ਅਰਲੀ ਐਕਸੈਸ ਪੇਸ਼ਕਸ਼:ਅਰਲੀ ਐਕਸੈਸ: 30% ਛੋਟ, ਜਦੋਂ ਤੱਕ ਤੁਸੀਂ ਸਬਸਕ੍ਰਾਈਬ ਰਹਿੰਦੇ ਹੋ.

ਪੇਸ਼ਕਸ਼ ਲਓ

ਟੈਂਪਲੇਟ ਦਸਤਾਵੇਜ਼ ਅੰਗਰੇਜ਼ੀ ਵਿੱਚ ਲਿਖੇ ਹੋਏ ਹਨ।

ਵੈਲਿਊ ਪੈਕ · 34 ਟੈਂਪਲੇਟ

Plumbing Combo

ਵੈਲਿਊ ਪੈਕ · PACK-50346

Plumbing Combo ਵੈਲਿਊ ਪੈਕ ਟੈਂਪਲੇਟ ਦੀ ਝਲਕ
  • 34 ਟੈਂਪਲੇਟ
  • 24 ਦੀ ਕੀਮਤ ਵਿੱਚ 34
  • ਇੱਕੋ ਲਾਇਬ੍ਰੇਰੀ ਫੋਲਡਰ ਵਿੱਚ ਆਉਂਦਾ ਹੈ

A set of 23 SWMS, nine SOPs and two plans for plumbers.

The SWMS cover drainage, rough-in and final fit-out, trench excavation, water jetting, CCTV drain inspection and pumps and valves. The SOPs include Oxy-Acetylene Welding, HDPE Butt Fusion and Extension Ladder. It also includes Falls Emergency Rescue Plan and Confined Space Emergency Rescue Plan.

Each document is the same one sold on its own, so you get every update to it. Together they cost 24 template credits instead of 34.

Height Access Equipment SWMS ਦੀ ਝਲਕ

Height Access Equipment

SWMSVersion 11
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures for unanticipated hazards.

      After controls2 Moderate
      Responsible
      • SupervisorCheck the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

ਕੰਮ ਦੇ 16 ਹੋਰ ਕਦਮ, Work area set-up ਤੋਂ Emergency response ਤੱਕ

ਹਰ ਇੱਕ ਆਪਣੇ ਖ਼ਤਰਿਆਂ, ਜੋਖਮ ਰੇਟਿੰਗਾਂ ਅਤੇ ਕੰਟਰੋਲਾਂ ਸਮੇਤ, ਨਾਲ ਤੁਹਾਡੀ ਟੀਮ ਦਾ ਸਾਈਨ-ਆਨ।

ਇਸ ਤਰ੍ਹਾਂ ਝਲਕ ਵੇਖੋ

ਬ੍ਰਾਊਜ਼ਰ ਵਿੱਚ ਇਹ ਕਿਵੇਂ ਦਿਸਦਾ ਹੈ

ਇਹ ਵੈਲਿਊ ਪੈਕ ਲਓ

ਮੁਫ਼ਤ ਸਾਈਨ ਅੱਪ ਕਰੋ, ਫਿਰ ਚੁਣੋ ਕਿ ਤੁਸੀਂ ਇਹ ਕਿਵੇਂ ਲੈਣਾ ਚਾਹੁੰਦੇ ਹੋ। ਹਰ ਦਸਤਾਵੇਜ਼ ਤੁਹਾਡੀ ਲਾਇਬ੍ਰੇਰੀ ਵਿੱਚ, ਪੈਕ ਦੇ ਨਾਂ ਵਾਲੇ ਫੋਲਡਰ ਵਿੱਚ ਜਾਂਦਾ ਹੈ।

  • ਪੇਡ ਪਲਾਨਾਂ ਵਿੱਚ ਸ਼ਾਮਲ

    ਆਪਣੇ ਪਲਾਨ ਦੇ ਟੈਂਪਲੇਟ ਕ੍ਰੈਡਿਟ ਵਰਤੋ। ਇਸ ਪੈਕ ਦੀ ਕੀਮਤ 34 ਦੀ ਬਜਾਏ 24 ਹੈ।

    ਪਲਾਨ ਅਤੇ ਕੀਮਤਾਂ ਦੀ ਤੁਲਨਾ ਕਰੋ
  • ਇੱਕ ਵਾਰ ਖ਼ਰੀਦੋ

    $2,158.80 $3,058.30 ਇੱਕ ਵਾਰ ਭੁਗਤਾਨ, ਅਤੇ ਇਹ ਹਮੇਸ਼ਾ ਲਈ ਤੁਹਾਡਾ। ਮੁਫ਼ਤ ਪਲਾਨ 'ਤੇ ਵੀ ਚੱਲਦਾ ਹੈ।

ਸਾਈਨ ਅੱਪ ਲਈ ਕੋਈ ਕਾਰਡ ਨਹੀਂ ਚਾਹੀਦਾ। ਅਰਲੀ ਐਕਸੈਸ ਮੈਂਬਰਾਂ ਨੂੰ ਹਰ ਪਲਾਨ 'ਤੇ 30% ਛੋਟ ਮਿਲਦੀ ਹੈ।

ਕੀ ਸ਼ਾਮਲ ਹੈ

  1. Height Access Equipment

    SWMS · ਕੰਮ ਦੇ 17 ਕਦਮ

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  2. Extension Ladder

    SOP · 7 ਭਾਗ

    Extension ladder safe operating procedure: hazards, pre-use inspection, transporting, set-up, use and carrying, with a training register.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  3. Roof Work

    SWMS · ਕੰਮ ਦੇ 14 ਕਦਮ

    SWMS for roof work: hazards and controls for falls from height, asbestos, access by scaffold, ladder or hatch, harness use, tools and emergencies.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  4. Mobile Plant Working Near-Around

    SWMS · ਕੰਮ ਦੇ 8 ਕਦਮ

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  5. Falls Emergency Rescue Plan

    ਪ੍ਰਬੰਧਨ ਯੋਜਨਾ · 14 ਭਾਗ

    A pre-planned procedure for rescuing a worker who has fallen and is suspended in a harness, with a pre-planning checklist and a site-specific rescue plan.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  6. Handheld Power Tools

    SOP · 9 ਭਾਗ

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  7. Trench Excavation

    SWMS · ਕੰਮ ਦੇ 15 ਕਦਮ

    Trench Excavation SWMS: 15 job steps covering excavating and working in trenches over 1.5 m deep, from planning to emergency response.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  8. Plumbing Drainage

    SWMS · ਕੰਮ ਦੇ 18 ਕਦਮ

    Plumbing drainage SWMS for installing pipes, stormwater tanks and polyethylene pipe welding, and for sewage and stormwater drainage on civil works.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  9. CCTV Drain Inspection

    SWMS · ਕੰਮ ਦੇ 12 ਕਦਮ

    Covers the hazards and controls for inspecting drains using CCTV technology, with the risks and controls for each job step from weather checks to emergency response.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  10. Rough-in Final Fit-out Plumbing

    SWMS · ਕੰਮ ਦੇ 18 ਕਦਮ

    Rough-in Final Fit-out Plumbing SWMS: 18 job steps covering pipework, appliances and fixtures, excavation, hot work, silica dust and emergencies.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  11. Manual Handling

    SOP · 5 ਭਾਗ

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  12. Water Jetting Drains

    SWMS · ਕੰਮ ਦੇ 16 ਕਦਮ

    Hazards and controls for clearing blocked sewers and drains with a truck-mounted hydro-jet, from site set-up and pump use to emergency response.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  13. Plumbing Suspended Pipework

    SWMS · ਕੰਮ ਦੇ 18 ਕਦਮ

    A SWMS for installing suspended pipework from elevating work platforms, covering 18 job steps with their hazards and controls.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  14. Risers Working In

    SWMS · ਕੰਮ ਦੇ 12 ਕਦਮ

    Safe work method statement for working in risers, covering 12 job steps from rescue planning and entry assessment to falls, heat stress and emergencies.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  15. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · ਕੰਮ ਦੇ 12 ਕਦਮ

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  16. Platform Ladder

    SOP · 7 ਭਾਗ

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  17. Plumbing Pump-Valve Installation

    SWMS · ਕੰਮ ਦੇ 20 ਕਦਮ

    A SWMS for removing and installing industrial pumps and valves: lock-out, disconnection, lifting, fitting and pressure testing.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  18. Oxy-Acetylene Welding

    SOP · 9 ਭਾਗ

    Safe operating procedure for oxy-acetylene welding: hazards, PPE, training, pre-operational inspection, step-by-step operation and a register.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  19. Plumbing Temporary Services Connection

    SWMS · ਕੰਮ ਦੇ 17 ਕਦਮ

    Plumbing Temporary Services Connection SWMS: 17 job steps for temporary water and sewerage connections on construction sites.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  20. Hand Tools

    SOP · 9 ਭਾਗ

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  21. Earthmoving Equipment

    SWMS · ਕੰਮ ਦੇ 23 ਕਦਮ

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  22. Fire Sprinkler System Installation

    SWMS · ਕੰਮ ਦੇ 19 ਕਦਮ

    A SWMS for installing fire sprinkler systems from elevating work platforms: EWP operation, working at height, hot work, silica dust and commissioning.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  23. Cherry Picker

    SOP · 10 ਭਾਗ

    Safe operating procedure for a cherry picker: hazards, PPE, inspection, function tests, operation, emergency response and a hazard checklist.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  24. Electric Fusion - Poly Pipe Butt Welding (PPW)

    SWMS · ਕੰਮ ਦੇ 11 ਕਦਮ

    Electric fusion poly pipe butt welding SWMS: 11 job steps covering mobile plant, hazardous atmospheres, hot plate and facer use, and emergencies.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  25. Powered Non-powered Tools

    SWMS · ਕੰਮ ਦੇ 12 ਕਦਮ

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  26. Scissor Lift

    SOP · 10 ਭਾਗ

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  27. Plumbing Gas Fitting

    SWMS · ਕੰਮ ਦੇ 21 ਕਦਮ

    Plumbing Gas Fitting SWMS: 21 job steps for gas fitting work, from planning and excavation to pipework, purging and pressure testing.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  28. Manual Handling

    SWMS · ਕੰਮ ਦੇ 18 ਕਦਮ

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  29. Confined Space Work

    SWMS · ਕੰਮ ਦੇ 10 ਕਦਮ

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  30. Plumbing - Water Meter Installation

    SWMS · ਕੰਮ ਦੇ 16 ਕਦਮ

    Plumbing SWMS for installing water meters: 16 job steps from site assessment and electrical hazards to excavation, confined space and emergency response.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  31. Plumbing Drain Re-lining

    SWMS · ਕੰਮ ਦੇ 14 ਕਦਮ

    SWMS for drain re-lining: silica dust, confined spaces, mobile plant, resins and air compressors, with controls for 14 job steps.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  32. Confined Space Emergency Rescue Plan

    ਪ੍ਰਬੰਧਨ ਯੋਜਨਾ · 11 ਭਾਗ

    A seven-step emergency rescue plan for confined spaces, with site details, assembly points, first aid officers and rescue equipment.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  33. Plumbing Call-out

    SWMS · ਕੰਮ ਦੇ 20 ਕਦਮ

    Plumbing call-out SWMS: 20 job steps covering general repairs, hot water systems and boilers, gas, hot work, asbestos and working at height.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  34. HDPE Butt Fusion

    SOP · 8 ਭਾਗ

    Safe operating procedure for HDPE butt fusion welding: hazards, PPE, inspection, step-by-step operation, maintenance and a hazard checklist.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ

ਇਸ ਵਿੱਚ ਕੀ ਹੈ

ਇਸ ਵਿੱਚ ਸ਼ਾਮਲ ਖ਼ਤਰੇ

ਕਾਨੂੰਨ ਅਤੇ ਮਿਆਰ ਜਿਨ੍ਹਾਂ ਦਾ ਇਸ ਵਿੱਚ ਹਵਾਲਾ ਹੈ

ਹਰ SWMS ਨਾਲ ਸਾਡੀ ਕਾਨੂੰਨਾਂ ਅਤੇ ਅਭਿਆਸ ਕੋਡਾਂ (codes of practice) ਦੀ ਹਵਾਲਾ ਸੂਚੀ ਆਉਂਦੀ ਹੈ।

ਤੁਹਾਡੀ ਬੱਚਤ

ਟੈਂਪਲੇਟਕੰਮ ਦੇ ਕਦਮਇਕੱਲਾ
Height Access Equipment17$89.95 · 1 ਕ੍ਰੈਡਿਟ
Extension Ladder0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Roof Work14$89.95 · 1 ਕ੍ਰੈਡਿਟ
Mobile Plant Working Near-Around8$89.95 · 1 ਕ੍ਰੈਡਿਟ
Falls Emergency Rescue Plan0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Handheld Power Tools0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Trench Excavation15$89.95 · 1 ਕ੍ਰੈਡਿਟ
Plumbing Drainage18$89.95 · 1 ਕ੍ਰੈਡਿਟ
CCTV Drain Inspection12$89.95 · 1 ਕ੍ਰੈਡਿਟ
Rough-in Final Fit-out Plumbing18$89.95 · 1 ਕ੍ਰੈਡਿਟ
Manual Handling0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Water Jetting Drains16$89.95 · 1 ਕ੍ਰੈਡਿਟ
Plumbing Suspended Pipework18$89.95 · 1 ਕ੍ਰੈਡਿਟ
Risers Working In12$89.95 · 1 ਕ੍ਰੈਡਿਟ
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 ਕ੍ਰੈਡਿਟ
Platform Ladder0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Plumbing Pump-Valve Installation20$89.95 · 1 ਕ੍ਰੈਡਿਟ
Oxy-Acetylene Welding0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Plumbing Temporary Services Connection17$89.95 · 1 ਕ੍ਰੈਡਿਟ
Hand Tools0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Earthmoving Equipment23$89.95 · 1 ਕ੍ਰੈਡਿਟ
Fire Sprinkler System Installation19$89.95 · 1 ਕ੍ਰੈਡਿਟ
Cherry Picker0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Electric Fusion - Poly Pipe Butt Welding (PPW)11$89.95 · 1 ਕ੍ਰੈਡਿਟ
Powered Non-powered Tools12$89.95 · 1 ਕ੍ਰੈਡਿਟ
Scissor Lift0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Plumbing Gas Fitting21$89.95 · 1 ਕ੍ਰੈਡਿਟ
Manual Handling18$89.95 · 1 ਕ੍ਰੈਡਿਟ
Confined Space Work10$89.95 · 1 ਕ੍ਰੈਡਿਟ
Plumbing - Water Meter Installation16$89.95 · 1 ਕ੍ਰੈਡਿਟ
Plumbing Drain Re-lining14$89.95 · 1 ਕ੍ਰੈਡਿਟ
Confined Space Emergency Rescue Plan0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Plumbing Call-out20$89.95 · 1 ਕ੍ਰੈਡਿਟ
HDPE Butt Fusion0$89.95 · 1 ਕ੍ਰੈਡਿਟ
ਇੱਕ-ਇੱਕ ਕਰਕੇ ਖ਼ਰੀਦੇ$3,058.30 · 34 ਕ੍ਰੈਡਿਟ
ਇਸ ਪੈਕ ਵਿੱਚ$2,158.80 · 24 ਕ੍ਰੈਡਿਟ ਤੁਸੀਂ $899.50 ਬਚਾਉਂਦੇ ਹੋ

ਸਮੀਖਿਆਵਾਂ

ਅਜੇ ਕੋਈ ਸਮੀਖਿਆ ਨਹੀਂ।

ਟੈਂਪਲੇਟ ਕਿਵੇਂ ਕੰਮ ਕਰਦੇ ਹਨ

ਭੁਗਤਾਨ ਕਰਨ ਤੋਂ ਪਹਿਲਾਂ ਅਜ਼ਮਾਓ।

  1. ਮੁਫ਼ਤ ਝਲਕ

    ਹਰ ਟੈਂਪਲੇਟ ਦੇ ਕੰਮ ਦੇ ਕਦਮ, ਖ਼ਤਰੇ ਅਤੇ ਪਹਿਲਾ ਕੰਮ ਪੜ੍ਹਨ ਲਈ ਖੁੱਲ੍ਹੇ ਹਨ। ਸਾਈਨ ਅੱਪ ਦੀ ਲੋੜ ਨਹੀਂ।

  2. ਐਡੀਟਰ ਅਜ਼ਮਾਓ

    ਕੰਪਿਊਟਰ ਜਾਂ ਆਪਣੇ ਫ਼ੋਨ 'ਤੇ, ਇੱਕ ਡੈਮੋ SWMS ਨੂੰ ਆਪਣੀ ਕੰਪਨੀ, ਜੌਬ ਅਤੇ ਸਾਈਟ ਮੁਤਾਬਕ ਢਾਲੋ।

  3. ਮੁਫ਼ਤ ਸਾਈਨ ਅੱਪ ਕਰੋ

    ਤੁਹਾਡੇ ਵੇਰਵੇ ਅਤੇ ਲੋਗੋ ਨਾਲ ਆ ਜਾਂਦੇ ਹਨ। ਇਹ ਟੈਂਪਲੇਟ ਪਹਿਲਾਂ ਤੋਂ ਭਰਿਆ ਹੋਇਆ ਖੁੱਲ੍ਹਦਾ ਹੈ।

  4. ਕ੍ਰੈਡਿਟ ਵਰਤੋ ਜਾਂ ਇੱਕ ਵਾਰ ਖ਼ਰੀਦੋ

    ਪੇਡ ਪਲਾਨਾਂ ਵਿੱਚ ਹਰ ਮਹੀਨੇ ਟੈਂਪਲੇਟ ਕ੍ਰੈਡਿਟ ਸ਼ਾਮਲ ਹਨ। ਜਾਂ ਰੱਖਣ ਲਈ ਇਹ ਟੈਂਪਲੇਟ ਖ਼ਰੀਦੋ।