Oferta de acceso anticipado:Acceso anticipado: 30% de descuento, mientras sigas suscrito.

Aprovechar la oferta

Las plantillas están escritas en inglés.

Paquete ahorro · 40 plantillas

Electrician-HVAC-Solar Combo

Paquete ahorro · PACK-50339

Vista previa de la plantilla Paquete ahorro Electrician-HVAC-Solar Combo
  • 40 plantillas
  • 40 por el precio de 28
  • Llega en una carpeta de la Biblioteca

A set of 28 SWMS, nine SOPs and three plans for electrical, HVAC and solar contractors.

The SWMS cover switchboards, cable ladder, tray and conduit, solar installation, refrigeration, mechanical ventilation and telecommunications towers. The SOPs include Oxy-Acetylene Welding, Refrigerant Gases and Extension Ladder. It also includes Electricians Safety Management Plan, Electrical Emergency Response Plan and Confined Space Emergency Rescue Plan.

Each document is the same one sold on its own, so you get every update to it. Together they cost 28 template credits instead of 40.

Vista previa de SWMS Height Access Equipment

Height Access Equipment

SWMSVersion 11
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures for unanticipated hazards.

      After controls2 Moderate
      Responsible
      • SupervisorCheck the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

16 pasos más del trabajo, de Work area set-up a Emergency response

Cada uno con sus peligros, niveles de riesgo y controles, además de las firmas de tu equipo.

Ver como

Cómo se ve en un navegador

Consigue este paquete ahorro

Regístrate gratis y luego elige cómo lo quieres. Cada documento va a tu Biblioteca, en una carpeta con el nombre del paquete.

  • Incluido en los planes de pago

    Usa créditos de plantilla de tu plan. Este paquete cuesta 28 en vez de 40.

    Comparar planes y precios
  • Cómprala una sola vez

    $2,518.60 $3,598.00 pago único, y es tuya para siempre. También sirve con el plan Gratis.

No necesitas tarjeta para registrarte. Los miembros con acceso anticipado tienen un 30% de descuento en cualquier plan.

Qué incluye

  1. Height Access Equipment

    SWMS · 17 pasos del trabajo

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    También se vende por separado
  2. Switchboard Installation

    SWMS · 14 pasos del trabajo

    SWMS for installing switchboards, covering energised electrical work, arc flash, silica and asbestos controls, ladders and emergency response.

    También se vende por separado
  3. Asbestos Awareness

    SWMS · 4 pasos del trabajo

    Asbestos Awareness SWMS: 4 job steps for identifying and reporting asbestos-containing materials and responding to accidental disturbance.

    También se vende por separado
  4. Extension Ladder

    SOP · 7 secciones

    Extension ladder safe operating procedure: hazards, pre-use inspection, transporting, set-up, use and carrying, with a training register.

    También se vende por separado
  5. Mobile Plant Working Near-Around

    SWMS · 8 pasos del trabajo

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    También se vende por separado
  6. Handheld Power Tools

    SOP · 9 secciones

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    También se vende por separado
  7. Working On/Near Telecommunications Towers

    SWMS · 8 pasos del trabajo

    Working on or near telecommunications towers SWMS: 8 job steps covering tower climbing, falls, RF exposure, completion and emergencies.

    También se vende por separado
  8. Cable Ladder Tray-Conduit Installation

    SWMS · 12 pasos del trabajo

    Cable ladder, tray and conduit installation SWMS: 12 job steps covering services, ladders and scaffold, tools, silica dust, hot work and emergencies.

    También se vende por separado
  9. Electrical Renovations

    SWMS · 20 pasos del trabajo

    Electrical Renovations SWMS: 20 job steps covering power isolation, switchboards, rough-in, fitting appliances, commissioning and emergencies.

    También se vende por separado
  10. Mechanical Ventilation System

    SWMS · 15 pasos del trabajo

    Mechanical Ventilation System SWMS: 15 job steps for installing a commercial kitchen exhaust canopy or hood, from set-up to emergency response.

    También se vende por separado
  11. Solar Installation

    SWMS · 17 pasos del trabajo

    SWMS for installing solar panels on a roof: working at height, electrical isolation, batteries, hand and power tools, chemicals and emergencies.

    También se vende por separado
  12. Manual Handling

    SOP · 5 secciones

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    También se vende por separado
  13. Refrigeration

    SWMS · 18 pasos del trabajo

    SWMS for refrigeration work: cylinder handling, system evacuation, flushing and charging, working at height, testing and emergency response.

    También se vende por separado
  14. Confined Space Work

    SWMS · 10 pasos del trabajo

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    También se vende por separado
  15. Risers Working In

    SWMS · 12 pasos del trabajo

    Safe work method statement for working in risers, covering 12 job steps from rescue planning and entry assessment to falls, heat stress and emergencies.

    También se vende por separado
  16. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 pasos del trabajo

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    También se vende por separado
  17. Silica Dust

    SWMS · 14 pasos del trabajo

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    También se vende por separado
  18. Platform Ladder

    SOP · 7 secciones

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    También se vende por separado
  19. Oxy-Acetylene Welding

    SOP · 9 secciones

    Safe operating procedure for oxy-acetylene welding: hazards, PPE, training, pre-operational inspection, step-by-step operation and a register.

    También se vende por separado
  20. Electricians Safety Management Plan

    Plan de gestión · 8 pasos del trabajo

    A safety management plan for electrical businesses: policy, live and de-energised work, emergency response, first aid, incidents, permits and forms.

    También se vende por separado
  21. Duct Work Installation

    SWMS · 11 pasos del trabajo

    SWMS for installing ductwork for exhaust and air conditioning systems: site set-up, delivery, roof space work, tools, chemicals and emergencies.

    También se vende por separado
  22. Working in Roof Spaces

    SWMS · 8 pasos del trabajo

    SWMS for working in roof spaces, ceiling spaces and subfloors: electrical hazards, ladders, heat stress, vermin, snakes and emergency response.

    También se vende por separado
  23. Hand Tools

    SOP · 9 secciones

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    También se vende por separado
  24. Refrigerant Gas

    SWMS · 9 pasos del trabajo

    SWMS for the safe use of fluorocarbon refrigerants: licensing, cylinder transport and storage, refrigerant recovery, inspection and emergency response.

    También se vende por separado
  25. Air Conditioning Installation

    SWMS · 16 pasos del trabajo

    Covers installing, maintaining or repairing air conditioning units, with the risks and controls for each job step from planning to emergency response.

    También se vende por separado
  26. Electrical New Installation

    SWMS · 20 pasos del trabajo

    SWMS for new electrical installations: planning, site set-up, tools, ladders, live work, excavation, switchboards, testing and emergencies.

    También se vende por separado
  27. Cherry Picker

    SOP · 10 secciones

    Safe operating procedure for a cherry picker: hazards, PPE, inspection, function tests, operation, emergency response and a hazard checklist.

    También se vende por separado
  28. Electrical Emergency Response Plan

    Plan de gestión · 16 secciones

    Sets clear responsibilities and response steps for electrical emergencies, with contact, personnel, first aid, training and drill registers.

    También se vende por separado
  29. Powered Non-powered Tools

    SWMS · 12 pasos del trabajo

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    También se vende por separado
  30. Scissor Lift

    SOP · 10 secciones

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    También se vende por separado
  31. Manual Handling

    SWMS · 18 pasos del trabajo

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    También se vende por separado
  32. Cable Hauling

    SWMS · 16 pasos del trabajo

    A SWMS for cable hauling near roads and in pits or manholes: the hazards and controls from training and planning to pulling cable and emergency response.

    También se vende por separado
  33. Materials Duct Lifter

    SWMS · 6 pasos del trabajo

    Materials Duct Lifter SWMS: 6 job steps covering site set-up, power line clearances, lifter pre-inspection, operation and emergency response.

    También se vende por separado
  34. Electrical Temporary Connections

    SWMS · 14 pasos del trabajo

    Electrical Temporary Connections SWMS: 14 job steps from silica training and set-up to live electrical work, leads and emergency response.

    También se vende por separado
  35. Low Voltage Electrical Repairs and Installations

    SWMS · 20 pasos del trabajo

    SWMS for low voltage electrical repairs, maintenance and installations, including isolation, working near live parts, testing and appliances.

    También se vende por separado
  36. Air Conditioning Service and Repairs

    SWMS · 14 pasos del trabajo

    SWMS for air conditioning service and repairs: refrigerants, indoor and outdoor unit maintenance, energised electrical work, testing and emergencies.

    También se vende por separado
  37. Refrigerant Gases

    SOP · 12 secciones

    Safe operating procedure for refrigerant gases: hazards, PPE, tank transport, handling, storage, filling and maintenance, with a training register.

    También se vende por separado
  38. Pipework Mechanical

    SWMS · 19 pasos del trabajo

    SWMS for mechanical pipework installation: fire system, condenser water and chilled water pipework, from site set-up to commissioning.

    También se vende por separado
  39. Electrical Demolition

    SWMS · 13 pasos del trabajo

    Electrical Demolition SWMS: 13 job steps covering power shutdown, removing fixtures and cabling, asbestos, ceiling spaces and working at height.

    También se vende por separado
  40. Confined Space Emergency Rescue Plan

    Plan de gestión · 11 secciones

    A seven-step emergency rescue plan for confined spaces, with site details, assembly points, first aid officers and rescue equipment.

    También se vende por separado

Qué cubre

Peligros que cubre

Legislación y normas que cita

Cada SWMS incluye nuestra lista de referencia de legislación y códigos de práctica.

Lo que ahorras

PlantillaPasos del trabajoPor separado
Height Access Equipment17$89.95 · 1 crédito
Switchboard Installation14$89.95 · 1 crédito
Asbestos Awareness4$89.95 · 1 crédito
Extension Ladder0$89.95 · 1 crédito
Mobile Plant Working Near-Around8$89.95 · 1 crédito
Handheld Power Tools0$89.95 · 1 crédito
Working On/Near Telecommunications Towers8$89.95 · 1 crédito
Cable Ladder Tray-Conduit Installation12$89.95 · 1 crédito
Electrical Renovations20$89.95 · 1 crédito
Mechanical Ventilation System15$89.95 · 1 crédito
Solar Installation17$89.95 · 1 crédito
Manual Handling0$89.95 · 1 crédito
Refrigeration18$89.95 · 1 crédito
Confined Space Work10$89.95 · 1 crédito
Risers Working In12$89.95 · 1 crédito
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 crédito
Silica Dust14$89.95 · 1 crédito
Platform Ladder0$89.95 · 1 crédito
Oxy-Acetylene Welding0$89.95 · 1 crédito
Electricians Safety Management Plan8$89.95 · 1 crédito
Duct Work Installation11$89.95 · 1 crédito
Working in Roof Spaces8$89.95 · 1 crédito
Hand Tools0$89.95 · 1 crédito
Refrigerant Gas9$89.95 · 1 crédito
Air Conditioning Installation16$89.95 · 1 crédito
Electrical New Installation20$89.95 · 1 crédito
Cherry Picker0$89.95 · 1 crédito
Electrical Emergency Response Plan0$89.95 · 1 crédito
Powered Non-powered Tools12$89.95 · 1 crédito
Scissor Lift0$89.95 · 1 crédito
Manual Handling18$89.95 · 1 crédito
Cable Hauling16$89.95 · 1 crédito
Materials Duct Lifter6$89.95 · 1 crédito
Electrical Temporary Connections14$89.95 · 1 crédito
Low Voltage Electrical Repairs and Installations20$89.95 · 1 crédito
Air Conditioning Service and Repairs14$89.95 · 1 crédito
Refrigerant Gases0$89.95 · 1 crédito
Pipework Mechanical19$89.95 · 1 crédito
Electrical Demolition13$89.95 · 1 crédito
Confined Space Emergency Rescue Plan0$89.95 · 1 crédito
Comprando uno por uno$3,598.00 · 40 créditos
En este paquete$2,518.60 · 28 créditos Ahorras $1,079.40

Opiniones

Todavía no hay opiniones.

Cómo funcionan las plantillas

Pruébalo antes de pagar.

  1. Vista previa gratis

    Los pasos del trabajo, los peligros y la primera tarea de cada plantilla se pueden leer. Sin registrarte.

  2. Prueba el editor

    Adapta un SWMS de demostración con tu empresa, tu trabajo y tu obra, en una computadora o en tu teléfono.

  3. Regístrate gratis

    Tus datos y tu logo se pasan. Esta plantilla se abre ya rellenada.

  4. Usa un crédito o compra una sola vez

    Los planes de pago incluyen créditos de plantilla cada mes. O compra esta para quedártela.