얼리 액세스 혜택:얼리 액세스: 30% 할인, 구독을 유지하는 동안 계속.

혜택 받기

템플릿 문서는 영어로 작성되어 있습니다.

알뜰 팩 · 템플릿 40개

Civil Roadworks

알뜰 팩 · PACK-50316

Civil Roadworks 알뜰 팩 템플릿 미리보기
  • 템플릿 40개
  • 26 가격에 40개
  • 라이브러리 폴더 하나에 모두 담겨 제공

A set of 40 SWMS for road construction and maintenance contractors: kerb and channel, asphalt, road pavement stabilising, traffic line removal, traffic corridors and soil compaction.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost 26 template credits instead of 40.

Tipper and Dog SWMS 미리 보기

Tipper and Dog

SWMSVersion 14
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Energised ElectricalWork on or near energised electrical installations or services
  • Traffic CorridorsWork on, in or adjacent to a road, railway, shipping lane or other traffic corridor in use by traffic other than pedestrians
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Seat Belt

Job steps, hazards and controls

  • Work activity

    Check weather conditions & prepare

    • Hazard

      Extreme weather

      Before controls3 High
      Controls
      • Check weather conditions – do not work in extreme conditions

      • Reschedule works to work in more moderate temperatures.

      After controls2 Moderate
      Responsible
      • SupervisorMaintain awareness of weather conditions
      • OperatorFollow controls
    • Hazard

      Hyperthermia

      Hypothermia

      Before controls3 High
      Controls
      • Ensure vehicle cabin is air-conditioned

      • Workers trained to recognise the symptoms of hyperthermia and hypothermia

      • Hot conditions. Ensure:

        • Suitable protective clothing

        • Sun brim on hard hats

        • Safety glasses - UV rated

        • Use 30+ sunscreen on exposed skin

        • Adequate drinking water

        • Access to shade on breaks

        • Adequate breaks.

      • Cold conditions. Ensure:

        • Schedule warm-up breaks

        • Hold breaks inside

        • Dress warmly in layers

        • Stay dry (wet clothing chills the body rapidly)

        • Workers must get out of the cold as soon as they can if starting to feel symptoms

        • Alcohol, cigarettes, caffeine and certain medications increase susceptibility to cold.

      After controls2 Moderate
      Responsible
      • SupervisorMaintain awareness of weather conditions
      • OperatorFollow controls

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

작업 단계 15개 더: Working alone부터 Emergency response까지

단계마다 위험 요소, 위험도 평가, 관리 조치가 있고, 작업자 서명란도 포함됩니다.

미리 보기 방식

브라우저에서 보이는 모습

이 알뜰 팩 받기

무료로 가입한 뒤 받는 방법을 선택하세요. 모든 문서가 팩 이름으로 된 폴더에 담겨 라이브러리에 들어갑니다.

  • 유료 요금제에 포함

    요금제의 템플릿 크레딧을 사용하세요. 이 팩은 40 대신 26입니다.

    요금제와 가격 비교
  • 한 번 구매하기

    $2,338.70 $3,598.00 한 번 결제로 계속 소유합니다. 무료 요금제에서도 사용할 수 있습니다.

가입에 카드가 필요 없습니다. 얼리 액세스 회원은 모든 요금제에서 30% 할인을 받습니다.

포함 내용

  1. Tipper and Dog

    SWMS · 작업 단계 16개

    Hazards and controls for operating a tip truck and dog trailer, including side tippers, from coupling trailers to tipping, refuelling and emergency response.

    단독으로도 판매
  2. Concrete Kerb - Channel

    SWMS · 작업 단계 16개

    SWMS for installing extruded concrete kerb and channel: site set-up, traffic, plant delivery, subgrade, extrusion, wet cement, refuelling and emergencies.

    단독으로도 판매
  3. Traffic Line Removal

    SWMS · 작업 단계 16개

    Traffic Line Removal SWMS: 16 job steps covering the hazards and controls for removing traffic line markings with mobile plant.

    단독으로도 판매
  4. Earthmoving Equipment

    SWMS · 작업 단계 23개

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    단독으로도 판매
  5. Traffic Corridor - Establishing a Safe Work Zone

    SWMS · 작업 단계 8개

    Traffic corridor SWMS: 8 job steps covering the traffic management plan, safe work zone set-up, traffic controllers, pedestrians and zone takeouts.

    단독으로도 판매
  6. Stabilising Road Pavement

    SWMS · 작업 단계 16개

    SWMS for stabilising a road pavement: planning, set-up near roads, machinery, dust control, cement and lime spreading, grading, fuelling and emergencies.

    단독으로도 판매
  7. Hot Asphalt Truck

    SWMS · 작업 단계 11개

    Covers operating a hot asphalt truck for road paving, with the risks and controls for each job step from travel to emergency response.

    단독으로도 판매
  8. Hydro Seeding

    SWMS · 작업 단계 12개

    A SWMS for hydro seeding: the hazards and controls for spreading seed, fertilisers and agricultural chemicals to prepared seedbeds with a hydroseeder.

    단독으로도 판매
  9. Site Mobilisation

    SWMS · 작업 단계 13개

    Site Mobilisation SWMS: 13 job steps for packing, transporting and unloading shipping containers by road vehicle, covering mobile plant, power lines and fuelling.

    단독으로도 판매
  10. Surveyor

    SWMS · 작업 단계 14개

    Surveyor SWMS: 14 job steps covering laser operation, rail, road and water work, remote and public areas, mobile plant and emergency response.

    단독으로도 판매
  11. Soil Compactor

    SWMS · 작업 단계 19개

    SWMS for soil compactor work: weather, site set-up, overhead lines, slopes, silica dust, refuelling, ground workers and emergency response.

    단독으로도 판매
  12. Water Cart

    SWMS · 작업 단계 14개

    SWMS for diesel or petrol water cart work: travel, filling from a hydrant, dust suppression, working near plant, refuelling and emergencies.

    단독으로도 판매
  13. Soil Testing

    SWMS · 작업 단계 11개

    Soil Testing SWMS: 11 job steps from remote travel and set-up to soil testing, mobile plant, completion and emergency response.

    단독으로도 판매
  14. Asphalt Concrete Road Application and Repairs

    SWMS · 작업 단계 18개

    SWMS for asphalt and concrete road application and repairs: site set-up, traffic, power lines, cutting, applying material, fuelling and emergencies.

    단독으로도 판매
  15. Trench Excavation

    SWMS · 작업 단계 15개

    Trench Excavation SWMS: 15 job steps covering excavating and working in trenches over 1.5 m deep, from planning to emergency response.

    단독으로도 판매
  16. Silica Dust

    SWMS · 작업 단계 14개

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    단독으로도 판매
  17. Trailer Mounted Hydro Excavator

    SWMS · 작업 단계 20개

    Trailer mounted hydro excavator SWMS: 20 job steps from coupling the trailer to hydro jetting, vacuum operation, unloading and emergencies.

    단독으로도 판매
  18. Road Profiler Machine

    SWMS · 작업 단계 23개

    Road Profiler Machine SWMS: 23 job steps covering silica dust, mobile plant, power lines, underground services, roadside work and emergencies.

    단독으로도 판매
  19. Road Safety Barrier Installation

    SWMS · 작업 단계 21개

    Safe work method statement for installing road safety barriers: 21 job steps from planning and traffic control to post driving, silica dust and emergencies.

    단독으로도 판매
  20. Roller Operation

    SWMS · 작업 단계 17개

    Roller Operation SWMS: 17 job steps covering drum and multi-wheel rollers on roadworks, from site set-up and power lines to maintenance and emergencies.

    단독으로도 판매
  21. Mobile Plant Working Near-Around

    SWMS · 작업 단계 8개

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    단독으로도 판매
  22. Civil Shoulder Grading

    SWMS · 작업 단계 17개

    SWMS for road shoulder grading with a grader, water cart and roller: float transport, traffic, dust control, gravel, compaction, refuelling and emergencies.

    단독으로도 판매
  23. Bollard Speed Bump Tactile Paving

    SWMS · 작업 단계 15개

    SWMS for installing bollards, speed bumps and tactile paving at crossings, pedestrian islands, vehicle crossovers, railway platforms and car parks.

    단독으로도 판매
  24. Scraper-Dozer-Grader

    SWMS · 작업 단계 20개

    SWMS for scraper, dozer and grader work: site set-up, machine operation, slopes, power lines, underground services, refuelling and emergencies.

    단독으로도 판매
  25. Asphalt Paver

    SWMS · 작업 단계 13개

    Asphalt Paver SWMS: 13 job steps covering hot mix paving, delivery and crane lifting, hot mix and fuel hazards, overhead lines, traffic and emergencies.

    단독으로도 판매
  26. Spotter

    SWMS · 작업 단계 11개

    SWMS for spotters and safety observers: traffic and mobile plant, work near overhead and underground assets, scaffolding and EWPs, roll-over and first aid.

    단독으로도 판매
  27. Nuclear Densometer

    SWMS · 작업 단계 12개

    Nuclear Densometer SWMS: 12 job steps covering storage, transport, radiation exposure, mobile plant, trenches and emergencies.

    단독으로도 판매
  28. Lasers

    SWMS · 작업 단계 9개

    Lasers SWMS: 9 job steps covering Class 1, 2 and 3R construction lasers, beam set-up, eye injury, mobile plant, roadside work and emergencies.

    단독으로도 판매
  29. Horizontal Directional Boring

    SWMS · 작업 단계 16개

    SWMS for horizontal directional boring: locating underground services, drilling, service strikes, rig maintenance, refuelling and emergencies.

    단독으로도 판매
  30. Sediment Fencing

    SWMS · 작업 단계 18개

    SWMS for installing sediment and safety fencing: machine set-up, wire straining, nail and staple guns, refuelling and emergency response.

    단독으로도 판매
  31. Line Marking

    SWMS · 작업 단계 13개

    Line Marking SWMS: 13 job steps for airless line marking on concrete and bitumen, covering traffic, paint, fuel, plant and emergencies.

    단독으로도 판매
  32. Civil Road Base and Seal

    SWMS · 작업 단계 18개

    Civil road base and seal SWMS covering 18 job steps, from site set-up and machinery delivery to compaction, sealing, fuelling and emergencies.

    단독으로도 판매
  33. Construction Night Works

    SWMS · 작업 단계 4개

    SWMS for general construction work at night: planning, work area set-up, night works and emergency response, with lighting, plant and fatigue controls.

    단독으로도 판매
  34. Light Vehicle on Construction

    SWMS · 작업 단계 16개

    Light Vehicle on Construction SWMS: 16 job steps covering travel, loading, fuelling, breakdowns, accidents, mobile plant and emergencies.

    단독으로도 판매
  35. Site Establishment

    SWMS · 작업 단계 11개

    Site Establishment SWMS: 11 job steps from planning and traffic management to tools, site set-up, working at height and emergency response.

    단독으로도 판매
  36. Guided Boring Pipe Jacking Works

    SWMS · 작업 단계 17개

    A SWMS for guided boring and pipe jacking works: the hazards and controls for excavating launch and retrieval pits, hoisting and running the machine.

    단독으로도 판매
  37. Excavation Near Assets

    SWMS · 작업 단계 13개

    SWMS for excavating near underground services and assets: site planning, survey, work area set-up, contact with utilities and emergency response.

    단독으로도 판매
  38. Manual Handling

    SWMS · 작업 단계 18개

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    단독으로도 판매
  39. Confined Space Work

    SWMS · 작업 단계 10개

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    단독으로도 판매
  40. Bulk Excavations

    SWMS · 작업 단계 13개

    SWMS for bulk excavation work: planning, plant operation, shoring, water-charged ground, silica dust, re-fuelling, environmental controls and emergencies.

    단독으로도 판매

다루는 내용

다루는 위험 요소

참조하는 법령 및 표준

모든 SWMS에는 관련 법령 및 실무 규정(code of practice) 참조 목록이 포함됩니다.

절약 금액

템플릿작업 단계단독 구매
Tipper and Dog16$89.95 · 1크레딧
Concrete Kerb - Channel16$89.95 · 1크레딧
Traffic Line Removal16$89.95 · 1크레딧
Earthmoving Equipment23$89.95 · 1크레딧
Traffic Corridor - Establishing a Safe Work Zone8$89.95 · 1크레딧
Stabilising Road Pavement16$89.95 · 1크레딧
Hot Asphalt Truck11$89.95 · 1크레딧
Hydro Seeding12$89.95 · 1크레딧
Site Mobilisation13$89.95 · 1크레딧
Surveyor14$89.95 · 1크레딧
Soil Compactor19$89.95 · 1크레딧
Water Cart14$89.95 · 1크레딧
Soil Testing11$89.95 · 1크레딧
Asphalt Concrete Road Application and Repairs18$89.95 · 1크레딧
Trench Excavation15$89.95 · 1크레딧
Silica Dust14$89.95 · 1크레딧
Trailer Mounted Hydro Excavator20$89.95 · 1크레딧
Road Profiler Machine23$89.95 · 1크레딧
Road Safety Barrier Installation21$89.95 · 1크레딧
Roller Operation17$89.95 · 1크레딧
Mobile Plant Working Near-Around8$89.95 · 1크레딧
Civil Shoulder Grading17$89.95 · 1크레딧
Bollard Speed Bump Tactile Paving15$89.95 · 1크레딧
Scraper-Dozer-Grader20$89.95 · 1크레딧
Asphalt Paver13$89.95 · 1크레딧
Spotter11$89.95 · 1크레딧
Nuclear Densometer12$89.95 · 1크레딧
Lasers9$89.95 · 1크레딧
Horizontal Directional Boring16$89.95 · 1크레딧
Sediment Fencing18$89.95 · 1크레딧
Line Marking13$89.95 · 1크레딧
Civil Road Base and Seal18$89.95 · 1크레딧
Construction Night Works4$89.95 · 1크레딧
Light Vehicle on Construction16$89.95 · 1크레딧
Site Establishment11$89.95 · 1크레딧
Guided Boring Pipe Jacking Works17$89.95 · 1크레딧
Excavation Near Assets13$89.95 · 1크레딧
Manual Handling18$89.95 · 1크레딧
Confined Space Work10$89.95 · 1크레딧
Bulk Excavations13$89.95 · 1크레딧
하나씩 구매 시$3,598.00 · 40크레딧
이 팩으로 구매 시$2,338.70 · 26크레딧 $1,259.30 절약

리뷰

아직 리뷰가 없습니다.

템플릿 이용 방법

먼저 써 보고 결제하세요.

  1. 무료 미리 보기

    모든 템플릿의 작업 단계, 위험 요소, 첫 번째 작업 내용을 자유롭게 볼 수 있습니다. 가입이 필요 없습니다.

  2. 에디터 써 보기

    컴퓨터나 휴대폰에서 데모 SWMS에 회사, 작업, 현장 정보를 넣어 보세요.

  3. 무료 가입

    입력한 정보와 로고가 그대로 옮겨집니다. 이 템플릿이 정보가 채워진 상태로 열립니다.

  4. 크레딧 사용 또는 한 번 구매

    유료 요금제에는 매달 템플릿 크레딧이 포함됩니다. 또는 이 템플릿만 구매해 계속 소유하세요.