Construction Site Amenities Cleaning

SWMS · SWMS-10609

  • 10 bước công việc
  • Phiên bản 5

This Construction Site Amenities Cleaning Safe Work Method Statement (SWMS) covers the hazards and controls for cleaning tasks at construction site amenities, to help keep the work safe and efficient.

It covers 10 job steps, from planning and arriving on site to travel on-site, work area set-up, the environment, housekeeping, manual tasks, sweeping, mopping and surface cleaning, completion and emergency response.

It includes controls for manual tasks, contaminated materials and sharps, hazardous chemicals, and work from platform ladders.

It suits cleaning service providers, property management firms, construction and renovation contractors and facility management services.

Xem trang riêng

Xem trước SWMS Construction Site Amenities Cleaning

Construction Site Amenities Cleaning

SWMSVersion 5
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile Plant
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/Review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Act, regulations, codes of practice references

None listed.

Personal Protective Equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Breathing Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Fatigue

      Unauthorised access

      Insecure workplace

      Before controls3 High
      Controls
      • Out-of-hours / night work:

        • Allow adequate meal breaks for workers; especially if they have worked during part of the day, they will need time to rest & recover sufficiently to work safely into the evening/night

        • Do not schedule full double shifts for workers as worker fatigue increases the risk of incidents

        • Workers have access to:

          • Suitable amenities (toilets/wash facilities/drinking water)

          • Sufficient lighting (including parking areas)

          • Air conditioning, heating and mechanical ventilation if required

          • Emergency exits

          • Safe area for parking/unloading equipment – protected from rain

      • Additional security personnel on-site to ensure no unauthorised access by the general public while work is being performed

        • No worker should work alone on the site at night.

      After controls2 Moderate
      Responsible
      • Supervisorto ensure all planning and scheduling is followed
    • Hazard

      Infection Disease Allergic reaction

      Before controls3 High
      Controls
      • Ensure vaccinations (such as Hepatitis B, tetanus.) are offered for staff.

      • people with known allergic responses should consult a doctor and ensure appropriate kit is available at all times (Including EpiPen - in date).

      After controls2 Moderate
      Responsible
      • Supervisorto ensure all planning and scheduling is followed
    • Hazard

      Emergency

      Before controls4 Acute
      Controls
      • Avoid people working alone, use a buddy system to provide immediate support

      • Have a reliable communication system in place and test regularly

        • Emergency procedures:

          • Emergency contacts (enter numbers here)

          • Building security (enter numbers here)

          • Nearest medical facility (enter the address here)

          • Location of fire protection equipment

          • Emergency exits and assembly areas.

      After controls2 Moderate
      Responsible
      • Supervisorto ensure all planning and scheduling is followed

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

Thêm 9 bước công việc, từ Arrival on-site & assess onsite conditions đến Emergency response

Mỗi bước đều có mối nguy, mức rủi ro và biện pháp kiểm soát, cùng phần ký nhận của đội.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy hệ thống này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Mọi tài liệu sẽ vào Thư viện của bạn, trong một thư mục mang tên gói.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Mẫu này cần 20 lượt.

    So sánh các gói và giá
  • Mua một lần

    $999.90 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Nội dung bao gồm

10 bước công việc

  1. PlanningPlan shifts, amenities, security and emergency arrangements for out-of-hours work
  2. Arrival on-site & assess onsite conditionsAssess the site conditions on arrival to identify hazards
  3. Travel on-siteTravel on-site safely around vehicles, mobile plant and pedestrians
  4. Work area set-upSet up the work area and keep unauthorised people out
  5. EnvironmentControl the environmental impact of cleaning activities
  6. HousekeepingKeep the work area tidy and free of slip and trip hazards
  7. Manual tasksReduce the risks of manual tasks
  8. Sweeping, mopping & surface cleaningSweep, mop and clean surfaces, handling contaminated materials and chemicals safely
  9. On completionConclude the work and secure the site
  10. Emergency responseRespond to emergencies

Các mối nguy được đề cập

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.