얼리 액세스 혜택:얼리 액세스: 30% 할인, 구독을 유지하는 동안 계속.

혜택 받기

템플릿 문서는 영어로 작성되어 있습니다.

알뜰 팩 · 템플릿 20개

Cleaners Combo

알뜰 팩 · PACK-50350

Cleaners Combo 알뜰 팩 템플릿 미리보기
  • 템플릿 20개
  • 16 가격에 20개
  • 라이브러리 폴더 하나에 모두 담겨 제공

A set of nine SWMS and 11 SOPs for commercial and general cleaners.

The SWMS cover general cleaning, carpets and upholstery, public areas, final cleans before handover and high pressure water cleaning. The SOPs include Cleaning Ovens, Cleaning Refrigerator Freezers and Cleaning Private Residences.

Each document is the same one sold on its own, so you get every update to it. Together they cost 16 template credits instead of 20.

General Cleaning SWMS 미리 보기

General Cleaning

SWMSVersion 9
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

None listed.

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/Review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing Risks of Hazardous Chemicals in the Workplace) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025
  • Work Health and Safety (Managing Risks of Hazardous Chemicals in the Workplace Code of Practice) Approval 2022

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing Risks of Hazardous Chemicals in the Workplace Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Managing risks of hazardous chemicals in the workplace code of practice 2022
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing risks of hazardous chemicals in the workplace Code of Practice 2020
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing Risks of Hazardous Chemicals in the Workplace: Code of practice 2024
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024
  • Managing Risks of Hazardous Chemicals in the Workplace - Code of practice 2018

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing risks of hazardous chemicals in the workplace – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • Hand Protection
  • Protective Clothing

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Out-of-hours / night work

    • Hazard
      • Fatigue

      • Unauthorised access

      • Insecure workplace

      Before controls3 High
      Controls
      • Allow adequate meal breaks for workers; especially if they have worked during part of the day, they will need time to rest & recover sufficiently to work safely into the evening/night

      • Do not schedule full double shifts for workers as worker fatigue increases the risk of incidents

      • Workers have access to:

        • Suitable amenities (toilets/wash facilities/drinking water)

        • Sufficient lighting (including parking areas)

        • Air conditioning and heating

        • Mechanical ventilation if required

        • Emergency exits

        • Safe area for parking/unloading equipment – protected from rain

      • Additional security personnel on-site to ensure no unauthorised access by the general public while work is being performed

      • No worker should work alone on the site at night.

      After controls2 Moderate
      Responsible
      • SupervisorMake sure schedules for breaks are followed and maintain call log
    • Hazard

      Emergency

      Before controls4 Acute
      Controls
      • Avoid people working alone, use a buddy system to provide immediate support

      • Have a reliable communication system in place and test regularly.

      After controls2 Moderate
      Responsible
      • SupervisorMake sure schedules for breaks are followed and maintain call log

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

작업 단계 8개 더: Arrival on-site & assess onsite conditions부터 Emergency response까지

단계마다 위험 요소, 위험도 평가, 관리 조치가 있고, 작업자 서명란도 포함됩니다.

미리 보기 방식

브라우저에서 보이는 모습

이 알뜰 팩 받기

무료로 가입한 뒤 받는 방법을 선택하세요. 모든 문서가 팩 이름으로 된 폴더에 담겨 라이브러리에 들어갑니다.

  • 유료 요금제에 포함

    요금제의 템플릿 크레딧을 사용하세요. 이 팩은 20 대신 16입니다.

    요금제와 가격 비교
  • 한 번 구매하기

    $1,439.20 $1,799.00 한 번 결제로 계속 소유합니다. 무료 요금제에서도 사용할 수 있습니다.

가입에 카드가 필요 없습니다. 얼리 액세스 회원은 모든 요금제에서 30% 할인을 받습니다.

포함 내용

  1. General Cleaning

    SWMS · 작업 단계 9개

    SWMS covering the hazards and controls of general cleaning, including offices: night work, manual tasks, sharps, cleaning chemicals and wet floors.

    단독으로도 판매
  2. Cleaning Ovens

    SOP · 섹션 7개

    Safe operating procedure for cleaning ovens: hazards, operator training, chemicals, preparation, step-by-step cleaning and a training register.

    단독으로도 판매
  3. Final Building Clean Before Handover to Client

    SWMS · 작업 단계 10개

    SWMS for the final clean of a building before handover: site set-up, mobile plant, trestles and ladders, cleaning chemicals, manual tasks, dust and sharps.

    단독으로도 판매
  4. Cleaning Public Areas

    SWMS · 작업 단계 13개

    SWMS for cleaning public areas such as shopping centres and building foyers: manual tasks, spills, sharps, floor polishers, scrubbers and emergencies.

    단독으로도 판매
  5. Cleaning Refrigerator Freezers

    SOP · 섹션 6개

    Safe operating procedure for cleaning domestic refrigerators and freezers: hazards, precautions, pre-operational inspection and cleaning steps.

    단독으로도 판매
  6. High Pressure Water Cleaner

    SWMS · 작업 단계 10개

    SWMS for high-pressure water jet cleaning: site set-up, hot water and steam, electric and fuel units, refuelling, hazardous materials and emergencies.

    단독으로도 판매
  7. Cleaning Private Residences

    SOP · 섹션 7개

    Safe operating procedure for cleaning private residences: hazards, PPE, operator training, chemicals, step-by-step cleaning and a training register.

    단독으로도 판매
  8. Manual Handling

    SOP · 섹션 5개

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    단독으로도 판매
  9. Construction Site Amenities Cleaning

    SWMS · 작업 단계 10개

    SWMS for cleaning construction site amenities: travel on-site, biological hazards, manual tasks, chemicals, work from platform ladders and emergencies.

    단독으로도 판매
  10. Platform Ladder

    SOP · 섹션 7개

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    단독으로도 판매
  11. Hand Tools

    SOP · 섹션 9개

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    단독으로도 판매
  12. Wet Dry Vacuum Cleaner

    SOP · 섹션 7개

    Safe operating procedure for wet-dry vacuum cleaners: hazards, operator training, pre-use inspection, safe operation and maintenance.

    단독으로도 판매
  13. Cleaning Carpets and Upholstery

    SWMS · 작업 단계 9개

    Covers hazards and controls for carpet and upholstery cleaning at commercial premises and private residences, by steam or bonnet cleaning.

    단독으로도 판매
  14. Cleaning Domestic Bathrooms

    SOP · 섹션 7개

    Safe operating procedure for cleaning domestic bathrooms: hazards, PPE, training, chemicals, step-by-step cleaning and a training register.

    단독으로도 판매
  15. Manual Handling

    SWMS · 작업 단계 18개

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    단독으로도 판매
  16. Cleaning Public Restrooms

    SOP · 섹션 9개

    Safe operating procedure for cleaning public restrooms: hazards, PPE, precautions, chemicals, step-by-step cleaning and a training register.

    단독으로도 판매
  17. Cleaning Public Park Amenities

    SWMS · 작업 단계 15개

    Cleaning Public Park Amenities SWMS: 15 job steps covering restrooms, barbecues, pressure cleaning, refuelling, spills and sharps.

    단독으로도 판매
  18. Waterfed Pole System

    SWMS · 작업 단계 12개

    SWMS for cleaning with a water-fed pole system: overhead power lines, set-up beside traffic, tools, fuelling small engines and emergency response.

    단독으로도 판매
  19. Cleaning Small Appliances

    SOP · 섹션 6개

    A safe operating procedure for cleaning small appliances: hazards, inspection, precautions, chemicals and cleaning steps for each appliance.

    단독으로도 판매
  20. Sharps and Needle Stick Injury

    SOP · 섹션 8개

    Safe operating procedure for sharps and needle stick injury: hazards, PPE, precautions, handling, disposal, emergency response and a training register.

    단독으로도 판매

다루는 내용

다루는 위험 요소

참조하는 법령 및 표준

모든 SWMS에는 관련 법령 및 실무 규정(code of practice) 참조 목록이 포함됩니다.

절약 금액

템플릿작업 단계단독 구매
General Cleaning9$89.95 · 1크레딧
Cleaning Ovens0$89.95 · 1크레딧
Final Building Clean Before Handover to Client10$89.95 · 1크레딧
Cleaning Public Areas13$89.95 · 1크레딧
Cleaning Refrigerator Freezers0$89.95 · 1크레딧
High Pressure Water Cleaner10$89.95 · 1크레딧
Cleaning Private Residences0$89.95 · 1크레딧
Manual Handling0$89.95 · 1크레딧
Construction Site Amenities Cleaning10$89.95 · 1크레딧
Platform Ladder0$89.95 · 1크레딧
Hand Tools0$89.95 · 1크레딧
Wet Dry Vacuum Cleaner0$89.95 · 1크레딧
Cleaning Carpets and Upholstery9$89.95 · 1크레딧
Cleaning Domestic Bathrooms0$89.95 · 1크레딧
Manual Handling18$89.95 · 1크레딧
Cleaning Public Restrooms0$89.95 · 1크레딧
Cleaning Public Park Amenities15$89.95 · 1크레딧
Waterfed Pole System12$89.95 · 1크레딧
Cleaning Small Appliances0$89.95 · 1크레딧
Sharps and Needle Stick Injury0$89.95 · 1크레딧
하나씩 구매 시$1,799.00 · 20크레딧
이 팩으로 구매 시$1,439.20 · 16크레딧 $359.80 절약

리뷰

아직 리뷰가 없습니다.

템플릿 이용 방법

먼저 써 보고 결제하세요.

  1. 무료 미리 보기

    모든 템플릿의 작업 단계, 위험 요소, 첫 번째 작업 내용을 자유롭게 볼 수 있습니다. 가입이 필요 없습니다.

  2. 에디터 써 보기

    컴퓨터나 휴대폰에서 데모 SWMS에 회사, 작업, 현장 정보를 넣어 보세요.

  3. 무료 가입

    입력한 정보와 로고가 그대로 옮겨집니다. 이 템플릿이 정보가 채워진 상태로 열립니다.

  4. 크레딧 사용 또는 한 번 구매

    유료 요금제에는 매달 템플릿 크레딧이 포함됩니다. 또는 이 템플릿만 구매해 계속 소유하세요.