Ưu đãi truy cập sớm:Truy cập sớm: giảm 30%, chừng nào bạn vẫn còn đăng ký.

Nhận ưu đãi

Các tài liệu mẫu được soạn bằng tiếng Anh.

Dùng thử trình soạn thảo miễn phí
Gói tiết kiệm · 20 mẫu

Concrete Tilt-up Construction Combo

Gói tiết kiệm · PACK-50337

Xem trước mẫu Gói tiết kiệm Concrete Tilt-up Construction Combo
  • 20 mẫu
  • 20 mẫu với giá của 15 mẫu
  • Được đưa vào một thư mục trong Thư viện

A set of 15 SWMS and five SOPs for tilt-up and precast panel contractors.

The SWMS cover tilt-up panels, panel lifting, concrete placement, foundations, dogging and spotters. The SOPs include Dogman, Handheld Power Tools and Manual Handling.

Each document is the same one sold on its own, so you get every update to it. Together they cost 15 template credits instead of 20.

Xem trước SWMS Pre-cast Tilt-up Panels

Pre-cast Tilt-up Panels

SWMSVersion 8
Company doing the work
[Company]
Business contact
—
Phone #
—
Responsible person (for monitoring SWMS and work)
—
Signature
—
Date
—
Contact phone #
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone #
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Is the work associated with a construction project?
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile Plant

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/Review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Provide training on the health effects associated with RCS

    • Hazard

      Exposure to silica dust

      Before controls4 Acute
      Controls
      • Training and information provided to workers on RCS should include:

        • Identification of RCS dust through Safety Datasheet (SDS) or labels

        • Dust exposure prevention strategies

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes).

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

Thêm 18 bước công việc, từ Temporary casting bed-design đến Emergency response

Mỗi bước đều có mối nguy, mức rủi ro và biện pháp kiểm soát, cùng phần ký nhận của đội.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy gói tiết kiệm này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Mọi tài liệu sẽ vào Thư viện của bạn, trong một thư mục mang tên gói.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Gói này cần 15 lượt thay vì 20 lượt.

    So sánh các gói và giá
  • Mua một lần

    $1,349.25 $1,799.00 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Gói gồm những gì

  1. Pre-cast Tilt-up Panels

    SWMS · 19 bước công việc

    Pre-cast Tilt-up Panels SWMS: nineteen job steps covering casting beds, formwork, steel reinforcement, concrete placing, stripping and emergency response.

    Cũng bán riêng
  2. Mobile Plant Working Near-Around

    SWMS · 8 bước công việc

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    Cũng bán riêng
  3. Handheld Power Tools

    SOP · 9 phần

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    Cũng bán riêng
  4. Dogman

    SOP · 8 phần

    Safe operating procedure for dogmen: hazards, PPE, responsibilities, pre-operational inspections, rigging, lifting and landing loads.

    Cũng bán riêng
  5. Spotter

    SWMS · 11 bước công việc

    SWMS for spotters and safety observers: traffic and mobile plant, work near overhead and underground assets, scaffolding and EWPs, roll-over and first aid.

    Cũng bán riêng
  6. Concrete Placement and Finishing

    SWMS · 13 bước công việc

    SWMS for concrete placement and finishing: delivery, pumping and pouring, power lines, mobile plant, cement burns, trowelling machines and emergencies.

    Cũng bán riêng
  7. Concrete Boom or Line Pumping

    SWMS · 15 bước công việc

    SWMS for truck-mounted concrete boom and line pumping: road travel, pump set-up, the pour, clearing line blockages, line cleaning and emergencies.

    Cũng bán riêng
  8. Manual Handling

    SOP · 5 phần

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    Cũng bán riêng
  9. Concrete Foundations Excavating - Pouring

    SWMS · 17 bước công việc

    SWMS for excavating, steel setting and pouring concrete foundations: 17 job steps from site set-up and plant delivery to the pour and emergencies.

    Cũng bán riêng
  10. Silica Dust

    SWMS · 14 bước công việc

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    Cũng bán riêng
  11. Platform Ladder

    SOP · 7 phần

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    Cũng bán riêng
  12. Hand Tools

    SOP · 9 phần

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    Cũng bán riêng
  13. Dogman

    SWMS · 12 bước công việc

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    Cũng bán riêng
  14. Tilt-up Panel Lifting

    SWMS · 18 bước công việc

    Tilt-up Panel Lifting SWMS: 18 job steps covering the lifting and bracing of tilt-up and precast concrete panels, from site set-up to emergency response.

    Cũng bán riêng
  15. Powered Non-powered Tools

    SWMS · 12 bước công việc

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    Cũng bán riêng
  16. Caulking Grouting Patching

    SWMS · 12 bước công việc

    SWMS for caulking, grouting and patching concrete panels, block and brick work, paving tiles and other building components.

    Cũng bán riêng
  17. Manual Handling

    SWMS · 18 bước công việc

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    Cũng bán riêng
  18. Concrete Sawing and Core Drilling

    SWMS · 13 bước công việc

    SWMS for using a hand-held, electric or petrol/diesel-powered concrete saw and core drill, with silica dust, fuel and electrical controls.

    Cũng bán riêng
  19. Air Compressor

    SWMS · 9 bước công việc

    SWMS for portable air compressor work: transport, set-up, operation, fuel and electrical hazards, noise, housekeeping, shut-down and emergencies.

    Cũng bán riêng
  20. Concrete Slab on Ground

    SWMS · 17 bước công việc

    Safe work method statement for concrete slab on ground work, covering formwork, fill and steel reinforcement placement, with the hazards and controls for each job step.

    Cũng bán riêng

Nội dung bao gồm

Các mối nguy được đề cập

Luật và tiêu chuẩn được dẫn chiếu

Mỗi SWMS đều đi kèm danh sách tham chiếu luật và bộ quy tắc thực hành (codes of practice) của chúng tôi.

Bạn tiết kiệm được gì

MẫuBước công việcMua riêng
Pre-cast Tilt-up Panels19$89.95 · 1 lượt mở mẫu
Mobile Plant Working Near-Around8$89.95 · 1 lượt mở mẫu
Handheld Power Tools0$89.95 · 1 lượt mở mẫu
Dogman0$89.95 · 1 lượt mở mẫu
Spotter11$89.95 · 1 lượt mở mẫu
Concrete Placement and Finishing13$89.95 · 1 lượt mở mẫu
Concrete Boom or Line Pumping15$89.95 · 1 lượt mở mẫu
Manual Handling0$89.95 · 1 lượt mở mẫu
Concrete Foundations Excavating - Pouring17$89.95 · 1 lượt mở mẫu
Silica Dust14$89.95 · 1 lượt mở mẫu
Platform Ladder0$89.95 · 1 lượt mở mẫu
Hand Tools0$89.95 · 1 lượt mở mẫu
Dogman12$89.95 · 1 lượt mở mẫu
Tilt-up Panel Lifting18$89.95 · 1 lượt mở mẫu
Powered Non-powered Tools12$89.95 · 1 lượt mở mẫu
Caulking Grouting Patching12$89.95 · 1 lượt mở mẫu
Manual Handling18$89.95 · 1 lượt mở mẫu
Concrete Sawing and Core Drilling13$89.95 · 1 lượt mở mẫu
Air Compressor9$89.95 · 1 lượt mở mẫu
Concrete Slab on Ground17$89.95 · 1 lượt mở mẫu
Mua từng mẫu$1,799.00 · 20 lượt mở mẫu
Trong gói này$1,349.25 · 15 lượt mở mẫu Bạn tiết kiệm $449.75

Đánh giá

Chưa có đánh giá nào.

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.