Early access offer:Early access: 30% off, for as long as you stay subscribed.

Claim offer

Value pack · 40 templatesPart of Electrician-HVAC-Solar Combo

Electricians Safety Management Plan

Management plan · PLAN-20275

  • 8 job steps
  • Version 2

The Electricians Safety Management Plan helps electrical businesses meet legal requirements and set clear responsibilities for safety. It manages site-specific risks and ensures the plan is available for inspection by visitors, workers, contractors and other interested parties.

It sets out the safety policy and rules, risk management with hazard identification and controls, de-energised and live electrical work, electrical work testing, underground and overhead electrical services, auxiliary circuits, PV solar systems, fibre optics and isolation with lockout/tag-out.

It also covers training and site responsibilities, an emergency response plan, first aid and incident management, with appendices for a risk assessment form, equipment register, live work and isolation permits, a SWMS template and incident forms.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

See its own page

Preview of the Electricians Safety Management Plan

Electricians’ safety management plan

Management planVersion 2

Introduction

Management Commitment and Approval

The SMP has been approved and endorsed by (insert name of Owner/CEO or person in a senior management position) which demonstrates a commitment to this SMP.

Senior Management Sign-off:

Date:

Review Procedure

(Insert responsible person name) will review the Safety Management Plan (SMP) as required. The review schedule is in response to organisational and/or legislative changes and requirements. The reviews will be in consultation with workers, HSR and other relevant parties. All relevant persons will be made aware of changes made as a result of the review. Review of the SMP takes place when:

  • identified changes in the workplace affect the SMP; and

  • the SMP is not effective; and

  • there are legislative changes that affect the SMP; and

  • there is a serious incident or dangerous occurrence.

Document Control

The SMP is a controlled document. All unauthorised copies, either electronic or printed, are considered uncontrolled copies. Copyholders and the version numbers will be recorded in the distribution record. All versions of the SMP will have a unique document number and version number.

8 more job steps, from Electrical Work to Emergency response

  1. Electrical Work Policy
  2. Risk Assessment
  3. Licensing
  4. Quality Control
  5. Electrical Safety Equipment and Instruments
  6. and 30 more

Each with its hazards, risk ratings and controls, plus your crew's sign-on.

Preview as

How it reads in a browser

Get this value pack

Sign up free, then choose how you'd like it. Every document goes into your Library, in a folder named for the pack.

  • Included in paid plans

    Use template credits from your plan. This pack costs 28 instead of 40.

    Compare plans and prices
  • Buy it once

    $2,518.60 $3,598.00 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What it covers

8 job steps

  1. Electrical WorkTrained and competent persons, dead circuits, safe isolation, calibrated test equipment and cable detection.
  2. Working with Hazardous materials (examples only)A competent person identifies hazardous materials, with the asbestos register, notes and correct PPE.
  3. Injury to othersSupervision, communication with occupants, exclusion zones and competent workers.
  4. Working at heightRemoving loose debris, hard hats and signs, a barrier safe zone and competent workers.
  5. Working with live servicesExisting plans, detection equipment, isolation of gas and electricity and a permit to work.
  6. Hot works, e.g. gas cutting and burningPPE, ventilation, competent workers, a Hot Work Permit, an end-of-shift check and gas bottle controls.
  7. Slips tripsCables taped down, waste removed, materials stored neatly and good housekeeping.
  8. Emergency responseCalling 000, site emergency and evacuation procedures, first aid and an incident report.

Hazards it covers

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.