عرض الوصول المبكر:وصول مبكر: خصم 30%، ما دمت مشتركًا.

احصل على العرض

مستندات النماذج مكتوبة باللغة الإنجليزية.

حزمة توفير · 53 نماذج

Builders

حزمة توفير · PACK-50173

معاينة نموذج حزمة توفير Builders
  • 53 نماذج
  • 53 بسعر 28
  • يصل في مجلد واحد في المكتبة

A set of 53 SWMS for builders and building contractors: site establishment, carpentry, roofing, scaffolding, plumbing and drainage, glazing and painting.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost 28 template credits instead of 53.

معاينة SWMS Height Access Equipment

Height Access Equipment

SWMSVersion 11
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures for unanticipated hazards.

      After controls2 Moderate
      Responsible
      • SupervisorCheck the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

16 خطوات عمل أخرى، من Work area set-up إلى Emergency response

لكل منها مخاطرها وتقييمات خطورتها وإجراءات التحكم فيها، إضافة إلى توقيع طاقمك.

المعاينة بصيغة

كيف يبدو في المتصفح

احصل على حزمة التوفير هذه

سجّل مجانًا، ثم اختر الطريقة التي تناسبك. يُضاف كل مستند إلى مكتبتك، في مجلد يحمل اسم الحزمة.

  • مشمول في الخطط المدفوعة

    استخدم أرصدة النماذج من خطتك. تكلفة هذه الحزمة 28 بدلًا من 53.

    قارن الخطط والأسعار
  • اشترِه مرة واحدة

    $2,518.60 $4,767.35 تُدفع مرة واحدة، ويبقى ملكك. يعمل على الخطة المجانية أيضًا.

لا حاجة إلى بطاقة للتسجيل. يحصل أعضاء الوصول المبكر على خصم 30% على أي خطة.

ما يتضمنه

  1. Height Access Equipment

    SWMS · 17 خطوات عمل

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    يُباع أيضًا منفردًا
  2. Internal External Lock-Up Fix Stage Carpentry

    SWMS · 15 خطوات عمل

    Covers internal and external lock-up and fix stage carpentry, with the risks and controls for each job step from site arrival to emergency response.

    يُباع أيضًا منفردًا
  3. Painting and Decorating

    SWMS · 15 خطوات عمل

    SWMS for painting and decorating work: transport, site set-up, ladders and scaffolds, surface preparation, mixing, spraying and emergencies.

    يُباع أيضًا منفردًا
  4. Roof Work

    SWMS · 14 خطوات عمل

    SWMS for roof work: hazards and controls for falls from height, asbestos, access by scaffold, ladder or hatch, harness use, tools and emergencies.

    يُباع أيضًا منفردًا
  5. Glazing

    SWMS · 15 خطوات عمل

    A glazing SWMS covering cutting, drilling, grinding and installing glass balustrades, windows, doors, shower screens and mirrors.

    يُباع أيضًا منفردًا
  6. Mobile Plant Working Near-Around

    SWMS · 8 خطوات عمل

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    يُباع أيضًا منفردًا
  7. Retaining Wall

    SWMS · 19 خطوات عمل

    SWMS for building retaining walls: post and sleeper, masonry block and rock walls, from design and excavation to completion and emergencies.

    يُباع أيضًا منفردًا
  8. Roof Edge Protection

    SWMS · 16 خطوات عمل

    SWMS for installing and dismantling roof edge protection using extension ladders, mobile scaffolding and safety harnesses.

    يُباع أيضًا منفردًا
  9. Garage Door Installation

    SWMS · 14 خطوات عمل

    Garage Door Installation SWMS: 14 job steps covering silica dust, ladders, manual tasks, door opener wiring, tools, chemicals and emergencies.

    يُباع أيضًا منفردًا
  10. Insulation - Batts Installation

    SWMS · 12 خطوات عمل

    SWMS for installing insulation batts in ceilings and walls: planning, delivery, ceiling space access, electricity, falls, asbestos, heat stress and fire.

    يُباع أيضًا منفردًا
  11. Erecting Fixed Scaffold

    SWMS · 14 خطوات عمل

    Erecting Fixed Scaffold SWMS: 14 job steps from unloading and erecting to handover, dismantling and emergency response.

    يُباع أيضًا منفردًا
  12. Plumbing Drainage

    SWMS · 18 خطوات عمل

    Plumbing drainage SWMS for installing pipes, stormwater tanks and polyethylene pipe welding, and for sewage and stormwater drainage on civil works.

    يُباع أيضًا منفردًا
  13. Final Building Clean Before Handover to Client

    SWMS · 10 خطوات عمل

    SWMS for the final clean of a building before handover: site set-up, mobile plant, trestles and ladders, cleaning chemicals, manual tasks, dust and sharps.

    يُباع أيضًا منفردًا
  14. Rough-in Final Fit-out Plumbing

    SWMS · 18 خطوات عمل

    Rough-in Final Fit-out Plumbing SWMS: 18 job steps covering pipework, appliances and fixtures, excavation, hot work, silica dust and emergencies.

    يُباع أيضًا منفردًا
  15. Timber Floor Laying

    SWMS · 13 خطوات عمل

    Timber Floor Laying SWMS: 13 job steps covering delivery, underlay, timber boards, silica and wood dust, nail guns, adhesives and emergencies.

    يُباع أيضًا منفردًا
  16. Skip Bin

    SWMS · 11 خطوات عمل

    Skip Bin SWMS: eleven job steps for skip bin delivery and pick-up with a truck-mounted skip lifter, from travel and set-up to emergency response.

    يُباع أيضًا منفردًا
  17. Concrete Boom or Line Pumping

    SWMS · 15 خطوات عمل

    SWMS for truck-mounted concrete boom and line pumping: road travel, pump set-up, the pour, clearing line blockages, line cleaning and emergencies.

    يُباع أيضًا منفردًا
  18. Traffic Corridor - Establishing a Safe Work Zone

    SWMS · 8 خطوات عمل

    Traffic corridor SWMS: 8 job steps covering the traffic management plan, safe work zone set-up, traffic controllers, pedestrians and zone takeouts.

    يُباع أيضًا منفردًا
  19. Construction Labourer

    SWMS · 16 خطوات عمل

    Construction Labourer SWMS: 16 job steps for labourers on construction sites, from silica dust and mobile plant to ladders and emergency response.

    يُباع أيضًا منفردًا
  20. Temporary Fencing

    SWMS · 11 خطوات عمل

    SWMS for temporary fencing: delivery, set-up, installation and removal, traffic and plant, manual tasks, housekeeping, completion and emergencies.

    يُباع أيضًا منفردًا
  21. Plasterboard

    SWMS · 16 خطوات عمل

    Plasterboard SWMS for fixing and setting sheets to walls and ceilings, with cornice: 16 job steps from silica dust training to cutting, sanding and stilts.

    يُباع أيضًا منفردًا
  22. Decking

    SWMS · 19 خطوات عمل

    SWMS for building a timber deck: falls from height, mobile plant, post footings, silica dust, wet cement and deck finishes.

    يُباع أيضًا منفردًا
  23. Brick and Block Laying

    SWMS · 22 خطوات عمل

    SWMS for brick and block laying: silica dust, materials delivery, mortar, cutting and laying, core steel, acid washing, scaffolds and ladders, and emergencies.

    يُباع أيضًا منفردًا
  24. Concrete Foundations Excavating - Pouring

    SWMS · 17 خطوات عمل

    SWMS for excavating, steel setting and pouring concrete foundations: 17 job steps from site set-up and plant delivery to the pour and emergencies.

    يُباع أيضًا منفردًا
  25. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 خطوات عمل

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    يُباع أيضًا منفردًا
  26. Fencing

    SWMS · 16 خطوات عمل

    Fencing SWMS: 16 job steps for wire, timber, steel panel, pool and glass panel fences, from planning to post holes, gates and emergencies.

    يُباع أيضًا منفردًا
  27. Duct Work Installation

    SWMS · 11 خطوات عمل

    SWMS for installing ductwork for exhaust and air conditioning systems: site set-up, delivery, roof space work, tools, chemicals and emergencies.

    يُباع أيضًا منفردًا
  28. Working in Roof Spaces

    SWMS · 8 خطوات عمل

    SWMS for working in roof spaces, ceiling spaces and subfloors: electrical hazards, ladders, heat stress, vermin, snakes and emergency response.

    يُباع أيضًا منفردًا
  29. Construction Site Visitor

    SWMS · 7 خطوات عمل

    Construction Site Visitor SWMS: 7 job steps covering weather, site arrival, manual tasks, navigating the site and emergencies.

    يُباع أيضًا منفردًا
  30. Overhead Electric Lines - Working Near

    SWMS · 6 خطوات عمل

    Overhead Electric Lines SWMS: 6 job steps covering exclusion zones, spotters, mobile plant near powerlines and emergency response.

    يُباع أيضًا منفردًا
  31. Earthmoving Equipment

    SWMS · 23 خطوات عمل

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    يُباع أيضًا منفردًا
  32. Timber Floor Sanding and Finishing

    SWMS · 14 خطوات عمل

    SWMS for sanding indoor timber floors and applying varnish or similar coatings: set-up, tools, dust, chemicals, refuelling and emergencies.

    يُباع أيضًا منفردًا
  33. Cladding

    SWMS · 12 خطوات عمل

    SWMS for installing cladding or siding, such as Hardie plank, on the outside of structures: delivery, access, silica dust, tools and emergencies.

    يُباع أيضًا منفردًا
  34. Cabinet Installation

    SWMS · 12 خطوات عمل

    SWMS for cabinet making and installation: client consultation, site set-up, tools, hazardous substances, dust control, ladders, cuts and emergencies.

    يُباع أيضًا منفردًا
  35. Air Conditioning Installation

    SWMS · 16 خطوات عمل

    Covers installing, maintaining or repairing air conditioning units, with the risks and controls for each job step from planning to emergency response.

    يُباع أيضًا منفردًا
  36. Dogman

    SWMS · 12 خطوات عمل

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    يُباع أيضًا منفردًا
  37. Rendering

    SWMS · 14 خطوات عمل

    SWMS for rendering: silica dust, weather, work area set-up, ladders and scaffolds, surface preparation, render mixing, fuelling and emergency response.

    يُباع أيضًا منفردًا
  38. Electrical New Installation

    SWMS · 20 خطوات عمل

    SWMS for new electrical installations: planning, site set-up, tools, ladders, live work, excavation, switchboards, testing and emergencies.

    يُباع أيضًا منفردًا
  39. Powered Non-powered Tools

    SWMS · 12 خطوات عمل

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    يُباع أيضًا منفردًا
  40. Plumbing Gas Fitting

    SWMS · 21 خطوات عمل

    Plumbing Gas Fitting SWMS: 21 job steps for gas fitting work, from planning and excavation to pipework, purging and pressure testing.

    يُباع أيضًا منفردًا
  41. Manual Handling

    SWMS · 18 خطوات عمل

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    يُباع أيضًا منفردًا
  42. Carpet Laying

    SWMS · 14 خطوات عمل

    A Carpet Laying SWMS covering the hazards and controls for installing carpets and carpet tiles, from floor preparation to laying, trimming and seaming.

    يُباع أيضًا منفردًا
  43. Tiling

    SWMS · 14 خطوات عمل

    Tiling SWMS: 14 job steps covering silica dust, weather, delivery, ladders and scaffold, tile cutting, completion and emergencies.

    يُباع أيضًا منفردًا
  44. Awnings Blinds Curtains Installation

    SWMS · 14 خطوات عمل

    SWMS for installing awnings, blinds and curtains: site set-up, tools, working at height on ladders and trestles, drilling brackets, mounting and emergencies.

    يُباع أيضًا منفردًا
  45. Excavation Near Assets

    SWMS · 13 خطوات عمل

    SWMS for excavating near underground services and assets: site planning, survey, work area set-up, contact with utilities and emergency response.

    يُباع أيضًا منفردًا
  46. Plumbing - Water Meter Installation

    SWMS · 16 خطوات عمل

    Plumbing SWMS for installing water meters: 16 job steps from site assessment and electrical hazards to excavation, confined space and emergency response.

    يُباع أيضًا منفردًا
  47. Concrete Slab on Ground

    SWMS · 17 خطوات عمل

    Safe work method statement for concrete slab on ground work, covering formwork, fill and steel reinforcement placement, with the hazards and controls for each job step.

    يُباع أيضًا منفردًا
  48. Waterproofing

    SWMS · 12 خطوات عمل

    SWMS for waterproofing internal wet areas, balconies and rooftops: site set-up, tools, working at height, membranes and torch-on work.

    يُباع أيضًا منفردًا
  49. Floating Floor Laying

    SWMS · 14 خطوات عمل

    Covers safe floating floor installation, with the risks and controls for each job step from site arrival to emergency response.

    يُباع أيضًا منفردًا
  50. Aluminium Window Door Frame Installation

    SWMS · 15 خطوات عمل

    Aluminium window and door frame installation SWMS: 15 job steps from silica training and site set-up to scaffolds, cutting, fixing frames and emergencies.

    يُباع أيضًا منفردًا
  51. Framing and Trusses - Timber-Steel

    SWMS · 15 خطوات عمل

    SWMS for erecting timber and steel framing and trusses: delivery, working at height, standing frames, craning and bracing trusses, and emergency response.

    يُباع أيضًا منفردًا
  52. Site Establishment

    SWMS · 11 خطوات عمل

    Site Establishment SWMS: 11 job steps from planning and traffic management to tools, site set-up, working at height and emergency response.

    يُباع أيضًا منفردًا
  53. Port-a-loo Service

    SWMS · 8 خطوات عمل

    Covers servicing a port-a-loo: cleaning, pump-out of the sewage tank and adding deodorising chemicals, with the hazards and controls for each job step.

    يُباع أيضًا منفردًا

ما يغطيه

المخاطر التي يغطيها

التشريعات والمعايير التي يستند إليها

يأتي كل SWMS مع قائمة مراجع التشريعات ومدونات الممارسة الخاصة بنا.

ما توفّره

النموذجخطوات العملمنفردًا
Height Access Equipment17$89.95 · رصيد واحد
Internal External Lock-Up Fix Stage Carpentry15$89.95 · رصيد واحد
Painting and Decorating15$89.95 · رصيد واحد
Roof Work14$89.95 · رصيد واحد
Glazing15$89.95 · رصيد واحد
Mobile Plant Working Near-Around8$89.95 · رصيد واحد
Retaining Wall19$89.95 · رصيد واحد
Roof Edge Protection16$89.95 · رصيد واحد
Garage Door Installation14$89.95 · رصيد واحد
Insulation - Batts Installation12$89.95 · رصيد واحد
Erecting Fixed Scaffold14$89.95 · رصيد واحد
Plumbing Drainage18$89.95 · رصيد واحد
Final Building Clean Before Handover to Client10$89.95 · رصيد واحد
Rough-in Final Fit-out Plumbing18$89.95 · رصيد واحد
Timber Floor Laying13$89.95 · رصيد واحد
Skip Bin11$89.95 · رصيد واحد
Concrete Boom or Line Pumping15$89.95 · رصيد واحد
Traffic Corridor - Establishing a Safe Work Zone8$89.95 · رصيد واحد
Construction Labourer16$89.95 · رصيد واحد
Temporary Fencing11$89.95 · رصيد واحد
Plasterboard16$89.95 · رصيد واحد
Decking19$89.95 · رصيد واحد
Brick and Block Laying22$89.95 · رصيد واحد
Concrete Foundations Excavating - Pouring17$89.95 · رصيد واحد
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · رصيد واحد
Fencing16$89.95 · رصيد واحد
Duct Work Installation11$89.95 · رصيد واحد
Working in Roof Spaces8$89.95 · رصيد واحد
Construction Site Visitor7$89.95 · رصيد واحد
Overhead Electric Lines - Working Near6$89.95 · رصيد واحد
Earthmoving Equipment23$89.95 · رصيد واحد
Timber Floor Sanding and Finishing14$89.95 · رصيد واحد
Cladding12$89.95 · رصيد واحد
Cabinet Installation12$89.95 · رصيد واحد
Air Conditioning Installation16$89.95 · رصيد واحد
Dogman12$89.95 · رصيد واحد
Rendering14$89.95 · رصيد واحد
Electrical New Installation20$89.95 · رصيد واحد
Powered Non-powered Tools12$89.95 · رصيد واحد
Plumbing Gas Fitting21$89.95 · رصيد واحد
Manual Handling18$89.95 · رصيد واحد
Carpet Laying14$89.95 · رصيد واحد
Tiling14$89.95 · رصيد واحد
Awnings Blinds Curtains Installation14$89.95 · رصيد واحد
Excavation Near Assets13$89.95 · رصيد واحد
Plumbing - Water Meter Installation16$89.95 · رصيد واحد
Concrete Slab on Ground17$89.95 · رصيد واحد
Waterproofing12$89.95 · رصيد واحد
Floating Floor Laying14$89.95 · رصيد واحد
Aluminium Window Door Frame Installation15$89.95 · رصيد واحد
Framing and Trusses - Timber-Steel15$89.95 · رصيد واحد
Site Establishment11$89.95 · رصيد واحد
Port-a-loo Service8$89.95 · رصيد واحد
عند الشراء واحدًا تلو الآخر$4,767.35 · 53 أرصدة
ضمن هذه الحزمة$2,518.60 · 28 أرصدة توفّر $2,248.75

المراجعات

لا توجد مراجعات بعد.

كيف تعمل النماذج

جرّبه قبل أن تدفع.

  1. معاينة مجانية

    خطوات العمل والمخاطر والمهمة الأولى في كل نموذج متاحة للقراءة. دون تسجيل.

  2. جرّب المحرّر

    كيّف بيان SWMS تجريبيًا باسم شركتك ومهمتك وموقعك، على الحاسوب أو هاتفك.

  3. سجّل مجانًا

    تنتقل بياناتك وشعارك معك. وهذا النموذج يُفتح معبّأً مسبقًا.

  4. استخدم رصيدًا أو اشترِ مرة واحدة

    تتضمن الخطط المدفوعة أرصدة نماذج كل شهر. أو اشترِ هذا النموذج ليبقى لك.