Plant roll-away or roll-over toolbox talk
Read it out at the pre-start or a toolbox meeting, talk through the questions, and have everyone sign on. It's built from our plant roll-away or roll-over page and the 316 SafetyDocs templates that cover it.
- Site
- Date
- Presented by
What it is
Vehicles, trailers or mobile plant rolling away when parked or uncoupled, or tipping over on slopes, soft ground or when tipping a load.
Controls to check, most effective first
- Park on firm, level ground where possible, apply the park brake, lower attachments, chock wheels and remove the key.
- Use plant fitted with rollover protective structures and seatbelts, and make sure operators wear the seatbelt.
- Assess slopes, edges and ground bearing before work, and keep plant back from excavations and embankments.
- Tip only on firm, level ground, and check the load is spread evenly and the tailgate is free before raising.
- Chock trailers and lower the jockey wheel or stands before uncoupling, and never stand in a trailer's path.
Where it comes up on the job
Work steps from SafetyDocs templates that deal with plant roll-away or roll-over:
- Plant roll-overRespond to a plant roll-overFrom Spotter
- Emergency responseRespond to emergencies and plant roll-overFrom Scraper-Dozer-Grader
- Materials deliveryPrevent truck rollover and unload materials safelyFrom Fibreglass Pool Installation
- Delivery of materials and mobile plantKeep clear of moving vehicles and secure parked plant against roll-awayFrom Wire and Electric Fencing Installation
- Operation on slopes or pilesAvoid rollover when working on slopes or pilesFrom Road Profiler Machine
Questions for the crew
- Where could plant roll-away or roll-over come up on this job today?
- Is any of this work on today's job: Plant roll-over?
- The most effective control is: “Park on firm, level ground where possible, apply the park brake, lower attachments, chock wheels and remove the key”. Can we do that here? If not, why not?
- Which controls for plant roll-away or roll-over are missing or not working on this site?
- When would you stop work because of plant roll-away or roll-over, and who would you tell?
- How do we report a hazard, a near miss or an incident on this job?
Sign-on record
Everyone who attended signs below. Keep it with your toolbox talk records.
| Name | Company | Signature |
|---|---|---|
A starting point for a talk, not a SWMS or a risk assessment. Add what's particular to your site and crew.