Oferta de acceso anticipado:Acceso anticipado: 30% de descuento, mientras sigas suscrito.

Aprovechar la oferta

Las plantillas están escritas en inglés.

Paquete ahorro · 6 plantillas

Fencing

Paquete ahorro · PACK-50363

Vista previa de la plantilla Paquete ahorro Fencing
  • 6 plantillas
  • 6 por el precio de 5
  • Llega en una carpeta de la Biblioteca

Six SWMS for fencing contractors: fencing, wire and electric fencing, earthmoving equipment, heat stress and power tools.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost five template credits instead of six.

Vista previa de SWMS Wire and Electric Fencing Installation

Wire and Electric Fencing Installation

SWMSVersion 6
Company doing the work
[Company]
Business contact
—
Business contact phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with the requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile Plant

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers are trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract.

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards are identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

(add notes specific to this site)

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Eye Protection
  • Hand Protection
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

Inherent risk-rating (IR) before controls; residual risk-rating (RR) after controls.

  • Work activity

    Planning

    • Hazard

      Incorrect machinery and materials

      Before controls3 High
      Controls
      • Plan for the type of fence:

        • Machinery required for clearing fence line, ensure SWMS in place for applicable machine, e.g. bulldozer, grader

        • Requirements of the fence. e.g. Livestock control, preventing access, land management

        • Length of fence

        • Types of wire, i.e. barbed or plain (consider the weight of rolls for worker manually handling on site)

        • Grade of wire required

        • Grade of strainer posts or pickets

        • Spacing of posts and pickets

        • Gates.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Property encroachment / legislative breach

      Before controls3 High
      Controls
      • If on the property boundary, ensure neighbours are informed before work commences

      • Approvals/permits are in place if required, e.g. accessing adjoining properties, vegetation-clearing permits etc.

      • Confirm the location of the boundary line.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Working alone, emergency

      Before controls4 Acute
      Controls
      • Before undertaking activities in remote areas, careful planning and preparation must be undertaken

      • Select the most appropriate vehicle for the conditions

      • A procedure is developed for regular contact with people working remotely or in isolation, which outlines the frequency, nominated time, and method of contact appropriate for the work location and conditions:

        • An immediate supervisor or manager is aware of travel itineraries, current locations & what tasks are being undertaken in the remote area(s)

        • Scheduled contact people and Injury reporting procedures are developed and in place

        • Mobile & satellite phones and Emergency Position Indicating Radio Beacon (EPIRB) is fit for purpose, tested before departure & phones have spare, fully charged batteries and facilities for continuing charging

      • An emergency response procedure is developed & followed by the works depot or office if staff in remote areas fails to make scheduled contact at the nominated time

      • All safety equipment, including first aid & vehicle breakdown/rescue/tool kits & fire extinguisher(s), are checked before departure, fit for purpose, and regularly maintained

      • Hazard identification procedures:

        • Sufficient supplies of water, food, fuel & supplies needed

        • All relevant workers are appraised for required competencies & for any pre-existing medical conditions if working in remote or isolated locations.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Hunters - gunshot wounds

      Before controls4 Acute
      Controls
      • Check with landowners that no shooters are hunting/culling in the area:

        • If gunshots are heard nearby, leave the area immediately

        • Wear high-visibility clothing at all times.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Exposure to respirable crystalline silica (RCS) – dust inhalation

      Before controls4 Acute
      Controls
      • Concrete work- e.g. post setting

      • Training and information provided to workers on RCS should include the following:

        • Identification of RCS dust through Safety Datasheet (SDS) or labels

        • Dust exposure prevention

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes).

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Extreme weather

      Before controls3 High
      Controls
      • Check weather conditions – do not work in extreme conditions

      • Reschedule works to work in more moderate temperatures.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Hyperthermia, hypothermia

      Before controls3 High
      Controls
      • Ensure workers are trained to recognise the symptoms of hyperthermia and hypothermia

      • Hot conditions. Ensure:

        • Suitable protective clothing

        • Sun brim on hard hats

        • Safety glasses - UV rated

        • Use 30+ sunscreen on exposed skin

        • Adequate drinking water

        • Access to shade on breaks

        • Adequate breaks.

      • Cold conditions. Ensure:

        • Schedule warm-up breaks

        • Hold breaks inside

        • Dress warmly in layers

        • Stay dry (wet clothing chills the body rapidly)

        • Workers must get out of the cold as soon as they can if starting to feel symptoms

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

19 pasos más del trabajo, de Transporting materials a Emergency response

Cada uno con sus peligros, niveles de riesgo y controles, además de las firmas de tu equipo.

Ver como

Cómo se ve en un navegador

Consigue este paquete ahorro

Regístrate gratis y luego elige cómo lo quieres. Cada documento va a tu Biblioteca, en una carpeta con el nombre del paquete.

  • Incluido en los planes de pago

    Usa créditos de plantilla de tu plan. Este paquete cuesta 5 en vez de 6.

    Comparar planes y precios
  • Cómprala una sola vez

    $449.75 $539.70 pago único, y es tuya para siempre. También sirve con el plan Gratis.

No necesitas tarjeta para registrarte. Los miembros con acceso anticipado tienen un 30% de descuento en cualquier plan.

Qué incluye

  1. Wire and Electric Fencing Installation

    SWMS · 20 pasos del trabajo

    Wire and Electric Fencing SWMS: 20 job steps covering stranded wire and electric fence installation, machinery, post holes, wire straining and emergencies.

    También se vende por separado
  2. Heat Stress

    SWMS · 8 pasos del trabajo

    Heat Stress SWMS: 8 job steps covering heat stress symptoms, acclimatisation, hydration, shade, working alone and emergency response.

    También se vende por separado
  3. Fencing

    SWMS · 16 pasos del trabajo

    Fencing SWMS: 16 job steps for wire, timber, steel panel, pool and glass panel fences, from planning to post holes, gates and emergencies.

    También se vende por separado
  4. Earthmoving Equipment

    SWMS · 23 pasos del trabajo

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    También se vende por separado
  5. Powered Non-powered Tools

    SWMS · 12 pasos del trabajo

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    También se vende por separado
  6. Manual Handling

    SWMS · 18 pasos del trabajo

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    También se vende por separado

Qué cubre

Peligros que cubre

Legislación y normas que cita

Cada SWMS incluye nuestra lista de referencia de legislación y códigos de práctica.

Lo que ahorras

PlantillaPasos del trabajoPor separado
Wire and Electric Fencing Installation20$89.95 · 1 crédito
Heat Stress8$89.95 · 1 crédito
Fencing16$89.95 · 1 crédito
Earthmoving Equipment23$89.95 · 1 crédito
Powered Non-powered Tools12$89.95 · 1 crédito
Manual Handling18$89.95 · 1 crédito
Comprando uno por uno$539.70 · 6 créditos
En este paquete$449.75 · 5 créditos Ahorras $89.95

Opiniones

Todavía no hay opiniones.

Cómo funcionan las plantillas

Pruébalo antes de pagar.

  1. Vista previa gratis

    Los pasos del trabajo, los peligros y la primera tarea de cada plantilla se pueden leer. Sin registrarte.

  2. Prueba el editor

    Adapta un SWMS de demostración con tu empresa, tu trabajo y tu obra, en una computadora o en tu teléfono.

  3. Regístrate gratis

    Tus datos y tu logo se pasan. Esta plantilla se abre ya rellenada.

  4. Usa un crédito o compra una sola vez

    Los planes de pago incluyen créditos de plantilla cada mes. O compra esta para quedártela.