抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

模板文件为英文。

免费试用编辑器

超值套装 · 12 个模板属于Tree Arborist Services

Tree Felling - Manual

SWMS · SWMS-10278

  • 15 个工作步骤
  • 版本 7

This Tree Felling - Manual Safe Work Method Statement (SWMS) covers the hazards and controls of felling trees by hand, including chainsaw use, working near power lines and protecting workers and the public.

It covers 15 job steps, from training, planning and checking the weather, through arrival on-site, work area set-up, the environment, housekeeping and manual tasks, to powered and non-powered tools, tree felling, cross-cutting, moving and loading felled trees, fuelling on-site, completion and emergency response.

It includes controls for high-risk construction work around mobile plant, energised electrical services, hazardous atmospheres and traffic corridors, and an emergency response for injuries, fatalities and environmental damage.

It suits businesses and professionals in arboriculture, forestry, landscaping and any operation that involves manual tree felling.

查看单独页面

Tree Felling - Manual SWMS 预览

Tree Felling - Manual

SWMSVersion 7
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column):

  • Mobile Plant
  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous LinesChemical, fuel or refrigerant lines
  • Energised ElectricalEnergised electrical installations or services
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere
  • Traffic CorridorsWork carried out adjacent to a road, railway or shipping lane, traffic corridor

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Training

    • Hazard

      Untrained workers

      Before controls4 Acute
      Controls
      • Ensure operators are trained and experienced in understanding tree felling operations

      • Trained in determining tree height

      • Accredited chainsaw operator (advanced felling if dealing with hazardous trees)

      • All relevant workers involved in the use of a chainsaw must be suitably trained and deemed competent to operate the chainsaw

      • Chainsaw training of operators must include:

        • Review of operating manual

        • Starting the chainsaw and cutting techniques

        • Removal of the guard for maintenance work including restrictions on who may do the work

        • Actions, including who and how to notify, if a guard is found removed or missing

        • Practical instructions on how to replace and sharpen the chain

      • Knowledge of dangerous tree types.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Roadside work

      Before controls4 Acute
      Controls
      • All people working adjacent to traffic appropriately trained.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 14 个工作步骤,从“Planning”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个超值套装

免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。

  • 付费套餐包含

    使用套餐中的模板额度。本套装只需 9 个额度,而不是 12 个。

    比较套餐和价格
  • 单独购买

    $809.55 $1,079.40 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

涵盖内容

15 个工作步骤

  1. TrainingTrain operators in tree felling and chainsaw use
  2. PlanningGet an electrical permit before working within the safe approach distance of power lines
  3. Check weather conditions & prepareCheck the weather and prepare for heat, cold, bites, stings and hazardous plants
  4. Arrival on-site & assess onsite conditionsPark safely, report in and assess the site and the tree
  5. Work area set-upSet up traffic management, barriers and a clearance zone
  6. EnvironmentControl noise, waste, fuels, runoff and harm to vegetation and fauna
  7. House keepingKeep the work area clear to prevent slips, trips and falls
  8. Manual tasksLift and move materials safely to avoid strain injuries
  9. Working with powered & non-powered toolsInspect and use tools as the manufacturer instructs
  10. Tree fellingClear the area, plan escape routes and fell the tree
  11. Cross-cuttingCross-cut safely, watching for limbs under tension
  12. Moving & loading felled treesKeep groundworkers clear and control loads when moving felled trees
  13. Fuelling on-siteRefuel safely with no smoking and the right extinguisher
  14. On completionAdjust barricades, sign out and use designated routes
  15. Emergency responseCall 000, follow emergency procedures and give first aid

涵盖的危险

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。