얼리 액세스 혜택:얼리 액세스: 30% 할인, 구독을 유지하는 동안 계속.

혜택 받기

템플릿 문서는 영어로 작성되어 있습니다.

알뜰 팩 · 템플릿 23개

Plumbing

알뜰 팩 · PACK-50064

Plumbing 알뜰 팩 템플릿 미리보기
  • 템플릿 23개
  • 16 가격에 23개
  • 라이브러리 폴더 하나에 모두 담겨 제공

A set of 23 SWMS for plumbers: drainage, rough-in and final fit-out, trench excavation, water jetting, CCTV drain inspection and pumps and valves.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost 16 template credits instead of 23.

Height Access Equipment SWMS 미리 보기

Height Access Equipment

SWMSVersion 11
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures for unanticipated hazards.

      After controls2 Moderate
      Responsible
      • SupervisorCheck the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

작업 단계 16개 더: Work area set-up부터 Emergency response까지

단계마다 위험 요소, 위험도 평가, 관리 조치가 있고, 작업자 서명란도 포함됩니다.

미리 보기 방식

브라우저에서 보이는 모습

이 알뜰 팩 받기

무료로 가입한 뒤 받는 방법을 선택하세요. 모든 문서가 팩 이름으로 된 폴더에 담겨 라이브러리에 들어갑니다.

  • 유료 요금제에 포함

    요금제의 템플릿 크레딧을 사용하세요. 이 팩은 23 대신 16입니다.

    요금제와 가격 비교
  • 한 번 구매하기

    $1,439.20 $2,068.85 한 번 결제로 계속 소유합니다. 무료 요금제에서도 사용할 수 있습니다.

가입에 카드가 필요 없습니다. 얼리 액세스 회원은 모든 요금제에서 30% 할인을 받습니다.

포함 내용

  1. Height Access Equipment

    SWMS · 작업 단계 17개

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    단독으로도 판매
  2. Roof Work

    SWMS · 작업 단계 14개

    SWMS for roof work: hazards and controls for falls from height, asbestos, access by scaffold, ladder or hatch, harness use, tools and emergencies.

    단독으로도 판매
  3. Mobile Plant Working Near-Around

    SWMS · 작업 단계 8개

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    단독으로도 판매
  4. Trench Excavation

    SWMS · 작업 단계 15개

    Trench Excavation SWMS: 15 job steps covering excavating and working in trenches over 1.5 m deep, from planning to emergency response.

    단독으로도 판매
  5. Plumbing Drainage

    SWMS · 작업 단계 18개

    Plumbing drainage SWMS for installing pipes, stormwater tanks and polyethylene pipe welding, and for sewage and stormwater drainage on civil works.

    단독으로도 판매
  6. CCTV Drain Inspection

    SWMS · 작업 단계 12개

    Covers the hazards and controls for inspecting drains using CCTV technology, with the risks and controls for each job step from weather checks to emergency response.

    단독으로도 판매
  7. Rough-in Final Fit-out Plumbing

    SWMS · 작업 단계 18개

    Rough-in Final Fit-out Plumbing SWMS: 18 job steps covering pipework, appliances and fixtures, excavation, hot work, silica dust and emergencies.

    단독으로도 판매
  8. Water Jetting Drains

    SWMS · 작업 단계 16개

    Hazards and controls for clearing blocked sewers and drains with a truck-mounted hydro-jet, from site set-up and pump use to emergency response.

    단독으로도 판매
  9. Plumbing Suspended Pipework

    SWMS · 작업 단계 18개

    A SWMS for installing suspended pipework from elevating work platforms, covering 18 job steps with their hazards and controls.

    단독으로도 판매
  10. Risers Working In

    SWMS · 작업 단계 12개

    Safe work method statement for working in risers, covering 12 job steps from rescue planning and entry assessment to falls, heat stress and emergencies.

    단독으로도 판매
  11. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 작업 단계 12개

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    단독으로도 판매
  12. Plumbing Pump-Valve Installation

    SWMS · 작업 단계 20개

    A SWMS for removing and installing industrial pumps and valves: lock-out, disconnection, lifting, fitting and pressure testing.

    단독으로도 판매
  13. Plumbing Temporary Services Connection

    SWMS · 작업 단계 17개

    Plumbing Temporary Services Connection SWMS: 17 job steps for temporary water and sewerage connections on construction sites.

    단독으로도 판매
  14. Earthmoving Equipment

    SWMS · 작업 단계 23개

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    단독으로도 판매
  15. Fire Sprinkler System Installation

    SWMS · 작업 단계 19개

    A SWMS for installing fire sprinkler systems from elevating work platforms: EWP operation, working at height, hot work, silica dust and commissioning.

    단독으로도 판매
  16. Electric Fusion - Poly Pipe Butt Welding (PPW)

    SWMS · 작업 단계 11개

    Electric fusion poly pipe butt welding SWMS: 11 job steps covering mobile plant, hazardous atmospheres, hot plate and facer use, and emergencies.

    단독으로도 판매
  17. Powered Non-powered Tools

    SWMS · 작업 단계 12개

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    단독으로도 판매
  18. Plumbing Gas Fitting

    SWMS · 작업 단계 21개

    Plumbing Gas Fitting SWMS: 21 job steps for gas fitting work, from planning and excavation to pipework, purging and pressure testing.

    단독으로도 판매
  19. Manual Handling

    SWMS · 작업 단계 18개

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    단독으로도 판매
  20. Confined Space Work

    SWMS · 작업 단계 10개

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    단독으로도 판매
  21. Plumbing - Water Meter Installation

    SWMS · 작업 단계 16개

    Plumbing SWMS for installing water meters: 16 job steps from site assessment and electrical hazards to excavation, confined space and emergency response.

    단독으로도 판매
  22. Plumbing Drain Re-lining

    SWMS · 작업 단계 14개

    SWMS for drain re-lining: silica dust, confined spaces, mobile plant, resins and air compressors, with controls for 14 job steps.

    단독으로도 판매
  23. Plumbing Call-out

    SWMS · 작업 단계 20개

    Plumbing call-out SWMS: 20 job steps covering general repairs, hot water systems and boilers, gas, hot work, asbestos and working at height.

    단독으로도 판매

다루는 내용

다루는 위험 요소

참조하는 법령 및 표준

모든 SWMS에는 관련 법령 및 실무 규정(code of practice) 참조 목록이 포함됩니다.

절약 금액

템플릿작업 단계단독 구매
Height Access Equipment17$89.95 · 1크레딧
Roof Work14$89.95 · 1크레딧
Mobile Plant Working Near-Around8$89.95 · 1크레딧
Trench Excavation15$89.95 · 1크레딧
Plumbing Drainage18$89.95 · 1크레딧
CCTV Drain Inspection12$89.95 · 1크레딧
Rough-in Final Fit-out Plumbing18$89.95 · 1크레딧
Water Jetting Drains16$89.95 · 1크레딧
Plumbing Suspended Pipework18$89.95 · 1크레딧
Risers Working In12$89.95 · 1크레딧
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1크레딧
Plumbing Pump-Valve Installation20$89.95 · 1크레딧
Plumbing Temporary Services Connection17$89.95 · 1크레딧
Earthmoving Equipment23$89.95 · 1크레딧
Fire Sprinkler System Installation19$89.95 · 1크레딧
Electric Fusion - Poly Pipe Butt Welding (PPW)11$89.95 · 1크레딧
Powered Non-powered Tools12$89.95 · 1크레딧
Plumbing Gas Fitting21$89.95 · 1크레딧
Manual Handling18$89.95 · 1크레딧
Confined Space Work10$89.95 · 1크레딧
Plumbing - Water Meter Installation16$89.95 · 1크레딧
Plumbing Drain Re-lining14$89.95 · 1크레딧
Plumbing Call-out20$89.95 · 1크레딧
하나씩 구매 시$2,068.85 · 23크레딧
이 팩으로 구매 시$1,439.20 · 16크레딧 $629.65 절약

리뷰

  • Great Fit for Our Business! This SWMS pack was great for our small business. It covered everything, even things we hadn't thought of ourselves. The forms were instantly available and didn't take long to adapt to what we needed. Saved us so much time!

    Amy구매 인증

템플릿 이용 방법

먼저 써 보고 결제하세요.

  1. 무료 미리 보기

    모든 템플릿의 작업 단계, 위험 요소, 첫 번째 작업 내용을 자유롭게 볼 수 있습니다. 가입이 필요 없습니다.

  2. 에디터 써 보기

    컴퓨터나 휴대폰에서 데모 SWMS에 회사, 작업, 현장 정보를 넣어 보세요.

  3. 무료 가입

    입력한 정보와 로고가 그대로 옮겨집니다. 이 템플릿이 정보가 채워진 상태로 열립니다.

  4. 크레딧 사용 또는 한 번 구매

    유료 요금제에는 매달 템플릿 크레딧이 포함됩니다. 또는 이 템플릿만 구매해 계속 소유하세요.