얼리 액세스 혜택:얼리 액세스: 30% 할인, 구독을 유지하는 동안 계속.

혜택 받기

템플릿 문서는 영어로 작성되어 있습니다.

에디터 무료로 써 보기
알뜰 팩 · 템플릿 26개

Playground Construction Combo

알뜰 팩 · PACK-50327

Playground Construction Combo 알뜰 팩 템플릿 미리보기
  • 템플릿 26개
  • 20 가격에 26개
  • 라이브러리 폴더 하나에 모두 담겨 제공

A set of 17 SWMS, eight SOPs and one plan for playground builders and installers.

The SWMS cover play equipment installation, soft-fall surfaces, paving, landscape planting, earthmoving and brick and block laying. The SOPs include Mobile Scaffolding, Extension Ladder and Handheld Power Tools. It also includes Falls Emergency Rescue Plan.

Each document is the same one sold on its own, so you get every update to it. Together they cost 20 template credits instead of 26.

Internal External Lock-Up Fix Stage Carpentry SWMS 미리 보기

Internal External Lock-Up Fix Stage Carpentry

SWMSVersion 10
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column):

  • Mobile PlantMobile plant movement
  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous LinesChemical, fuel or refrigerant lines
  • Energised ElectricalEnergised electrical installations or services
  • FallsInvolves a risk of a person falling from 2m or more
  • Telecom TowersIncluding work on telecommunications towers

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers are trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract.

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences.

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards are identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

(add site-specific notes)

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Provide training on the health effects associated with RCS

    • Hazard

      Exposure to respirable crystalline silica (RCS) – dust inhalation

      Before controls3 High
      Controls
      • Training and Information provided to workers on RCS should include the following:

        • Identification of RCS dust through Material/Safety Datasheet (M/SDS) or labels

        • Dust exposure prevention

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes)

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

작업 단계 14개 더: Check weather conditions & prepare부터 Emergency response까지

단계마다 위험 요소, 위험도 평가, 관리 조치가 있고, 작업자 서명란도 포함됩니다.

미리 보기 방식

브라우저에서 보이는 모습

이 알뜰 팩 받기

무료로 가입한 뒤 받는 방법을 선택하세요. 모든 문서가 팩 이름으로 된 폴더에 담겨 라이브러리에 들어갑니다.

  • 유료 요금제에 포함

    요금제의 템플릿 크레딧을 사용하세요. 이 팩은 26 대신 20입니다.

    요금제와 가격 비교
  • 한 번 구매하기

    $1,799.00 $2,338.70 한 번 결제로 계속 소유합니다. 무료 요금제에서도 사용할 수 있습니다.

가입에 카드가 필요 없습니다. 얼리 액세스 회원은 모든 요금제에서 30% 할인을 받습니다.

포함 내용

  1. Internal External Lock-Up Fix Stage Carpentry

    SWMS · 작업 단계 15개

    Covers internal and external lock-up and fix stage carpentry, with the risks and controls for each job step from site arrival to emergency response.

    단독으로도 판매
  2. Extension Ladder

    SOP · 섹션 7개

    Extension ladder safe operating procedure: hazards, pre-use inspection, transporting, set-up, use and carrying, with a training register.

    단독으로도 판매
  3. Falls Emergency Rescue Plan

    관리 계획서 · 섹션 14개

    A pre-planned procedure for rescuing a worker who has fallen and is suspended in a harness, with a pre-planning checklist and a site-specific rescue plan.

    단독으로도 판매
  4. Handheld Power Tools

    SOP · 섹션 9개

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    단독으로도 판매
  5. Plumbing Drainage

    SWMS · 작업 단계 18개

    Plumbing drainage SWMS for installing pipes, stormwater tanks and polyethylene pipe welding, and for sewage and stormwater drainage on civil works.

    단독으로도 판매
  6. Rough-in Final Fit-out Plumbing

    SWMS · 작업 단계 18개

    Rough-in Final Fit-out Plumbing SWMS: 18 job steps covering pipework, appliances and fixtures, excavation, hot work, silica dust and emergencies.

    단독으로도 판매
  7. Mobile Crane

    SWMS · 작업 단계 16개

    Mobile Crane SWMS: 16 job steps covering power lines, set-up, load equipment checks, lifting, maintenance, refuelling and emergencies.

    단독으로도 판매
  8. Landscape Planting

    SWMS · 작업 단계 18개

    SWMS for landscape planting on roadsides and public sites: traffic, mobile plant, tools, soil and mulch, slopes, weather and emergencies.

    단독으로도 판매
  9. Manual Handling

    SOP · 섹션 5개

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    단독으로도 판매
  10. Paving

    SWMS · 작업 단계 19개

    Paving SWMS: 19 job steps covering subgrade preparation, cutting and laying pavers, silica dust, cement, acid washing and emergencies.

    단독으로도 판매
  11. Brick and Block Laying

    SWMS · 작업 단계 22개

    SWMS for brick and block laying: silica dust, materials delivery, mortar, cutting and laying, core steel, acid washing, scaffolds and ladders, and emergencies.

    단독으로도 판매
  12. Platform Ladder

    SOP · 섹션 7개

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    단독으로도 판매
  13. Aquatic Play Equipment Installation

    SWMS · 작업 단계 16개

    SWMS for installing aquatic play equipment such as slides, fountains and ground sprays in public areas, from site set-up to emergency response.

    단독으로도 판매
  14. Hand Tools

    SOP · 섹션 9개

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    단독으로도 판매
  15. Earthmoving Equipment

    SWMS · 작업 단계 23개

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    단독으로도 판매
  16. Electrical New Installation

    SWMS · 작업 단계 20개

    SWMS for new electrical installations: planning, site set-up, tools, ladders, live work, excavation, switchboards, testing and emergencies.

    단독으로도 판매
  17. Cherry Picker

    SOP · 섹션 10개

    Safe operating procedure for a cherry picker: hazards, PPE, inspection, function tests, operation, emergency response and a hazard checklist.

    단독으로도 판매
  18. Scissor Lift

    SOP · 섹션 10개

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    단독으로도 판매
  19. Manual Handling

    SWMS · 작업 단계 18개

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    단독으로도 판매
  20. Sport-Playground Equipment

    SWMS · 작업 단계 10개

    SWMS for installing sporting and playground equipment such as basketball hoops, goal posts and play structures that need excavation and assembly.

    단독으로도 판매
  21. Tiling

    SWMS · 작업 단계 14개

    Tiling SWMS: 14 job steps covering silica dust, weather, delivery, ladders and scaffold, tile cutting, completion and emergencies.

    단독으로도 판매
  22. Shade Sail Installation

    SWMS · 작업 단계 18개

    SWMS for shade sail installation: site set-up, materials delivery, post holes, cutting concrete, setting posts, fixing sails at height, fuelling and emergencies.

    단독으로도 판매
  23. Concrete Slab on Ground

    SWMS · 작업 단계 17개

    Safe work method statement for concrete slab on ground work, covering formwork, fill and steel reinforcement placement, with the hazards and controls for each job step.

    단독으로도 판매
  24. Soft-fall Surface Removal and Installation

    SWMS · 작업 단계 14개

    SWMS for removing and installing soft-fall surfacing: site set-up, removal, wet pour rubber mixing and laying, refuelling and emergencies.

    단독으로도 판매
  25. Roofing Sheeting

    SWMS · 작업 단계 14개

    A Roofing Sheeting SWMS covering the hazards and controls for installing a corrugated iron roof and fixing and dismantling roof edge protection.

    단독으로도 판매
  26. Mobile Scaffolding

    SOP · 섹션 8개

    Safe operating procedure for mobile scaffolding: hazards, PPE, inspection, erecting, moving and dismantling, and a working at height checklist.

    단독으로도 판매

다루는 내용

다루는 위험 요소

참조하는 법령 및 표준

모든 SWMS에는 관련 법령 및 실무 규정(code of practice) 참조 목록이 포함됩니다.

절약 금액

템플릿작업 단계단독 구매
Internal External Lock-Up Fix Stage Carpentry15$89.95 · 1크레딧
Extension Ladder0$89.95 · 1크레딧
Falls Emergency Rescue Plan0$89.95 · 1크레딧
Handheld Power Tools0$89.95 · 1크레딧
Plumbing Drainage18$89.95 · 1크레딧
Rough-in Final Fit-out Plumbing18$89.95 · 1크레딧
Mobile Crane16$89.95 · 1크레딧
Landscape Planting18$89.95 · 1크레딧
Manual Handling0$89.95 · 1크레딧
Paving19$89.95 · 1크레딧
Brick and Block Laying22$89.95 · 1크레딧
Platform Ladder0$89.95 · 1크레딧
Aquatic Play Equipment Installation16$89.95 · 1크레딧
Hand Tools0$89.95 · 1크레딧
Earthmoving Equipment23$89.95 · 1크레딧
Electrical New Installation20$89.95 · 1크레딧
Cherry Picker0$89.95 · 1크레딧
Scissor Lift0$89.95 · 1크레딧
Manual Handling18$89.95 · 1크레딧
Sport-Playground Equipment10$89.95 · 1크레딧
Tiling14$89.95 · 1크레딧
Shade Sail Installation18$89.95 · 1크레딧
Concrete Slab on Ground17$89.95 · 1크레딧
Soft-fall Surface Removal and Installation14$89.95 · 1크레딧
Roofing Sheeting14$89.95 · 1크레딧
Mobile Scaffolding0$89.95 · 1크레딧
하나씩 구매 시$2,338.70 · 26크레딧
이 팩으로 구매 시$1,799.00 · 20크레딧 $539.70 절약

리뷰

아직 리뷰가 없습니다.

템플릿 이용 방법

먼저 써 보고 결제하세요.

  1. 무료 미리 보기

    모든 템플릿의 작업 단계, 위험 요소, 첫 번째 작업 내용을 자유롭게 볼 수 있습니다. 가입이 필요 없습니다.

  2. 에디터 써 보기

    컴퓨터나 휴대폰에서 데모 SWMS에 회사, 작업, 현장 정보를 넣어 보세요.

  3. 무료 가입

    입력한 정보와 로고가 그대로 옮겨집니다. 이 템플릿이 정보가 채워진 상태로 열립니다.

  4. 크레딧 사용 또는 한 번 구매

    유료 요금제에는 매달 템플릿 크레딧이 포함됩니다. 또는 이 템플릿만 구매해 계속 소유하세요.