抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

模板文件为英文。

超值套装 · 16 个模板属于Warehousing Combo

Electric Vehicle Battery Charging

SWMS · SWMS-10348

  • 6 个工作步骤
  • 版本 5

This Electric Vehicle Battery Charging Safe Work Method Statement (SWMS) outlines the safety steps, potential hazards and controls for managing the risks of repairing, servicing and charging electric vehicle batteries.

It covers 6 job steps: planning, training, battery storage, repair, maintenance, servicing and charging, battery disposal, and emergency response.

It includes controls for fire and explosion, hazardous chemicals including sulphuric acid, electric shock, spills and manual handling, and for high-risk construction work involving mobile plant and hazardous atmospheres.

It suits electric vehicle service technicians, workplace safety officers and construction project managers.

查看单独页面

Electric Vehicle Battery Charging SWMS 预览

Electric Vehicle Battery Charging

SWMSVersion 5
Company doing the work
[Company]
Business contact
—
Phone #
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site Management Plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Eye Protection
  • Hand Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Fire/ explosion; Hazardous chemicals – including sulphuric acid, lead; Hazardous atmosphere

      Before controls4 Acute
      Controls
      • Repair/charging area. Ensure:

        • The area has caution signs

        • Well ventilated (provide explosion-proof mechanical ventilation if required)

        • Protected from direct sunlight

        • Not located near flammable storages or other hazardous chemicals

        • Spill containment system in place

        • Adequate fire protection provided

        • Emergency shower and eyewash provided

        • No ignition sources within 6m; all electrical installations should be rated explosion-proof

        • Equipped with overhead hoists, conveyors or cranes for handling batteries

        • A clear pathway for Battery/Forklift travels from the storage/unloading area to the charging area.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Contact with electricity

      Before controls4 Acute
      Controls
      • Plant and equipment. Ensure:

        • All manufacturer’s /supplier’s instructions and user manuals are available

        • Electrical equipment installed by qualified electricians where necessary

        • Portable electrical equipment is connected, protection by an appropriate residual current device (RCD)

        • Seek the advice of a competent person for appropriate inspection and testing intervals of equipment

        • Clearly marking walkways and charging area.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 5 个工作步骤,从“Training”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个超值套装

免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。

  • 付费套餐包含

    使用套餐中的模板额度。本套装只需 12 个额度,而不是 16 个。

    比较套餐和价格
  • 单独购买

    $1,079.40 $1,439.20 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

涵盖内容

6 个工作步骤

  1. PlanningSet up the repair and charging area and its electrical equipment
  2. TrainingTrain and license workers who handle and charge batteries
  3. Battery storageStore batteries away from ignition sources and follow the SDS
  4. Repair, maintenance, servicing & charging of electric vehicle batteriesControl plant movement, acid, charging, spills and handling when servicing batteries
  5. Battery disposalDispose of and recycle batteries without incinerating them
  6. Emergency responseCall 000, follow emergency procedures and give first aid

涵盖的危险

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。