Retaining Wall

    SWMS · 작업 단계 19개

    SWMS for building retaining walls: post and sleeper, masonry block and rock walls, from design and excavation to completion and emergencies.

    단독으로도 판매
  3. Tree Felling - Manual

    SWMS · 작업 단계 15개

    SWMS for manual tree felling: training, power line permits, traffic, chainsaw use, cross-cutting, moving felled trees, fuelling and emergencies.

    단독으로도 판매
  4. Landscape Planting

    SWMS · 작업 단계 18개

    SWMS for landscape planting on roadsides and public sites: traffic, mobile plant, tools, soil and mulch, slopes, weather and emergencies.

    단독으로도 판매
  5. Tipper and Dog

    SWMS · 작업 단계 16개

    Hazards and controls for operating a tip truck and dog trailer, including side tippers, from coupling trailers to tipping, refuelling and emergency response.

    단독으로도 판매
  6. Paving

    SWMS · 작업 단계 19개

    Paving SWMS: 19 job steps covering subgrade preparation, cutting and laying pavers, silica dust, cement, acid washing and emergencies.

    단독으로도 판매
  7. Decking

    SWMS · 작업 단계 19개

    SWMS for building a timber deck: falls from height, mobile plant, post footings, silica dust, wet cement and deck finishes.

    단독으로도 판매
  8. Turf Laying

    SWMS · 작업 단계 13개

    Turf Laying SWMS: thirteen job steps covering the hazards and controls for preparing the site and laying turf, from delivery to emergency response.

    단독으로도 판매
  9. Lasers

    SWMS · 작업 단계 9개

    Lasers SWMS: 9 job steps covering Class 1, 2 and 3R construction lasers, beam set-up, eye injury, mobile plant, roadside work and emergencies.

    단독으로도 판매
  10. Bark Blower Truck

    SWMS · 작업 단계 13개

    SWMS for bark blower truck work: trailer coupling, travel between sites, loading and spreading soil, mulch and bark, traffic, refuelling and emergencies.

    단독으로도 판매
  11. Bites and Stings Prevention and Treatment

    SWMS · 작업 단계 9개

    Bites and Stings SWMS: nine job steps covering snake, spider, bee, wasp, tick and mosquito bite prevention, first aid and emergency response outdoors.

    단독으로도 판매
  12. Fencing

    SWMS · 작업 단계 16개

    Fencing SWMS: 16 job steps for wire, timber, steel panel, pool and glass panel fences, from planning to post holes, gates and emergencies.

    단독으로도 판매
  13. Earthmoving Equipment

    SWMS · 작업 단계 23개

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    단독으로도 판매
  14. Powered Non-powered Tools

    SWMS · 작업 단계 12개

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    단독으로도 판매
  15. Wood Chipper

    SWMS · 작업 단계 14개

    Wood Chipper SWMS: fourteen job steps covering delivery, set-up, operation, refuelling and emergency response for roadside wood chipping.

    단독으로도 판매
  16. Manual Handling

    SWMS · 작업 단계 18개

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    단독으로도 판매
  17. Landscaping Irrigation

    SWMS · 작업 단계 15개

    SWMS for landscaping irrigation installation: trenching, excavation, pipework, controller wiring, services, site set-up and emergency response.

    단독으로도 판매
  18. Concrete Slab on Ground

    SWMS · 작업 단계 17개

    Safe work method statement for concrete slab on ground work, covering formwork, fill and steel reinforcement placement, with the hazards and controls for each job step.

    단독으로도 판매
  19. Water Features

    SWMS · 작업 단계 18개

    Water Features SWMS: 18 job steps for installing water features and garden ponds, from excavation and liners to pumps and emergency response.

    단독으로도 판매
  20. Stump Grinder

    SWMS · 작업 단계 14개

    SWMS for stump grinder work: delivery and coupling, traffic, set-up, operation, refuelling and emergency response.

    단독으로도 판매
  21. Soft-fall Surface Removal and Installation

    SWMS · 작업 단계 14개

    SWMS for removing and installing soft-fall surfacing: site set-up, removal, wet pour rubber mixing and laying, refuelling and emergencies.

    단독으로도 판매
  22. Synthetic Grass Laying

    SWMS · 작업 단계 17개

    Synthetic Grass Laying SWMS: 17 job steps from turf removal and subgrade preparation to grass laying, seaming, re-fuelling and emergencies.

    단독으로도 판매

다루는 내용

다루는 위험 요소

참조하는 법령 및 표준

모든 SWMS에는 관련 법령 및 실무 규정(code of practice) 참조 목록이 포함됩니다.

절약 금액

템플릿작업 단계단독 구매
Mobile Plant Working Near-Around8$89.95 · 1크레딧
Retaining Wall19$89.95 · 1크레딧
Tree Felling - Manual15$89.95 · 1크레딧
Landscape Planting18$89.95 · 1크레딧
Tipper and Dog16$89.95 · 1크레딧
Paving19$89.95 · 1크레딧
Decking19$89.95 · 1크레딧
Turf Laying13$89.95 · 1크레딧
Lasers9$89.95 · 1크레딧
Bark Blower Truck13$89.95 · 1크레딧
Bites and Stings Prevention and Treatment9$89.95 · 1크레딧
Fencing16$89.95 · 1크레딧
Earthmoving Equipment23$89.95 · 1크레딧
Powered Non-powered Tools12$89.95 · 1크레딧
Wood Chipper14$89.95 · 1크레딧
Manual Handling18$89.95 · 1크레딧
Landscaping Irrigation15$89.95 · 1크레딧
Concrete Slab on Ground17$89.95 · 1크레딧
Water Features18$89.95 · 1크레딧
Stump Grinder14$89.95 · 1크레딧
Soft-fall Surface Removal and Installation14$89.95 · 1크레딧
Synthetic Grass Laying17$89.95 · 1크레딧
하나씩 구매 시$1,978.90 · 22크레딧
이 팩으로 구매 시$1,349.25 · 15크레딧 $629.65 절약

리뷰

아직 리뷰가 없습니다.

템플릿 이용 방법

먼저 써 보고 결제하세요.

  1. 무료 미리 보기

    모든 템플릿의 작업 단계, 위험 요소, 첫 번째 작업 내용을 자유롭게 볼 수 있습니다. 가입이 필요 없습니다.

  2. 에디터 써 보기

    컴퓨터나 휴대폰에서 데모 SWMS에 회사, 작업, 현장 정보를 넣어 보세요.

  3. 무료 가입

    입력한 정보와 로고가 그대로 옮겨집니다. 이 템플릿이 정보가 채워진 상태로 열립니다.

  4. 크레딧 사용 또는 한 번 구매

    유료 요금제에는 매달 템플릿 크레딧이 포함됩니다. 또는 이 템플릿만 구매해 계속 소유하세요.