This SWMS covers the hazards and controls for plumbing gas fitting work: planning to the gas installation standards, excavating and backfilling, bottled gas installation, hot tapping, installing pipework, fitting appliances, purging gas lines, and pressure testing and commissioning.

It takes your crew through 21 job steps, from RCS dust training, confined space checks and weather to housekeeping, manual tasks, tools, hazardous substances, welding and soldering, completion and emergency response. High-risk construction work is marked in the job steps.

It suits plumbing contractors and gas fitters, construction project managers overseeing plumbing and gas fitting work, and the safety officers responsible for it.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

查看单独页面

Plumbing Gas Fitting SWMS 预览

Plumbing Gas Fitting

SWMSVersion 7

Document details

Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Gas MainsPressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/Review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Head Protection
  • Face Protection
  • Breathing Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Provide training on the health effects associated with RCS

    • Hazard

      Exposure to respirable crystalline silica (RCS) – dust inhalation

      Before controls3 High
      Controls
      • Training and information provided to workers on RCS should include:

        • Identification of RCS dust through Safety Datasheet (SDS) or labels

        • Dust exposure prevention strategies

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes).

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 20 个工作步骤,从“Planning”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个体系

免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。

  • 付费套餐包含

    使用套餐中的模板额度。这一份需要 20 个额度。

    比较套餐和价格
  • 单独购买

    $999.90 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

涵盖内容

21 个工作步骤

  1. Provide training on the health effects associated with RCSTrain workers on RCS dust and its controls
  2. PlanningPlan the gas installation to the standards
  3. Identify Confined Space WorkCheck for confined spaces and get an entry permit
  4. Check weather conditions & prepareCheck the weather and prepare for heat or cold
  5. Arrival on-site & assess onsite conditionsCheck the site, gas supply and site rules on arrival
  6. Work area set-upSet up exclusion zones and check for electrical hazards
  7. EnvironmentControl noise, waste, spills and site impact
  8. House keepingKeep the work area clean and clear
  9. Manual tasksLift and move materials safely
  10. Working with powered & non-powered toolsInspect and use tools safely
  11. Hazardous substance/chemical useHandle chemicals as the SDS directs
  12. Excavating, backfillingLocate services and excavate safely around plant
  13. Bottled Gas installationPlace gas bottles away from ignition sources
  14. Hot TappingPlan hot tapping with an emergency plan
  15. Installing pipeworkInstall pipework safely at height and control dust
  16. Electric or gas welding, soldering & cuttingWeld and cut under a hot work permit
  17. Fitting appliances & fixturesConnect appliances safely to power and gas
  18. Purging gas linesPurge gas lines away from ignition sources
  19. Commission & pressure testPressure test and commission the system
  20. On completionLeave the site safe and certified
  21. Emergency responseRespond to emergencies and give first aid

涵盖的危险

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。