Flood Storm Clean-up
- Company doing the work
- [Company]
- Business contact
- —
- Phone #
- —
- Responsible person (for monitoring SWMS and work)
- —
- Signature
- —
- Date
- —
- Contact phone #
- —
- Principal contractor (PC)
- [Principal contractor]
- PC address
- —
- PC phone #
- [PC phone]
- Date SWMS provided to PC
- —
- Job site address
- [Site address]
- Part of a construction project
- —
Site management plan
If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.
High-risk construction work
This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column)
- Mobile PlantMobile plant movement
- AsbestosAsbestos disturbance
- Work in a ceiling spaceWork in a ceiling space (W.A. Only)
Planning and preparation
Planning/Preparation
Liaise with Principal Contractor to identify on-site safety systems and procedures
Establish supervisory and communication arrangements
Principal contractor to confirm emergency response procedures are in place.
Hold points
Hold points identified and signed off before continuing work. (specify the hold points)
Training/Licence
All workers to have a General Construction Induction Card
Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.
Trained First Aider on site
All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.
Worker duties and responsibilities
Fit condition for work, i.e., no signs of fatigue, alcohol or drugs
Attend all site inductions/briefings
Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)
Only carry out work related to the contract
Inspect completed work and report possible safety, environmental and quality matters to the supervisor.
Monitor and review
All people involved in the task must have this SWMS communicated to them before work commences
SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident
If additional site hazards identified, review this SWMS and amend control measures to suit
People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP
Give the principal contractor a copy of the revised SWMS
The site supervisor to monitor works against the controls stated in this SWMS
SWMS must be kept on-site and made available for inspection or review
Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident
Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.
Site-specific notes
Legislation and codes of practice
None listed.
Personal protective equipment (PPE)
- Foot Protection
- Eye Protection
- Hand Protection
- Protective Clothing
- Breathing Protection
Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.
Job steps, hazards and controls
- Work activity
Site preparation
- Hazard
Emergency; Electrocution; Various personal injuries
Before controls4 AcuteControlsMaintain regular contact with Emergency Services / News report etc. for updates of safe areas
Obtain advice/evidence from:
Competent people that premises are safe to enter (Emergency Services, Structural Engineer)
Licensed Electrician that either power is isolated to premises or the electrical system is in a safe condition (certificate of electrical safety). Ensure gas is isolated to premises
Competent people (Industrial/ Occupational Hygienists, etc.) that air is safe to breathe levels of lead, PCB’s, asbestos, crystalline silica in cement dust or other contaminants are below occupational exposure levels
Ensure that the following has been planned for and defined:
Correct PPE is selected:
Impervious/waterproof coveralls
Hand protection
Rubber boots with non-slip soles – no laces (Waders if required)
Full or Half-face respirator with multi-purpose (or suitable) cartridge
Splash-proof goggles (or face shield)
Work area hazards identified are mitigated using the hierarchy of controls
Movement of plant
Emergency plan
First Aid Kit
Level of supervision required (more supervision required for less experienced workers)
Lighting (day/night operations)
Access to clean drinking water
Access to suitable water for clean-up and decontamination
Trained first aiders on-site at all times
Functional communications – if relying on the use of mobile phones, ensure service available.
After controls2 ModerateResponsible- Supervisor
- Hazard
Contaminated water
Before controls4 AcuteControlsEnsure there is a supply of clean water for drinking and cleaning.
Do not drink tap water at the flooded property.
After controls2 ModerateResponsible- Supervisor
IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute
Overall risk after controls2 MModeratethe highest rating after controls
16 more job steps, from Check weather conditions & prepare to Emergency response
Each with its hazards, risk ratings and controls, plus your crew's sign-on.