Ưu đãi truy cập sớm:Truy cập sớm: giảm 30%, chừng nào bạn vẫn còn đăng ký.

Nhận ưu đãi

Các tài liệu mẫu được soạn bằng tiếng Anh.

Gói tiết kiệm · 32 mẫu

Civil Water and Sewerage Systems

Gói tiết kiệm · PACK-50318

Xem trước mẫu Gói tiết kiệm Civil Water and Sewerage Systems
  • 32 mẫu
  • 32 mẫu với giá của 21 mẫu
  • Được đưa vào một thư mục trong Thư viện

A set of 32 SWMS for civil contractors building water and sewerage systems: trench excavation, pipeline disinfecting, borehole drilling, drainage, soil testing and culvert and tank installation.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost 21 template credits instead of 32.

Xem trước SWMS Soil Testing

Soil Testing

SWMSVersion 1
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following 'High-Risk Construction Work' (HRCW – identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Traffic CorridorsWork carried out adjacent to a road, railway or shipping lane, traffic corridor

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. Specify?

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Remote area emergency

      Before controls4 Acute
      Controls
      • Prepare a Remote / Isolated Work Plan. A signed copy must be taken by workers to the Remote/Isolated workplace each day, and the responsible supervisor must keep a copy at home base or head office

      • All relevant workers scheduled to work in the remote area are supplied with Personal Location Beacons (PLB)

      • All vehicles used to transport crew to remote locations are carrying Emergency Position Indicating Radio Beacon (EPIRB) onboard vehicle:

        • Cabin roof is marked with a specific identification number (for aerial identification.)

      • Complete a Departure Checklist (refer to Remote / Isolated Work Plan).

      After controls2 Moderate
      Responsible
      • The Organisationwill ensure 'Remote and Isolated Plan' is in place & check the site amenities are in place

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

Thêm 10 bước công việc, từ Travel to/from remote worksite đến Emergency response

Mỗi bước đều có mối nguy, mức rủi ro và biện pháp kiểm soát, cùng phần ký nhận của đội.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy gói tiết kiệm này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Mọi tài liệu sẽ vào Thư viện của bạn, trong một thư mục mang tên gói.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Gói này cần 21 lượt thay vì 32 lượt.

    So sánh các gói và giá
  • Mua một lần

    $1,888.95 $2,878.40 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Gói gồm những gì

  1. Soil Testing

    SWMS · 11 bước công việc

    Soil Testing SWMS: 11 job steps from remote travel and set-up to soil testing, mobile plant, completion and emergency response.

    Cũng bán riêng
  2. Pipeline Disinfecting

    SWMS · 12 bước công việc

    SWMS for disinfecting pipelines that carry potable water: chlorine handling, water testing, injecting the mains, refuelling, environment and emergencies.

    Cũng bán riêng
  3. Vehicle Mounted Borehole Drilling

    SWMS · 14 bước công việc

    Vehicle Mounted Borehole Drilling SWMS: 14 job steps covering travel, work area set-up, drilling, maintenance, fuelling and emergencies.

    Cũng bán riêng
  4. Mobile Plant Working Near-Around

    SWMS · 8 bước công việc

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    Cũng bán riêng
  5. Spotter

    SWMS · 11 bước công việc

    SWMS for spotters and safety observers: traffic and mobile plant, work near overhead and underground assets, scaffolding and EWPs, roll-over and first aid.

    Cũng bán riêng
  6. Bulk Excavations

    SWMS · 13 bước công việc

    SWMS for bulk excavation work: planning, plant operation, shoring, water-charged ground, silica dust, re-fuelling, environmental controls and emergencies.

    Cũng bán riêng
  7. Trench Excavation

    SWMS · 15 bước công việc

    Trench Excavation SWMS: 15 job steps covering excavating and working in trenches over 1.5 m deep, from planning to emergency response.

    Cũng bán riêng
  8. Plumbing Drainage

    SWMS · 18 bước công việc

    Plumbing drainage SWMS for installing pipes, stormwater tanks and polyethylene pipe welding, and for sewage and stormwater drainage on civil works.

    Cũng bán riêng
  9. Mobile Crane

    SWMS · 16 bước công việc

    Mobile Crane SWMS: 16 job steps covering power lines, set-up, load equipment checks, lifting, maintenance, refuelling and emergencies.

    Cũng bán riêng
  10. Traffic Corridor - Establishing a Safe Work Zone

    SWMS · 8 bước công việc

    Traffic corridor SWMS: 8 job steps covering the traffic management plan, safe work zone set-up, traffic controllers, pedestrians and zone takeouts.

    Cũng bán riêng
  11. Tipper and Dog

    SWMS · 16 bước công việc

    Hazards and controls for operating a tip truck and dog trailer, including side tippers, from coupling trailers to tipping, refuelling and emergency response.

    Cũng bán riêng
  12. Culvert-Tank Installation

    SWMS · 12 bước công việc

    Culvert-Tank Installation SWMS: 12 job steps for installing culverts, tanks and similar structures, from planning to emergency response.

    Cũng bán riêng
  13. Confined Space Work

    SWMS · 10 bước công việc

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    Cũng bán riêng
  14. Lasers

    SWMS · 9 bước công việc

    Lasers SWMS: 9 job steps covering Class 1, 2 and 3R construction lasers, beam set-up, eye injury, mobile plant, roadside work and emergencies.

    Cũng bán riêng
  15. Sediment Fencing

    SWMS · 18 bước công việc

    SWMS for installing sediment and safety fencing: machine set-up, wire straining, nail and staple guns, refuelling and emergency response.

    Cũng bán riêng
  16. Guided Boring Pipe Jacking Works

    SWMS · 17 bước công việc

    A SWMS for guided boring and pipe jacking works: the hazards and controls for excavating launch and retrieval pits, hoisting and running the machine.

    Cũng bán riêng
  17. Silica Dust

    SWMS · 14 bước công việc

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    Cũng bán riêng
  18. Construction Night Works

    SWMS · 4 bước công việc

    SWMS for general construction work at night: planning, work area set-up, night works and emergency response, with lighting, plant and fatigue controls.

    Cũng bán riêng
  19. Overhead Electric Lines - Working Near

    SWMS · 6 bước công việc

    Overhead Electric Lines SWMS: 6 job steps covering exclusion zones, spotters, mobile plant near powerlines and emergency response.

    Cũng bán riêng
  20. Earthmoving Equipment

    SWMS · 23 bước công việc

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    Cũng bán riêng
  21. Nuclear Densometer

    SWMS · 12 bước công việc

    Nuclear Densometer SWMS: 12 job steps covering storage, transport, radiation exposure, mobile plant, trenches and emergencies.

    Cũng bán riêng
  22. Dogman

    SWMS · 12 bước công việc

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    Cũng bán riêng
  23. Electric Fusion - Poly Pipe Butt Welding (PPW)

    SWMS · 11 bước công việc

    Electric fusion poly pipe butt welding SWMS: 11 job steps covering mobile plant, hazardous atmospheres, hot plate and facer use, and emergencies.

    Cũng bán riêng
  24. Manual Handling

    SWMS · 18 bước công việc

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    Cũng bán riêng
  25. Horizontal Directional Boring

    SWMS · 16 bước công việc

    SWMS for horizontal directional boring: locating underground services, drilling, service strikes, rig maintenance, refuelling and emergencies.

    Cũng bán riêng
  26. Excavation Near Assets

    SWMS · 13 bước công việc

    SWMS for excavating near underground services and assets: site planning, survey, work area set-up, contact with utilities and emergency response.

    Cũng bán riêng
  27. Plumbing - Water Meter Installation

    SWMS · 16 bước công việc

    Plumbing SWMS for installing water meters: 16 job steps from site assessment and electrical hazards to excavation, confined space and emergency response.

    Cũng bán riêng
  28. Geofabric Installation

    SWMS · 17 bước công việc

    Geofabric Installation SWMS: 17 job steps covering delivery, crane placement, rolling out, seaming and securing geomembrane on dams and landfills.

    Cũng bán riêng
  29. Light Vehicle on Construction

    SWMS · 16 bước công việc

    Light Vehicle on Construction SWMS: 16 job steps covering travel, loading, fuelling, breakdowns, accidents, mobile plant and emergencies.

    Cũng bán riêng
  30. Soil Compactor

    SWMS · 19 bước công việc

    SWMS for soil compactor work: weather, site set-up, overhead lines, slopes, silica dust, refuelling, ground workers and emergency response.

    Cũng bán riêng
  31. Site Establishment

    SWMS · 11 bước công việc

    Site Establishment SWMS: 11 job steps from planning and traffic management to tools, site set-up, working at height and emergency response.

    Cũng bán riêng
  32. Remote Control Trench Roller

    SWMS · 15 bước công việc

    SWMS for operating a remote control trench roller: transport, set-up, trench work, mobile plant, hydraulics, environment and emergencies.

    Cũng bán riêng

Nội dung bao gồm

Các mối nguy được đề cập

Luật và tiêu chuẩn được dẫn chiếu

Mỗi SWMS đều đi kèm danh sách tham chiếu luật và bộ quy tắc thực hành (codes of practice) của chúng tôi.

Bạn tiết kiệm được gì

MẫuBước công việcMua riêng
Soil Testing11$89.95 · 1 lượt mở mẫu
Pipeline Disinfecting12$89.95 · 1 lượt mở mẫu
Vehicle Mounted Borehole Drilling14$89.95 · 1 lượt mở mẫu
Mobile Plant Working Near-Around8$89.95 · 1 lượt mở mẫu
Spotter11$89.95 · 1 lượt mở mẫu
Bulk Excavations13$89.95 · 1 lượt mở mẫu
Trench Excavation15$89.95 · 1 lượt mở mẫu
Plumbing Drainage18$89.95 · 1 lượt mở mẫu
Mobile Crane16$89.95 · 1 lượt mở mẫu
Traffic Corridor - Establishing a Safe Work Zone8$89.95 · 1 lượt mở mẫu
Tipper and Dog16$89.95 · 1 lượt mở mẫu
Culvert-Tank Installation12$89.95 · 1 lượt mở mẫu
Confined Space Work10$89.95 · 1 lượt mở mẫu
Lasers9$89.95 · 1 lượt mở mẫu
Sediment Fencing18$89.95 · 1 lượt mở mẫu
Guided Boring Pipe Jacking Works17$89.95 · 1 lượt mở mẫu
Silica Dust14$89.95 · 1 lượt mở mẫu
Construction Night Works4$89.95 · 1 lượt mở mẫu
Overhead Electric Lines - Working Near6$89.95 · 1 lượt mở mẫu
Earthmoving Equipment23$89.95 · 1 lượt mở mẫu
Nuclear Densometer12$89.95 · 1 lượt mở mẫu
Dogman12$89.95 · 1 lượt mở mẫu
Electric Fusion - Poly Pipe Butt Welding (PPW)11$89.95 · 1 lượt mở mẫu
Manual Handling18$89.95 · 1 lượt mở mẫu
Horizontal Directional Boring16$89.95 · 1 lượt mở mẫu
Excavation Near Assets13$89.95 · 1 lượt mở mẫu
Plumbing - Water Meter Installation16$89.95 · 1 lượt mở mẫu
Geofabric Installation17$89.95 · 1 lượt mở mẫu
Light Vehicle on Construction16$89.95 · 1 lượt mở mẫu
Soil Compactor19$89.95 · 1 lượt mở mẫu
Site Establishment11$89.95 · 1 lượt mở mẫu
Remote Control Trench Roller15$89.95 · 1 lượt mở mẫu
Mua từng mẫu$2,878.40 · 32 lượt mở mẫu
Trong gói này$1,888.95 · 21 lượt mở mẫu Bạn tiết kiệm $989.45

Đánh giá

Chưa có đánh giá nào.

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.