Oferta de acceso anticipado:Acceso anticipado: 30% de descuento, mientras sigas suscrito.

Aprovechar la oferta

Las plantillas están escritas en inglés.

Prueba el editor gratis
Paquete ahorro · 26 plantillas

Playground Construction Combo

Paquete ahorro · PACK-50327

Vista previa de la plantilla Paquete ahorro Playground Construction Combo
  • 26 plantillas
  • 26 por el precio de 20
  • Llega en una carpeta de la Biblioteca

A set of 17 SWMS, eight SOPs and one plan for playground builders and installers.

The SWMS cover play equipment installation, soft-fall surfaces, paving, landscape planting, earthmoving and brick and block laying. The SOPs include Mobile Scaffolding, Extension Ladder and Handheld Power Tools. It also includes Falls Emergency Rescue Plan.

Each document is the same one sold on its own, so you get every update to it. Together they cost 20 template credits instead of 26.

Vista previa de SWMS Internal External Lock-Up Fix Stage Carpentry

Internal External Lock-Up Fix Stage Carpentry

SWMSVersion 10
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column):

  • Mobile PlantMobile plant movement
  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous LinesChemical, fuel or refrigerant lines
  • Energised ElectricalEnergised electrical installations or services
  • FallsInvolves a risk of a person falling from 2m or more
  • Telecom TowersIncluding work on telecommunications towers

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers are trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract.

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences.

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards are identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

(add site-specific notes)

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Provide training on the health effects associated with RCS

    • Hazard

      Exposure to respirable crystalline silica (RCS) – dust inhalation

      Before controls3 High
      Controls
      • Training and Information provided to workers on RCS should include the following:

        • Identification of RCS dust through Material/Safety Datasheet (M/SDS) or labels

        • Dust exposure prevention

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes)

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

14 pasos más del trabajo, de Check weather conditions & prepare a Emergency response

Cada uno con sus peligros, niveles de riesgo y controles, además de las firmas de tu equipo.

Ver como

Cómo se ve en un navegador

Consigue este paquete ahorro

Regístrate gratis y luego elige cómo lo quieres. Cada documento va a tu Biblioteca, en una carpeta con el nombre del paquete.

  • Incluido en los planes de pago

    Usa créditos de plantilla de tu plan. Este paquete cuesta 20 en vez de 26.

    Comparar planes y precios
  • Cómprala una sola vez

    $1,799.00 $2,338.70 pago único, y es tuya para siempre. También sirve con el plan Gratis.

No necesitas tarjeta para registrarte. Los miembros con acceso anticipado tienen un 30% de descuento en cualquier plan.

Qué incluye

  1. Internal External Lock-Up Fix Stage Carpentry

    SWMS · 15 pasos del trabajo

    Covers internal and external lock-up and fix stage carpentry, with the risks and controls for each job step from site arrival to emergency response.

    También se vende por separado
  2. Extension Ladder

    SOP · 7 secciones

    Extension ladder safe operating procedure: hazards, pre-use inspection, transporting, set-up, use and carrying, with a training register.

    También se vende por separado
  3. Falls Emergency Rescue Plan

    Plan de gestión · 14 secciones

    A pre-planned procedure for rescuing a worker who has fallen and is suspended in a harness, with a pre-planning checklist and a site-specific rescue plan.

    También se vende por separado
  4. Handheld Power Tools

    SOP · 9 secciones

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    También se vende por separado
  5. Plumbing Drainage

    SWMS · 18 pasos del trabajo

    Plumbing drainage SWMS for installing pipes, stormwater tanks and polyethylene pipe welding, and for sewage and stormwater drainage on civil works.

    También se vende por separado
  6. Rough-in Final Fit-out Plumbing

    SWMS · 18 pasos del trabajo

    Rough-in Final Fit-out Plumbing SWMS: 18 job steps covering pipework, appliances and fixtures, excavation, hot work, silica dust and emergencies.

    También se vende por separado
  7. Mobile Crane

    SWMS · 16 pasos del trabajo

    Mobile Crane SWMS: 16 job steps covering power lines, set-up, load equipment checks, lifting, maintenance, refuelling and emergencies.

    También se vende por separado
  8. Landscape Planting

    SWMS · 18 pasos del trabajo

    SWMS for landscape planting on roadsides and public sites: traffic, mobile plant, tools, soil and mulch, slopes, weather and emergencies.

    También se vende por separado
  9. Manual Handling

    SOP · 5 secciones

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    También se vende por separado
  10. Paving

    SWMS · 19 pasos del trabajo

    Paving SWMS: 19 job steps covering subgrade preparation, cutting and laying pavers, silica dust, cement, acid washing and emergencies.

    También se vende por separado
  11. Brick and Block Laying

    SWMS · 22 pasos del trabajo

    SWMS for brick and block laying: silica dust, materials delivery, mortar, cutting and laying, core steel, acid washing, scaffolds and ladders, and emergencies.

    También se vende por separado
  12. Platform Ladder

    SOP · 7 secciones

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    También se vende por separado
  13. Aquatic Play Equipment Installation

    SWMS · 16 pasos del trabajo

    SWMS for installing aquatic play equipment such as slides, fountains and ground sprays in public areas, from site set-up to emergency response.

    También se vende por separado
  14. Hand Tools

    SOP · 9 secciones

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    También se vende por separado
  15. Earthmoving Equipment

    SWMS · 23 pasos del trabajo

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    También se vende por separado
  16. Electrical New Installation

    SWMS · 20 pasos del trabajo

    SWMS for new electrical installations: planning, site set-up, tools, ladders, live work, excavation, switchboards, testing and emergencies.

    También se vende por separado
  17. Cherry Picker

    SOP · 10 secciones

    Safe operating procedure for a cherry picker: hazards, PPE, inspection, function tests, operation, emergency response and a hazard checklist.

    También se vende por separado
  18. Scissor Lift

    SOP · 10 secciones

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    También se vende por separado
  19. Manual Handling

    SWMS · 18 pasos del trabajo

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    También se vende por separado
  20. Sport-Playground Equipment

    SWMS · 10 pasos del trabajo

    SWMS for installing sporting and playground equipment such as basketball hoops, goal posts and play structures that need excavation and assembly.

    También se vende por separado
  21. Tiling

    SWMS · 14 pasos del trabajo

    Tiling SWMS: 14 job steps covering silica dust, weather, delivery, ladders and scaffold, tile cutting, completion and emergencies.

    También se vende por separado
  22. Shade Sail Installation

    SWMS · 18 pasos del trabajo

    SWMS for shade sail installation: site set-up, materials delivery, post holes, cutting concrete, setting posts, fixing sails at height, fuelling and emergencies.

    También se vende por separado
  23. Concrete Slab on Ground

    SWMS · 17 pasos del trabajo

    Safe work method statement for concrete slab on ground work, covering formwork, fill and steel reinforcement placement, with the hazards and controls for each job step.

    También se vende por separado
  24. Soft-fall Surface Removal and Installation

    SWMS · 14 pasos del trabajo

    SWMS for removing and installing soft-fall surfacing: site set-up, removal, wet pour rubber mixing and laying, refuelling and emergencies.

    También se vende por separado
  25. Roofing Sheeting

    SWMS · 14 pasos del trabajo

    A Roofing Sheeting SWMS covering the hazards and controls for installing a corrugated iron roof and fixing and dismantling roof edge protection.

    También se vende por separado
  26. Mobile Scaffolding

    SOP · 8 secciones

    Safe operating procedure for mobile scaffolding: hazards, PPE, inspection, erecting, moving and dismantling, and a working at height checklist.

    También se vende por separado

Qué cubre

Peligros que cubre

Legislación y normas que cita

Cada SWMS incluye nuestra lista de referencia de legislación y códigos de práctica.

Lo que ahorras

PlantillaPasos del trabajoPor separado
Internal External Lock-Up Fix Stage Carpentry15$89.95 · 1 crédito
Extension Ladder0$89.95 · 1 crédito
Falls Emergency Rescue Plan0$89.95 · 1 crédito
Handheld Power Tools0$89.95 · 1 crédito
Plumbing Drainage18$89.95 · 1 crédito
Rough-in Final Fit-out Plumbing18$89.95 · 1 crédito
Mobile Crane16$89.95 · 1 crédito
Landscape Planting18$89.95 · 1 crédito
Manual Handling0$89.95 · 1 crédito
Paving19$89.95 · 1 crédito
Brick and Block Laying22$89.95 · 1 crédito
Platform Ladder0$89.95 · 1 crédito
Aquatic Play Equipment Installation16$89.95 · 1 crédito
Hand Tools0$89.95 · 1 crédito
Earthmoving Equipment23$89.95 · 1 crédito
Electrical New Installation20$89.95 · 1 crédito
Cherry Picker0$89.95 · 1 crédito
Scissor Lift0$89.95 · 1 crédito
Manual Handling18$89.95 · 1 crédito
Sport-Playground Equipment10$89.95 · 1 crédito
Tiling14$89.95 · 1 crédito
Shade Sail Installation18$89.95 · 1 crédito
Concrete Slab on Ground17$89.95 · 1 crédito
Soft-fall Surface Removal and Installation14$89.95 · 1 crédito
Roofing Sheeting14$89.95 · 1 crédito
Mobile Scaffolding0$89.95 · 1 crédito
Comprando uno por uno$2,338.70 · 26 créditos
En este paquete$1,799.00 · 20 créditos Ahorras $539.70

Opiniones

Todavía no hay opiniones.

Cómo funcionan las plantillas

Pruébalo antes de pagar.

  1. Vista previa gratis

    Los pasos del trabajo, los peligros y la primera tarea de cada plantilla se pueden leer. Sin registrarte.

  2. Prueba el editor

    Adapta un SWMS de demostración con tu empresa, tu trabajo y tu obra, en una computadora o en tu teléfono.

  3. Regístrate gratis

    Tus datos y tu logo se pasan. Esta plantilla se abre ya rellenada.

  4. Usa un crédito o compra una sola vez

    Los planes de pago incluyen créditos de plantilla cada mes. O compra esta para quedártela.