抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

模板文件为英文。

免费试用编辑器

Wood Fired Pizza Oven (Mobile)

SWMS · SWMS-10519

Wood Fired Pizza Oven (Mobile) SWMS模板预览
  • 9 个工作步骤
  • 版本 2
  • Miscellaneous
  • 任何手机都能看

This Wood Fired Pizza Oven (Mobile) Safe Work Method Statement (SWMS) sets out the safety measures for the common hazards of using solid-fuel cooking systems. These systems usually use wood, briquettes or charcoal, and can include char broilers, barbecues, rotisseries, smokers, hearth and brick ovens.

It covers 9 job steps: preparation and planning, environment, housekeeping, manual tasks, arrival and setting up at the event, pizza making, trading, completion and emergency response. It includes a risk matrix to evaluate and manage the hazards.

It suits businesses and individuals in mobile catering that use wood-fired pizza ovens at events, and event organisers and venue managers who need compliance and safety during food preparation and service.

Wood Fired Pizza Oven (Mobile) SWMS 预览

Wood Fired Pizza Oven Safe Work Method Statement (SWMS)

SWMSVersion 2
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site Management Plan

If the work is part of a construction project, this SWMS must align with the requirements of the Site Management Plan in place for the Construction Project.

High-Risk Construction Work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous LinesChemical, fuel or refrigerant lines
  • Energised ElectricalEnergised electrical installations or services
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold Points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/Review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-Specific Notes

Legislation and codes of practice

None listed.

Personal Protective Equipment (PPE)

  • Foot Protection
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Preparation & planning

    • Hazard

      Legislation breach

      Before controls3 High
      Controls
      • Ensure all operations comply with local council (and other Authorities as relevant) permits, restrictions etc.

      • Do not operate without a Total Fire Ban Exemption permit.

      After controls2 Moderate
      Responsible
      • Supervisorto maintain awareness of weather conditions
      • Workersto follow controls
    • Hazard

      Food safety breach

      Before controls3 High
      Controls
      • Ensure all areas meet relevant food safety standards requirements:

        • Wash and storage facilities

        • Floor is a non-slip material that can be effectively cleaned

        • Adequate waste disposal

        • Sufficient ventilation as required.

      After controls2 Moderate
      Responsible
      • Supervisorto maintain awareness of weather conditions
      • Workersto follow controls
    • Hazard

      Emergency

      Before controls4 Acute
      Controls
      • Plan set-up locations ahead of time. Ensure location within reasonable access to emergency facilities

      • A ‘Buddy’ system must be utilised at all times when working alone. Ensure:

        • GPS locator on relevant worker’s vehicles

        • Mobile phone (with service in work area, pre-programmed with emergency numbers)

        • Mobile & satellite phones and EPIRB are fit for purpose, tested before departure & phones have spare, fully charged batteries and facilities for continuous charging.

      After controls2 Moderate
      Responsible
      • Supervisorto maintain awareness of weather conditions
      • Workersto follow controls
    • Hazard

      Personal injury: Fire / explosion; Exposure to a hazardous atmosphere

      Before controls4 Acute
      Controls
      • All electrical installations are installed by a licensed auto electrician and meet requirements of relevant Australian Standards

      • Ensure the oven and appliances are:

        • Constructed following the manufacturers’ instructions, ensure the flue:

          • Specifications are appropriate for the make and model of the particular pizza oven

          • Is regularly cleaned, failure to do so may result in flue fires

        • Used only for the designed purpose

      • Sufficient fire protection equipment available, tested, functional, labelled with test date, is immediately accessible as required and access is not obstructed in any way.

      After controls2 Moderate
      Responsible
      • Supervisorto maintain awareness of weather conditions
      • Workersto follow controls

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 8 个工作步骤,从“Environment”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个模板

免费注册,然后选择获取方式。你的公司信息会自动填好。

  • 付费套餐包含

    使用套餐中的模板额度。这一份需要 1 个额度。

    比较套餐和价格
  • 单独购买

    $89.95 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

涵盖内容

9 个工作步骤

  1. Preparation & planningComply with council permits and food safety standards, plan for emergencies and install the oven safely
  2. EnvironmentManage dust, smoke, waste, and impacts on waterways and fauna
  3. HousekeepingKeep the work area clear to prevent slips, trips and falls
  4. Manual tasksHandle materials and equipment to prevent musculoskeletal injuries
  5. Arrival & setting up at the eventPosition the vehicle and equipment safely and protect the public
  6. Pizza makingOperate the oven safely, managing fire and avoiding burns
  7. TradingHandle cash safely to prevent robbery
  8. On completionDispose of ashes safely and clear the site
  9. Emergency responseRespond to injuries, environmental damage and other emergencies

涵盖的危险

评价

暂无评价。

查看全部

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。