Construction Site Amenities Cleaning

SWMS · SWMS-10609

Construction Site Amenities Cleaning SWMS模板预览
  • 10 个工作步骤
  • 已售出 85 次
  • 版本 5
  • Cleaning
  • 任何手机都能看

This Construction Site Amenities Cleaning Safe Work Method Statement (SWMS) covers the hazards and controls for cleaning tasks at construction site amenities, to help keep the work safe and efficient.

It covers 10 job steps, from planning and arriving on site to travel on-site, work area set-up, the environment, housekeeping, manual tasks, sweeping, mopping and surface cleaning, completion and emergency response.

It includes controls for manual tasks, contaminated materials and sharps, hazardous chemicals, and work from platform ladders.

It suits cleaning service providers, property management firms, construction and renovation contractors and facility management services.

Construction Site Amenities Cleaning SWMS 预览

Construction Site Amenities Cleaning

SWMSVersion 5
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile Plant
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/Review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Act, regulations, codes of practice references

None listed.

Personal Protective Equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Breathing Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Fatigue

      Unauthorised access

      Insecure workplace

      Before controls3 High
      Controls
      • Out-of-hours / night work:

        • Allow adequate meal breaks for workers; especially if they have worked during part of the day, they will need time to rest & recover sufficiently to work safely into the evening/night

        • Do not schedule full double shifts for workers as worker fatigue increases the risk of incidents

        • Workers have access to:

          • Suitable amenities (toilets/wash facilities/drinking water)

          • Sufficient lighting (including parking areas)

          • Air conditioning, heating and mechanical ventilation if required

          • Emergency exits

          • Safe area for parking/unloading equipment – protected from rain

      • Additional security personnel on-site to ensure no unauthorised access by the general public while work is being performed

        • No worker should work alone on the site at night.

      After controls2 Moderate
      Responsible
      • Supervisorto ensure all planning and scheduling is followed
    • Hazard

      Infection Disease Allergic reaction

      Before controls3 High
      Controls
      • Ensure vaccinations (such as Hepatitis B, tetanus.) are offered for staff.

      • people with known allergic responses should consult a doctor and ensure appropriate kit is available at all times (Including EpiPen - in date).

      After controls2 Moderate
      Responsible
      • Supervisorto ensure all planning and scheduling is followed
    • Hazard

      Emergency

      Before controls4 Acute
      Controls
      • Avoid people working alone, use a buddy system to provide immediate support

      • Have a reliable communication system in place and test regularly

        • Emergency procedures:

          • Emergency contacts (enter numbers here)

          • Building security (enter numbers here)

          • Nearest medical facility (enter the address here)

          • Location of fire protection equipment

          • Emergency exits and assembly areas.

      After controls2 Moderate
      Responsible
      • Supervisorto ensure all planning and scheduling is followed

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 9 个工作步骤,从“Arrival on-site & assess onsite conditions”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个模板

免费注册,然后选择获取方式。你的公司信息会自动填好。

  • 付费套餐包含

    使用套餐中的模板额度。这一份需要 1 个额度。

    比较套餐和价格
  • 单独购买

    $89.95 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

涵盖内容

10 个工作步骤

  1. PlanningPlan shifts, amenities, security and emergency arrangements for out-of-hours work
  2. Arrival on-site & assess onsite conditionsAssess the site conditions on arrival to identify hazards
  3. Travel on-siteTravel on-site safely around vehicles, mobile plant and pedestrians
  4. Work area set-upSet up the work area and keep unauthorised people out
  5. EnvironmentControl the environmental impact of cleaning activities
  6. HousekeepingKeep the work area tidy and free of slip and trip hazards
  7. Manual tasksReduce the risks of manual tasks
  8. Sweeping, mopping & surface cleaningSweep, mop and clean surfaces, handling contaminated materials and chemicals safely
  9. On completionConclude the work and secure the site
  10. Emergency responseRespond to emergencies

涵盖的危险

评价

暂无评价。

查看全部

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。