ਅਰਲੀ ਐਕਸੈਸ ਪੇਸ਼ਕਸ਼:ਅਰਲੀ ਐਕਸੈਸ: 30% ਛੋਟ, ਜਦੋਂ ਤੱਕ ਤੁਸੀਂ ਸਬਸਕ੍ਰਾਈਬ ਰਹਿੰਦੇ ਹੋ.

ਪੇਸ਼ਕਸ਼ ਲਓ

ਟੈਂਪਲੇਟ ਦਸਤਾਵੇਜ਼ ਅੰਗਰੇਜ਼ੀ ਵਿੱਚ ਲਿਖੇ ਹੋਏ ਹਨ।

ਵੈਲਿਊ ਪੈਕ · 38 ਟੈਂਪਲੇਟ

Shop-fitting OHS-WHS Industry Suite

ਵੈਲਿਊ ਪੈਕ · PACK-50470

Shop-fitting OHS-WHS Industry Suite ਵੈਲਿਊ ਪੈਕ ਟੈਂਪਲੇਟ ਦੀ ਝਲਕ
  • 38 ਟੈਂਪਲੇਟ
  • 27 ਦੀ ਕੀਮਤ ਵਿੱਚ 38
  • ਇੱਕੋ ਲਾਇਬ੍ਰੇਰੀ ਫੋਲਡਰ ਵਿੱਚ ਆਉਂਦਾ ਹੈ

A set of 15 SWMS, 22 SOPs and one plan for shop-fitters and fit-out contractors.

The SWMS cover site establishment, partitioning, plasterboard, suspended ceilings, glazing and soft demolition. The SOPs include Nail Gun - Pneumatic -, Reciprocating Saw and Table Saw. It also includes Construction OHS/WHS Project Management Plan.

Each document is the same one sold on its own, so you get every update to it. Together they cost 27 template credits instead of 38.

Construction OHS/WHS Project Management Plan ਦੀ ਝਲਕ

Construction OHS Site Management Plan

ਪ੍ਰਬੰਧਨ ਯੋਜਨਾVersion 2

Introduction

This Occupational Health and Safety (OHS) Site Management Plan (SMP) will assist in meeting OHS obligations under the current Regulations for this project. In conjunction with the applicable recording forms, this plan provides management of OHS on site.

This SMP will be available for inspection by all relevant persons, including visitors, direct workers, contractors, workers of contractors and government-appointed inspectors. The SMP is monitored and updated as required and the most current copy kept on-site for the duration of the project.

The SMP includes essential information for persons on-site to ensure health and safety as far as is reasonable. This information includes roles and responsibilities of key personnel, Health and Safety Representatives (HSR) and participation arrangements, guides for resolving issues, site rules, and procedures for hazard identification and control, risk assessments, managing incidents, emergency response and testing, monitoring and inspection procedures. The SMP also includes essential information for tasks that are “High Risk” including the development of Safe Work Method Statements (SWMS) and how these will be collected, assessed monitored and reviewed.

27 ਹੋਰ ਭਾਗ

  1. Review procedure
  2. Administration
  3. References
  4. Document control
  5. Policy
  6. ਅਤੇ 22 ਹੋਰ

ਪੂਰਾ ਲਿਖਿਆ ਹੋਇਆ, ਤੁਹਾਡੇ ਕਾਰੋਬਾਰ ਦੇ ਵੇਰਵਿਆਂ ਲਈ ਤਿਆਰ।

ਇਸ ਤਰ੍ਹਾਂ ਝਲਕ ਵੇਖੋ

ਬ੍ਰਾਊਜ਼ਰ ਵਿੱਚ ਇਹ ਕਿਵੇਂ ਦਿਸਦਾ ਹੈ

ਇਹ ਵੈਲਿਊ ਪੈਕ ਲਓ

ਮੁਫ਼ਤ ਸਾਈਨ ਅੱਪ ਕਰੋ, ਫਿਰ ਚੁਣੋ ਕਿ ਤੁਸੀਂ ਇਹ ਕਿਵੇਂ ਲੈਣਾ ਚਾਹੁੰਦੇ ਹੋ। ਹਰ ਦਸਤਾਵੇਜ਼ ਤੁਹਾਡੀ ਲਾਇਬ੍ਰੇਰੀ ਵਿੱਚ, ਪੈਕ ਦੇ ਨਾਂ ਵਾਲੇ ਫੋਲਡਰ ਵਿੱਚ ਜਾਂਦਾ ਹੈ।

  • ਪੇਡ ਪਲਾਨਾਂ ਵਿੱਚ ਸ਼ਾਮਲ

    ਆਪਣੇ ਪਲਾਨ ਦੇ ਟੈਂਪਲੇਟ ਕ੍ਰੈਡਿਟ ਵਰਤੋ। ਇਸ ਪੈਕ ਦੀ ਕੀਮਤ 38 ਦੀ ਬਜਾਏ 27 ਹੈ।

    ਪਲਾਨ ਅਤੇ ਕੀਮਤਾਂ ਦੀ ਤੁਲਨਾ ਕਰੋ
  • ਇੱਕ ਵਾਰ ਖ਼ਰੀਦੋ

    $2,428.65 $3,418.10 ਇੱਕ ਵਾਰ ਭੁਗਤਾਨ, ਅਤੇ ਇਹ ਹਮੇਸ਼ਾ ਲਈ ਤੁਹਾਡਾ। ਮੁਫ਼ਤ ਪਲਾਨ 'ਤੇ ਵੀ ਚੱਲਦਾ ਹੈ।

ਸਾਈਨ ਅੱਪ ਲਈ ਕੋਈ ਕਾਰਡ ਨਹੀਂ ਚਾਹੀਦਾ। ਅਰਲੀ ਐਕਸੈਸ ਮੈਂਬਰਾਂ ਨੂੰ ਹਰ ਪਲਾਨ 'ਤੇ 30% ਛੋਟ ਮਿਲਦੀ ਹੈ।

ਕੀ ਸ਼ਾਮਲ ਹੈ

  1. Construction OHS/WHS Project Management Plan

    ਪ੍ਰਬੰਧਨ ਯੋਜਨਾ · 28 ਭਾਗ

    A construction OHS/WHS site management plan covering site rules, risk management, contractors, incidents and the forms and registers a project needs.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  2. Tiling

    SWMS · ਕੰਮ ਦੇ 14 ਕਦਮ

    Tiling SWMS: 14 job steps covering silica dust, weather, delivery, ladders and scaffold, tile cutting, completion and emergencies.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  3. Painting and Decorating

    SWMS · ਕੰਮ ਦੇ 15 ਕਦਮ

    SWMS for painting and decorating work: transport, site set-up, ladders and scaffolds, surface preparation, mixing, spraying and emergencies.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  4. Cabinet Installation

    SWMS · ਕੰਮ ਦੇ 12 ਕਦਮ

    SWMS for cabinet making and installation: client consultation, site set-up, tools, hazardous substances, dust control, ladders, cuts and emergencies.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  5. Manual Handling

    SWMS · ਕੰਮ ਦੇ 18 ਕਦਮ

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  6. Plasterboard

    SWMS · ਕੰਮ ਦੇ 16 ਕਦਮ

    Plasterboard SWMS for fixing and setting sheets to walls and ceilings, with cornice: 16 job steps from silica dust training to cutting, sanding and stilts.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  7. Silica Dust

    SWMS · ਕੰਮ ਦੇ 14 ਕਦਮ

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  8. Glazing

    SWMS · ਕੰਮ ਦੇ 15 ਕਦਮ

    A glazing SWMS covering cutting, drilling, grinding and installing glass balustrades, windows, doors, shower screens and mirrors.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  9. Height Access Equipment

    SWMS · ਕੰਮ ਦੇ 17 ਕਦਮ

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  10. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · ਕੰਮ ਦੇ 12 ਕਦਮ

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  11. Internal External Lock-Up Fix Stage Carpentry

    SWMS · ਕੰਮ ਦੇ 15 ਕਦਮ

    Covers internal and external lock-up and fix stage carpentry, with the risks and controls for each job step from site arrival to emergency response.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  12. Suspended Grid System Ceiling Installation

    SWMS · ਕੰਮ ਦੇ 12 ਕਦਮ

    Suspended grid system ceiling installation SWMS: 12 job steps covering ladders and trestles, silica dust, falling objects, mobile plant and emergencies.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  13. Partitioning Steel-Stud-Track

    SWMS · ਕੰਮ ਦੇ 12 ਕਦਮ

    Covers installing steel, stud and track partitioning in commercial premises, with the risks and controls for each job step from silica training to emergency response.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  14. Site Establishment Shop Fit-out

    SWMS · ਕੰਮ ਦੇ 10 ਕਦਮ

    Site Establishment Shop Fit-out SWMS: 10 job steps from planning and arrival to powered tools, completion and emergency response.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  15. Powered Non-powered Tools

    SWMS · ਕੰਮ ਦੇ 12 ਕਦਮ

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  16. Soft Demolition

    SWMS · ਕੰਮ ਦੇ 20 ਕਦਮ

    SWMS for soft demolition and strip-out: asbestos, silica dust, glass removal, working at height, tools, waste and emergency response.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  17. Hand Tools

    SOP · 9 ਭਾਗ

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  18. Nail Gun - Pneumatic -

    SOP · 8 ਭਾਗ

    Safe operating procedure for a pneumatic nail gun: hazards, PPE, training, inspection, maintenance, operation, jammed nails and a hazard checklist.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  19. Reciprocating Saw

    SOP · 9 ਭਾਗ

    Safe operating procedure for a reciprocating saw: hazards, PPE, training, pre-operational inspection, maintenance, operation, first aid and a hazard checklist.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  20. Battery Charging and Handling

    SOP · 7 ਭਾਗ

    Safe operating procedure for charging and handling batteries: hazards, emergency response to acid splashes, PPE, precautions, recharging area and battery movement.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  21. Table Saw

    SOP · 9 ਭਾਗ

    Safe operating procedure for a table saw: hazards, PPE, precautions, pre-operational inspection, operation, kickback prevention and a hazard checklist.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  22. Working with Guarded Machinery

    SOP · 12 ਭਾਗ

    Safe operating procedure for working with or near guarded machinery: hazards, PPE, maintenance and LOTO, cleaning, reporting and a hazard checklist.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  23. Trestle Scaffold

    SOP · 7 ਭਾਗ

    Safe operating procedure for trestle scaffolds: hazards, PPE, training, pre-operational inspection, step-by-step operation and a training register.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  24. Nail Gun - Battery Operated -

    SOP · 8 ਭਾਗ

    Safe operating procedure for a battery-operated nail gun: hazards, PPE, battery charging, operation, jammed nails and a training register.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  25. Docking Saw

    SOP · 10 ਭਾਗ

    Safe operating procedure for a docking saw: hazards, PPE, pre-operational inspection, maintenance, step-by-step operation and a hazard checklist.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  26. Mitre/Drop Saw

    SOP · 8 ਭਾਗ

    Safe operating procedure for a mitre or drop saw: hazards, PPE, precautions, inspection, maintenance, operation, blade replacement and a hazard checklist.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  27. V Cut Mitre Saw

    SOP · 10 ਭਾਗ

    Safe operating procedure for a V cut mitre saw: hazards, PPE, training, inspection, blade replacement, operation, maintenance and a hazard checklist.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  28. Angle Grinder

    SOP · 9 ਭਾਗ

    Safe operating procedure for an angle grinder: hazards, PPE, inspection, precautions, operation, changing discs, maintenance and a hazard checklist.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  29. Mobile Scaffolding

    SOP · 8 ਭਾਗ

    Safe operating procedure for mobile scaffolding: hazards, PPE, inspection, erecting, moving and dismantling, and a working at height checklist.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  30. Handheld Drill

    SOP · 9 ਭਾਗ

    Safe operating procedure for a handheld drill: hazards, PPE, precautions, pre-operational inspection, operation, maintenance and a hazard checklist.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  31. Scissor Lift

    SOP · 10 ਭਾਗ

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  32. Platform Ladder

    SOP · 7 ਭਾਗ

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  33. Electric Air Compressor

    SOP · 9 ਭਾਗ

    Safe operating procedure for an electric air compressor: hazards, PPE, inspection, operation, cleaning and a hazard checklist.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  34. Handheld Circular Saw

    SOP · 8 ਭਾਗ

    Safe operating procedure for a handheld circular saw: hazards, PPE, precautions, inspection, operation, kickback and a hazard checklist.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  35. Manual Handling

    SOP · 5 ਭਾਗ

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  36. Handheld Router

    SOP · 9 ਭਾਗ

    Safe operating procedure for a handheld router: hazards, PPE, training, inspection, maintenance, operating steps and a hazard checklist.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  37. Jigsaw

    SOP · 9 ਭਾਗ

    Safe operating procedure for a jigsaw: hazards, PPE, training, pre-operational inspection, operation, blade replacement, maintenance and a hazard checklist.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  38. Pneumatic Tools

    SOP · 8 ਭਾਗ

    Safe operating procedure for pneumatic tools: hazards, PPE, precautions, maintenance, pre-operational inspection, operation and a hazard checklist.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ

ਇਸ ਵਿੱਚ ਕੀ ਹੈ

ਇਸ ਵਿੱਚ ਸ਼ਾਮਲ ਖ਼ਤਰੇ

ਕਾਨੂੰਨ ਅਤੇ ਮਿਆਰ ਜਿਨ੍ਹਾਂ ਦਾ ਇਸ ਵਿੱਚ ਹਵਾਲਾ ਹੈ

ਹਰ SWMS ਨਾਲ ਸਾਡੀ ਕਾਨੂੰਨਾਂ ਅਤੇ ਅਭਿਆਸ ਕੋਡਾਂ (codes of practice) ਦੀ ਹਵਾਲਾ ਸੂਚੀ ਆਉਂਦੀ ਹੈ।

ਤੁਹਾਡੀ ਬੱਚਤ

ਟੈਂਪਲੇਟਕੰਮ ਦੇ ਕਦਮਇਕੱਲਾ
Construction OHS/WHS Project Management Plan0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Tiling14$89.95 · 1 ਕ੍ਰੈਡਿਟ
Painting and Decorating15$89.95 · 1 ਕ੍ਰੈਡਿਟ
Cabinet Installation12$89.95 · 1 ਕ੍ਰੈਡਿਟ
Manual Handling18$89.95 · 1 ਕ੍ਰੈਡਿਟ
Plasterboard16$89.95 · 1 ਕ੍ਰੈਡਿਟ
Silica Dust14$89.95 · 1 ਕ੍ਰੈਡਿਟ
Glazing15$89.95 · 1 ਕ੍ਰੈਡਿਟ
Height Access Equipment17$89.95 · 1 ਕ੍ਰੈਡਿਟ
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 ਕ੍ਰੈਡਿਟ
Internal External Lock-Up Fix Stage Carpentry15$89.95 · 1 ਕ੍ਰੈਡਿਟ
Suspended Grid System Ceiling Installation12$89.95 · 1 ਕ੍ਰੈਡਿਟ
Partitioning Steel-Stud-Track12$89.95 · 1 ਕ੍ਰੈਡਿਟ
Site Establishment Shop Fit-out10$89.95 · 1 ਕ੍ਰੈਡਿਟ
Powered Non-powered Tools12$89.95 · 1 ਕ੍ਰੈਡਿਟ
Soft Demolition20$89.95 · 1 ਕ੍ਰੈਡਿਟ
Hand Tools0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Nail Gun - Pneumatic -0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Reciprocating Saw0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Battery Charging and Handling0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Table Saw0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Working with Guarded Machinery0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Trestle Scaffold0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Nail Gun - Battery Operated -0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Docking Saw0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Mitre/Drop Saw0$89.95 · 1 ਕ੍ਰੈਡਿਟ
V Cut Mitre Saw0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Angle Grinder0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Mobile Scaffolding0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Handheld Drill0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Scissor Lift0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Platform Ladder0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Electric Air Compressor0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Handheld Circular Saw0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Manual Handling0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Handheld Router0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Jigsaw0$89.95 · 1 ਕ੍ਰੈਡਿਟ
Pneumatic Tools0$89.95 · 1 ਕ੍ਰੈਡਿਟ
ਇੱਕ-ਇੱਕ ਕਰਕੇ ਖ਼ਰੀਦੇ$3,418.10 · 38 ਕ੍ਰੈਡਿਟ
ਇਸ ਪੈਕ ਵਿੱਚ$2,428.65 · 27 ਕ੍ਰੈਡਿਟ ਤੁਸੀਂ $989.45 ਬਚਾਉਂਦੇ ਹੋ

ਸਮੀਖਿਆਵਾਂ

ਅਜੇ ਕੋਈ ਸਮੀਖਿਆ ਨਹੀਂ।

ਟੈਂਪਲੇਟ ਕਿਵੇਂ ਕੰਮ ਕਰਦੇ ਹਨ

ਭੁਗਤਾਨ ਕਰਨ ਤੋਂ ਪਹਿਲਾਂ ਅਜ਼ਮਾਓ।

  1. ਮੁਫ਼ਤ ਝਲਕ

    ਹਰ ਟੈਂਪਲੇਟ ਦੇ ਕੰਮ ਦੇ ਕਦਮ, ਖ਼ਤਰੇ ਅਤੇ ਪਹਿਲਾ ਕੰਮ ਪੜ੍ਹਨ ਲਈ ਖੁੱਲ੍ਹੇ ਹਨ। ਸਾਈਨ ਅੱਪ ਦੀ ਲੋੜ ਨਹੀਂ।

  2. ਐਡੀਟਰ ਅਜ਼ਮਾਓ

    ਕੰਪਿਊਟਰ ਜਾਂ ਆਪਣੇ ਫ਼ੋਨ 'ਤੇ, ਇੱਕ ਡੈਮੋ SWMS ਨੂੰ ਆਪਣੀ ਕੰਪਨੀ, ਜੌਬ ਅਤੇ ਸਾਈਟ ਮੁਤਾਬਕ ਢਾਲੋ।

  3. ਮੁਫ਼ਤ ਸਾਈਨ ਅੱਪ ਕਰੋ

    ਤੁਹਾਡੇ ਵੇਰਵੇ ਅਤੇ ਲੋਗੋ ਨਾਲ ਆ ਜਾਂਦੇ ਹਨ। ਇਹ ਟੈਂਪਲੇਟ ਪਹਿਲਾਂ ਤੋਂ ਭਰਿਆ ਹੋਇਆ ਖੁੱਲ੍ਹਦਾ ਹੈ।

  4. ਕ੍ਰੈਡਿਟ ਵਰਤੋ ਜਾਂ ਇੱਕ ਵਾਰ ਖ਼ਰੀਦੋ

    ਪੇਡ ਪਲਾਨਾਂ ਵਿੱਚ ਹਰ ਮਹੀਨੇ ਟੈਂਪਲੇਟ ਕ੍ਰੈਡਿਟ ਸ਼ਾਮਲ ਹਨ। ਜਾਂ ਰੱਖਣ ਲਈ ਇਹ ਟੈਂਪਲੇਟ ਖ਼ਰੀਦੋ।