超值套装 · 35 个模板属于HVAC-Refrigeration Combo

Air Conditioning Installation

SWMS · SWMS-10005

  • 16 个工作步骤
  • 版本 12

This Air Conditioning Installation SWMS covers installing, maintaining or repairing air conditioning components. It addresses the associated risks and outlines the precautions needed to meet safety standards.

It sets out 16 job steps, from planning, arrival on site and work area set-up through manual tasks, tools, materials delivery, installing the indoor and outdoor units, drilling, cutting or grinding masonry, refrigerant piping, electrical wiring and testing, to completion and emergency response.

It includes controls for silica dust, suited to any HVAC system and to indoor and outdoor installations, and has the SWMS sign-off table for workers.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

查看单独页面

Air Conditioning Installation SWMS 预览

Air Conditioning Installation

SWMSVersion 12
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous LinesChemical, fuel or refrigerant lines
  • Energised ElectricalEnergised electrical installations or services
  • FallsInvolves a risk of a person falling from 2m or more, including work on telecommunications towers
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e. no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Breathing Protection
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Planning & preparation

    • Hazard

      Falling objects

      Before controls4 Acute
      Controls
      • Planning access to the height location:

        • Wherever possible, use mechanical methods to deliver materials to the working at height location, e.g. crane.

        • Ensure all crane operators, riggers and doggers are licensed, competent and trained

        • If delivering material/tools onto a raised platform, liaise with Principal to determine where on the platform, the materials are safe to be dropped:

          • Be able to bear the load

          • Not cause hazards to other trade.

      After controls2 Moderate
      Responsible
      • Supervisorto ensure relevant SWMS & to maintain awareness of weather conditions
      • Workersto follow controls
    • Hazard

      Extreme weather

      Before controls3 High
      Controls
      • Check weather conditions – do not work in extreme conditions

      • Reschedule works to work in more moderate temperatures.

      After controls2 Moderate
      Responsible
      • Supervisorto ensure relevant SWMS & to maintain awareness of weather conditions
      • Workersto follow controls

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 15 个工作步骤,从“Arrival on-site & risk assess on-site conditions”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个超值套装

免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。

  • 付费套餐包含

    使用套餐中的模板额度。本套装只需 21 个额度,而不是 35 个。

    比较套餐和价格
  • 单独购买

    $1,888.95 $3,148.25 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

涵盖内容

16 个工作步骤

  1. Planning & preparationPlan material delivery to height and check the weather
  2. Arrival on-site & risk assess on-site conditionsPark safely, report in and check the site conditions
  3. Work area set-upBarricade the work area and the drop zone
  4. EnvironmentControl noise, waste, spills and vehicle movement on site
  5. House keepingKeep the work area clean, clear and well lit
  6. Manual tasksLift safely and use team or mechanical lifts
  7. Working with powered & non-powered toolsUse, inspect and isolate powered and non-powered tools safely
  8. Materials deliveryUnload and stack materials safely around vehicles and the public
  9. Install indoor unit, ducting and drainpipes following manufacturers’ instructionsInstall the indoor unit safely in the roof space and from ladders
  10. Install the outdoor unit following manufacturers’ instructionsInstall the outdoor unit with fall protection
  11. Drilling, cutting or grinding masonryControl silica dust when drilling, cutting or grinding
  12. Refrigerant piping connectionConnect the refrigerant piping and depressurise the lines safely
  13. Electrical wiringIsolate, test and wire with the right tools and PPE
  14. Testing & commissioning following the manufacturer’s instructionsTest and commission with suitable equipment and check the safety devices
  15. On completionBrief the client, clean up silica dust and sign out
  16. Emergency responseCall for help, give first aid and report the incident

涵盖的危险

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。