超值套装 · 32 个模板属于Civil Water and Sewerage Systems

Sediment Fencing

SWMS · SWMS-10631

  • 18 个工作步骤
  • 版本 5

This Sediment Fencing Safe Work Method Statement (SWMS) covers the hazards and controls associated with the installation of sediment and safety fencing.

It covers 18 job steps, from checking the weather and setting up the work area to delivering and removing the machine, changing attachments and loading the sediment roll, laying the fence, driving pickets and pegs, straining wire, fixing fabric, fuelling the plant and emergency response.

It includes controls for high-risk construction work around mobile plant, and for overhead power lines, environmental impacts, manual tasks, noise and working alone.

It suits businesses and contractors that install sediment fencing, and the site supervisors, safety officers and workers who keep the work safe and meet their legal safety obligations.

查看单独页面

Sediment Fencing SWMS 预览

Sediment Fencing

SWMSVersion 5
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere
  • Traffic CorridorsWork carried out adjacent to a road, railway or shipping lane, traffic corridor

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/Review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection
  • High Visibility
  • Head Protection
  • Sun Protection
  • Seat Belt

Job steps, hazards and controls

  • Work activity

    Check weather conditions & prepare

    • Hazard

      Extreme weather

      Before controls3 High
      Controls
      • Check weather conditions – do not work in extreme conditions

      • Reschedule works to work in more moderate temperatures.

      After controls2 Moderate
      Responsible
      • Supervisorto maintain awareness of weather conditions
      • Operatorto follow controls
    • Hazard

      Hyperthermia; Hypothermia

      Before controls3 High
      Controls
      • Ensure vehicle cabin is air-conditioned

      • Workers trained to recognise the symptoms of hyperthermia and hypothermia

      • Hot conditions. Ensure:

        • Suitable protective clothing

        • Sun brim on hard hats

        • Safety glasses - UV rated

        • Use 30+ sunscreen on exposed skin

        • Adequate drinking water

        • Access to shade on breaks

        • Adequate breaks.

      • Cold conditions. Ensure:

        • Schedule warm-up breaks

        • Hold breaks inside

        • Dress warmly in layers

        • Stay dry (wet clothing chills the body rapidly)

        • Workers must get out of the cold as soon as they can if starting to feel symptoms

        • Alcohol, cigarettes, caffeine and certain medications increase susceptibility to cold.

      After controls2 Moderate
      Responsible
      • Supervisorto maintain awareness of weather conditions
      • Operatorto follow controls

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 17 个工作步骤,从“Working alone”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个超值套装

免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。

  • 付费套餐包含

    使用套餐中的模板额度。本套装只需 21 个额度,而不是 32 个。

    比较套餐和价格
  • 单独购买

    $1,888.95 $2,878.40 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

涵盖内容

18 个工作步骤

  1. Check weather conditions & prepareCheck the weather and prepare for the conditions.
  2. Working aloneTake precautions when working alone.
  3. Arrival on-site & assess onsite conditionsAssess the site conditions on arrival.
  4. Work area set-upSet up a safe work area, especially next to traffic.
  5. EnvironmentControl the environmental impact of the work.
  6. House keepingKeep the work area clean and safe.
  7. Manual tasksManage manual tasks to prevent injury.
  8. Delivery, set-up & removal of the machineDeliver, set up and remove the machine safely, including near power lines.
  9. Establish a communication system with ground workersSet up communication between the operator and ground workers.
  10. Changing attachments & loading sediment rollChange attachments and load the sediment roll safely.
  11. Laying the sediment fenceLay the sediment fence safely.
  12. Pickets and pegsHandle and install pickets and pegs safely.
  13. Running out & straining wireRun out and strain wire safely.
  14. Fixing fabric to a fenceFix the fabric safely with nail or staple guns and knives.
  15. Working near the powered mobile plantWork safely near powered mobile plant.
  16. Fuelling the plantRefuel the plant and prevent fire, explosion and fuel contact.
  17. On completionMake final checks when the work is complete.
  18. Emergency responseRespond to an emergency, including first aid and rescue after a plant roll-over.

涵盖的危险

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。