Pipeline Disinfecting

SWMS · SWMS-10501

  • 12 bước công việc
  • Phiên bản 3

This Pipeline Disinfecting Safe Work Method Statement (SWMS) covers hazards and controls associated with disinfecting pipelines that will carry potable water.

It covers 12 job steps, from chlorine training, chemical storage and transport, weather checks, arrival on site and work area set-up, through environment, housekeeping and manual tasks, to water quality testing and injecting the mains, fuelling on-site, completion and emergency response.

It suits businesses and contractors involved in pipeline disinfection, particularly those dealing with potable water systems, and the safety officers and site supervisors overseeing high-risk construction work.

Xem trang riêng

Xem trước SWMS Pipeline Disinfecting

Pipeline Disinfecting

SWMSVersion 3
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site Management Plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-Risk Construction Work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and Preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold Points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/Review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-Specific Notes

Act, Regulations, Codes of Practice References

None listed.

Personal Protective Equipment (PPE)

  • Foot Protection
  • High Visibility
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Breathing Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job Tasks, Hazards and Control Measures

  • Work activity

    Training

    • Hazard

      Exposure to chlorine

      Before controls3 High
      Controls
      • Determine State & Local Authority requirements for notifications, licensing, storage, disposal of hazardous chlorine/substances

        Include:

        • How to read and interpret SDS

        • How to read and interpret labels

        • Specific information about chlorine

        • How to do a chemical risk assessment

        • Correct storage of chlorine

        • Chlorine incompatibilities

        • Disposal methods

        • Spills clean up.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

Thêm 11 bước công việc, từ Chemical storage & transporting đến Emergency response

Mỗi bước đều có mối nguy, mức rủi ro và biện pháp kiểm soát, cùng phần ký nhận của đội.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy gói tiết kiệm này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Mọi tài liệu sẽ vào Thư viện của bạn, trong một thư mục mang tên gói.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Gói này cần 21 lượt thay vì 32 lượt.

    So sánh các gói và giá
  • Mua một lần

    $1,888.95 $2,878.40 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Nội dung bao gồm

12 bước công việc

  1. TrainingTrain workers in chlorine handling, storage and spill management
  2. Chemical storage & transportingStore and transport chemicals with ventilation and no ignition sources
  3. Check weather conditions & prepareCheck the weather and reschedule if conditions are extreme
  4. Arrival on-site & assess onsite conditionsCheck the site and conditions on arrival and set up safely
  5. Work area set-upSet up an exclusion zone to stop unauthorised access
  6. EnvironmentMinimise environmental impact and manage waste
  7. House keepingKeep the work area clean and clear of trip hazards
  8. Manual tasksAvoid musculoskeletal injuries when lifting and handling
  9. Water quality testing & injecting the mainsTest the water and inject the chlorine mix into the main
  10. Fuelling on-siteRefuel on site and avoid fire and fuel exposure
  11. On completionClean up the site and secure the area
  12. Emergency responseRespond to injuries and environmental damage in an emergency

Các mối nguy được đề cập

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.