Electricians’ safety management plan
Introduction
Management Commitment and Approval
The SMP has been approved and endorsed by (insert name of Owner/CEO or person in a senior management position) which demonstrates a commitment to this SMP.
Senior Management Sign-off: | Date: |
Review Procedure
(Insert responsible person name) will review the Safety Management Plan (SMP) as required. The review schedule is in response to organisational and/or legislative changes and requirements. The reviews will be in consultation with workers, HSR and other relevant parties. All relevant persons will be made aware of changes made as a result of the review. Review of the SMP takes place when:
identified changes in the workplace affect the SMP; and
the SMP is not effective; and
there are legislative changes that affect the SMP; and
there is a serious incident or dangerous occurrence.
Document Control
The SMP is a controlled document. All unauthorised copies, either electronic or printed, are considered uncontrolled copies. Copyholders and the version numbers will be recorded in the distribution record. All versions of the SMP will have a unique document number and version number.
8 more job steps, from Electrical Work to Emergency response
- Electrical Work Policy
- Risk Assessment
- Licensing
- Quality Control
- Electrical Safety Equipment and Instruments
- and 30 more
Each with its hazards, risk ratings and controls, plus your crew's sign-on.




