SWMS · SWMS-10265

  • 12 个工作步骤
  • 版本 8

This SWMS covers the hazards and controls for pest control, including termite, cockroach and ant eradication in new and existing premises. It addresses the use of hazardous chemicals and adds controls for slips, trips and falls, manual tasks and environmental protection.

The SWMS takes your crew through each step, from planning, transporting chemicals, arriving on site and preparing the work area to pesticide application, termite barrier fixing, completion and emergency response.

It suits pest control technicians and contractors, construction and property maintenance teams, and the facility managers responsible for workplace safety.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

查看单独页面

Pest Control SWMS 预览

Pest Control

SWMSVersion 8
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column)

None listed.

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Breathing Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Extreme environmental conditions

      Before controls3 High
      Controls
      • Monitor and observe weather alerts etc.

      • Avoid treating in the following conditions:

        • High winds

        • High temperatures

        • During and after heavy rains

        • Saturated soils

      • Consider rescheduling operations.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Unlicensed operator

      Before controls3 High
      Controls
      • Workers hold current licences for Pest Control tasks as required by the State Regulator. Check with your State/Territory to determine licensing requirements.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Legislative breach

      Before controls3 High
      Controls
      • Use only approved pesticides (APVMA – Australian Pesticides and Vet Medicines Authority)

      • Complete a Treatment Record as required by the Pesticides Act and Pesticides Regulations.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Exposure to disease, bites & stings from insects, reptiles, hazardous plants

      Before controls3 High
      Controls
      • First Aid requirements:

        • Provision of first aid equipment - adequate Bites/Stings First Aid kit is available

        • Each worker must have access to the equipment

        • Workers have access to facilities for the administration of first aid

        • Ensure vaccinations (such as Hepatitis B, tetanus etc.) are offered to staff

        • People with known allergic responses should consult a doctor and ensure appropriate kit is available at all times (Including EpiPen - in date).

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 11 个工作步骤,从“Transporting chemicals”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个超值套装

免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。

  • 付费套餐包含

    使用套餐中的模板额度。本套装只需 7 个额度,而不是 9 个。

    比较套餐和价格
  • 单独购买

    $629.65 $809.55 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

涵盖内容

12 个工作步骤

  1. PlanningPlan for weather, licences, approved pesticides and first aid
  2. Transporting chemicalsSecure and separate chemicals in the vehicle and drive safely
  3. Arrival on-site & assess onsite conditionsCheck the site and plan the treatment
  4. Check weather conditions & prepareCheck the weather and protect workers from heat and cold
  5. Work area preparationClear the area, check equipment and mix pesticides safely
  6. EnvironmentManage waste and protect the environment
  7. House keepingKeep the work area clean and safe
  8. Manual tasksUse safe manual task practices to prevent musculoskeletal injury
  9. Pesticide applicationHandle and apply pesticides safely
  10. Termite barrier fixingHandle and fix termite barrier materials safely
  11. On completionKeep re-entry closed, wash up and sign out
  12. Emergency responseRespond to injuries, environmental damage and other emergencies

涵盖的危险

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。