COVID-19 Deep Cleaning

SWMS · SWMS-10639

  • 12 job steps
  • Version 2
  • Cleaning
  • Reads on any phone

This COVID-19 Deep Cleaning SWMS guides businesses through deep cleaning to reduce the risks of COVID-19. It covers electrical equipment, work at height, slips, trips and falls, hazardous substances, manual tasks and the environment.

It takes your crew through each step: planning, arriving on site, fitting PPE, washing hands, preparing the area, cleaning and steaming surfaces, housekeeping, manual tasks, working at height, the environment, completion and emergency response.

It suits businesses and contractors that provide deep cleaning services, especially COVID-19 decontamination, and the facility managers and health and safety officers who need rigorous cleaning protocols.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

Preview of the COVID-19 Deep Cleaning SWMS

COVID-19 Deep Cleaning

SWMSVersion 2
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Business contact phone
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following 'High-Risk Construction Work' (HRCW - identified in the Job Task column)

  • FallsInvolves a risk of a person falling from 2m or more, including work on telecommunications towers

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

(add notes specific to this site)

Act, regulations, codes of practice references

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Head ProtectionHard Hat
  • Face Protection
  • Protective Clothing
  • Breathing ProtectionRespirator
  • Protective Mask

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Fatigue; Unauthorised access; Insecure workplace

      Before controls3 High
      Controls
      • Out-of-hours / night work:

        • Allow adequate meal breaks for workers; especially if they have worked during part of the day, they will need time to rest & recover sufficiently to work safely into the evening/night

        • Do not schedule full double shifts for workers as worker fatigue increases the risk of incidents

      • Workers have access to:

        • Suitable amenities (toilets/wash facilities/drinking water)

        • Sufficient lighting (including parking areas)

        • Air conditioning and heating

        • Mechanical ventilation if required

        • Emergency exits

        • Safe area for parking/unloading equipment – protected from rain

      • Additional security personnel on-site to ensure no unauthorised access by the general public while work is being performed

      • No worker should work alone on the site at night.

      After controls2 Moderate
      Responsible
      • Supervisorto ensure all planning is actioned & scheduled breaks
    • Hazard

      Infection; Disease; Allergic reaction

      Before controls3 High
      Controls
      • Ensure vaccinations (such as Hepatitis B, tetanus, viral shots) are offered to staff

      • People with known allergic responses should consult a doctor and ensure appropriate kit is available at all times (Including EpiPen - in date).

      After controls2 Moderate
      Responsible
      • Supervisorto ensure all planning is actioned & scheduled breaks
    • Hazard

      Emergency

      Before controls4 Acute
      Controls
      • Avoid people working alone, use a buddy system to provide immediate support

      • Have a reliable communication system in place and test regularly.

      After controls2 Moderate
      Responsible
      • Supervisorto ensure all planning is actioned & scheduled breaks

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

11 more job steps, from Arrival on-site & assess onsite conditions to Emergency response

Each with its hazards, risk ratings and controls, plus your crew's sign-on.

Preview as

How it reads in a browser

Get this template

Sign up free, then choose how you'd like it. Your company details fill in for you.

  • Included in paid plans

    Use template credits from your plan. This one costs 1.

    Compare plans and prices
  • Buy it once

    $89.95 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What it covers

12 job steps

  1. PlanningPlan breaks, amenities, security, vaccinations and emergency communication for the job.
  2. Arrival on-site & assess onsite conditionsReport to the site supervisor, follow site signage and induction, and complete a JSA.
  3. Fitting Personal Protective Equipment (PPE)Fit coveralls, gloves, masks, respirators and footwear correctly.
  4. Washing handsWash hands with soap and water, or use hand sanitiser, at the right times.
  5. Preparing room/areaSet up an exclusion zone and stop work if unauthorised people enter it.
  6. Clean & steam surfacesClean and disinfect surfaces with bleach or disinfectant, and use the steam cleaner safely.
  7. House keepingKeep the work area tidy, well lit and free of trip hazards.
  8. Manual tasksReduce manual task strain with close placement, team lifts and suitable equipment.
  9. Working at heightAvoid work above 2m, and use approved equipment and ladders safely.
  10. EnvironmentDispose of waste and chemicals correctly.
  11. On completionClean and disinfect equipment, dispose of PPE, wash hands and sign out.
  12. Emergency responseCall 000, follow the site emergency procedures, give first aid and report the incident.

Hazards it covers

Reviews

No reviews yet.

See all

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.