Ưu đãi truy cập sớm:Truy cập sớm: giảm 30%, chừng nào bạn vẫn còn đăng ký.

Nhận ưu đãi

Các tài liệu mẫu được soạn bằng tiếng Anh.

Gói tiết kiệm · 35 mẫu

Civil Infrastructure

Gói tiết kiệm · PACK-50317

Xem trước mẫu Gói tiết kiệm Civil Infrastructure
  • 35 mẫu
  • 35 mẫu với giá của 22 mẫu
  • Được đưa vào một thư mục trong Thư viện

A set of 35 SWMS for civil infrastructure contractors: bulk excavation, trenching, concrete piling, concrete pumping, mobile cranes, confined spaces and traffic corridors.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost 22 template credits instead of 35.

Xem trước SWMS Soil Testing

Soil Testing

SWMSVersion 1
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following 'High-Risk Construction Work' (HRCW – identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Traffic CorridorsWork carried out adjacent to a road, railway or shipping lane, traffic corridor

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. Specify?

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Remote area emergency

      Before controls4 Acute
      Controls
      • Prepare a Remote / Isolated Work Plan. A signed copy must be taken by workers to the Remote/Isolated workplace each day, and the responsible supervisor must keep a copy at home base or head office

      • All relevant workers scheduled to work in the remote area are supplied with Personal Location Beacons (PLB)

      • All vehicles used to transport crew to remote locations are carrying Emergency Position Indicating Radio Beacon (EPIRB) onboard vehicle:

        • Cabin roof is marked with a specific identification number (for aerial identification.)

      • Complete a Departure Checklist (refer to Remote / Isolated Work Plan).

      After controls2 Moderate
      Responsible
      • The Organisationwill ensure 'Remote and Isolated Plan' is in place & check the site amenities are in place

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

Thêm 10 bước công việc, từ Travel to/from remote worksite đến Emergency response

Mỗi bước đều có mối nguy, mức rủi ro và biện pháp kiểm soát, cùng phần ký nhận của đội.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy gói tiết kiệm này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Mọi tài liệu sẽ vào Thư viện của bạn, trong một thư mục mang tên gói.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Gói này cần 22 lượt thay vì 35 lượt.

    So sánh các gói và giá
  • Mua một lần

    $1,978.90 $3,148.25 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Gói gồm những gì

  1. Soil Testing

    SWMS · 11 bước công việc

    Soil Testing SWMS: 11 job steps from remote travel and set-up to soil testing, mobile plant, completion and emergency response.

    Cũng bán riêng
  2. Concrete Piling

    SWMS · 17 bước công việc

    Concrete Piling SWMS: 17 job steps for drilling and piling with an excavator, from site set-up and plant movement to the pour and emergency response.

    Cũng bán riêng
  3. Mobile Plant Working Near-Around

    SWMS · 8 bước công việc

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    Cũng bán riêng
  4. Spotter

    SWMS · 11 bước công việc

    SWMS for spotters and safety observers: traffic and mobile plant, work near overhead and underground assets, scaffolding and EWPs, roll-over and first aid.

    Cũng bán riêng
  5. Bulk Excavations

    SWMS · 13 bước công việc

    SWMS for bulk excavation work: planning, plant operation, shoring, water-charged ground, silica dust, re-fuelling, environmental controls and emergencies.

    Cũng bán riêng
  6. Trench Excavation

    SWMS · 15 bước công việc

    Trench Excavation SWMS: 15 job steps covering excavating and working in trenches over 1.5 m deep, from planning to emergency response.

    Cũng bán riêng
  7. Concrete Placement and Finishing

    SWMS · 13 bước công việc

    SWMS for concrete placement and finishing: delivery, pumping and pouring, power lines, mobile plant, cement burns, trowelling machines and emergencies.

    Cũng bán riêng
  8. Mobile Crane

    SWMS · 16 bước công việc

    Mobile Crane SWMS: 16 job steps covering power lines, set-up, load equipment checks, lifting, maintenance, refuelling and emergencies.

    Cũng bán riêng
  9. Concrete Boom or Line Pumping

    SWMS · 15 bước công việc

    SWMS for truck-mounted concrete boom and line pumping: road travel, pump set-up, the pour, clearing line blockages, line cleaning and emergencies.

    Cũng bán riêng
  10. Traffic Corridor - Establishing a Safe Work Zone

    SWMS · 8 bước công việc

    Traffic corridor SWMS: 8 job steps covering the traffic management plan, safe work zone set-up, traffic controllers, pedestrians and zone takeouts.

    Cũng bán riêng
  11. Confined Space Work

    SWMS · 10 bước công việc

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    Cũng bán riêng
  12. Lasers

    SWMS · 9 bước công việc

    Lasers SWMS: 9 job steps covering Class 1, 2 and 3R construction lasers, beam set-up, eye injury, mobile plant, roadside work and emergencies.

    Cũng bán riêng
  13. Guided Boring Pipe Jacking Works

    SWMS · 17 bước công việc

    A SWMS for guided boring and pipe jacking works: the hazards and controls for excavating launch and retrieval pits, hoisting and running the machine.

    Cũng bán riêng
  14. Silica Dust

    SWMS · 14 bước công việc

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    Cũng bán riêng
  15. Surveyor

    SWMS · 14 bước công việc

    Surveyor SWMS: 14 job steps covering laser operation, rail, road and water work, remote and public areas, mobile plant and emergency response.

    Cũng bán riêng
  16. Construction Night Works

    SWMS · 4 bước công việc

    SWMS for general construction work at night: planning, work area set-up, night works and emergency response, with lighting, plant and fatigue controls.

    Cũng bán riêng
  17. Overhead Electric Lines - Working Near

    SWMS · 6 bước công việc

    Overhead Electric Lines SWMS: 6 job steps covering exclusion zones, spotters, mobile plant near powerlines and emergency response.

    Cũng bán riêng
  18. Drilling and Piling

    SWMS · 17 bước công việc

    Drilling and piling SWMS for excavator-based midi drill work: 17 job steps from silica dust training and site arrival to lifting, winching and emergencies.

    Cũng bán riêng
  19. Earthmoving Equipment

    SWMS · 23 bước công việc

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    Cũng bán riêng
  20. Pylon Driving

    SWMS · 19 bước công việc

    Pylon Driving SWMS: 19 job steps for mobile crane and piling work, from training and set-up to lifting, maintenance, fuelling and emergency response.

    Cũng bán riêng
  21. Nuclear Densometer

    SWMS · 12 bước công việc

    Nuclear Densometer SWMS: 12 job steps covering storage, transport, radiation exposure, mobile plant, trenches and emergencies.

    Cũng bán riêng
  22. Dogman

    SWMS · 12 bước công việc

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    Cũng bán riêng
  23. Manual Handling

    SWMS · 18 bước công việc

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    Cũng bán riêng
  24. Formwork Decks-Columns-Stairs

    SWMS · 21 bước công việc

    Formwork Decks-Columns-Stairs SWMS: 21 job steps covering formwork design, tools, working at height, crane lifts, stripping and emergencies.

    Cũng bán riêng
  25. Site Mobilisation

    SWMS · 13 bước công việc

    Site Mobilisation SWMS: 13 job steps for packing, transporting and unloading shipping containers by road vehicle, covering mobile plant, power lines and fuelling.

    Cũng bán riêng
  26. Horizontal Directional Boring

    SWMS · 16 bước công việc

    SWMS for horizontal directional boring: locating underground services, drilling, service strikes, rig maintenance, refuelling and emergencies.

    Cũng bán riêng
  27. Tipper and Dog

    SWMS · 16 bước công việc

    Hazards and controls for operating a tip truck and dog trailer, including side tippers, from coupling trailers to tipping, refuelling and emergency response.

    Cũng bán riêng
  28. Excavation Near Assets

    SWMS · 13 bước công việc

    SWMS for excavating near underground services and assets: site planning, survey, work area set-up, contact with utilities and emergency response.

    Cũng bán riêng
  29. Concrete Pile Removal

    SWMS · 14 bước công việc

    SWMS for concrete pile removal: exposing the pile, cropping, cutting the pile and reo bar, silica dust, overhead lines and excavation collapse.

    Cũng bán riêng
  30. Geofabric Installation

    SWMS · 17 bước công việc

    Geofabric Installation SWMS: 17 job steps covering delivery, crane placement, rolling out, seaming and securing geomembrane on dams and landfills.

    Cũng bán riêng
  31. Light Vehicle on Construction

    SWMS · 16 bước công việc

    Light Vehicle on Construction SWMS: 16 job steps covering travel, loading, fuelling, breakdowns, accidents, mobile plant and emergencies.

    Cũng bán riêng
  32. Mobile Concrete Batching Machine

    SWMS · 12 bước công việc

    SWMS for mobile concrete batching plant work: site set-up, plant operation, maintenance, refuelling and emergencies, with hazards and controls.

    Cũng bán riêng
  33. Soil Compactor

    SWMS · 19 bước công việc

    SWMS for soil compactor work: weather, site set-up, overhead lines, slopes, silica dust, refuelling, ground workers and emergency response.

    Cũng bán riêng
  34. Site Establishment

    SWMS · 11 bước công việc

    Site Establishment SWMS: 11 job steps from planning and traffic management to tools, site set-up, working at height and emergency response.

    Cũng bán riêng
  35. Remote Control Trench Roller

    SWMS · 15 bước công việc

    SWMS for operating a remote control trench roller: transport, set-up, trench work, mobile plant, hydraulics, environment and emergencies.

    Cũng bán riêng

Nội dung bao gồm

Các mối nguy được đề cập

Luật và tiêu chuẩn được dẫn chiếu

Mỗi SWMS đều đi kèm danh sách tham chiếu luật và bộ quy tắc thực hành (codes of practice) của chúng tôi.

Bạn tiết kiệm được gì

MẫuBước công việcMua riêng
Soil Testing11$89.95 · 1 lượt mở mẫu
Concrete Piling17$89.95 · 1 lượt mở mẫu
Mobile Plant Working Near-Around8$89.95 · 1 lượt mở mẫu
Spotter11$89.95 · 1 lượt mở mẫu
Bulk Excavations13$89.95 · 1 lượt mở mẫu
Trench Excavation15$89.95 · 1 lượt mở mẫu
Concrete Placement and Finishing13$89.95 · 1 lượt mở mẫu
Mobile Crane16$89.95 · 1 lượt mở mẫu
Concrete Boom or Line Pumping15$89.95 · 1 lượt mở mẫu
Traffic Corridor - Establishing a Safe Work Zone8$89.95 · 1 lượt mở mẫu
Confined Space Work10$89.95 · 1 lượt mở mẫu
Lasers9$89.95 · 1 lượt mở mẫu
Guided Boring Pipe Jacking Works17$89.95 · 1 lượt mở mẫu
Silica Dust14$89.95 · 1 lượt mở mẫu
Surveyor14$89.95 · 1 lượt mở mẫu
Construction Night Works4$89.95 · 1 lượt mở mẫu
Overhead Electric Lines - Working Near6$89.95 · 1 lượt mở mẫu
Drilling and Piling17$89.95 · 1 lượt mở mẫu
Earthmoving Equipment23$89.95 · 1 lượt mở mẫu
Pylon Driving19$89.95 · 1 lượt mở mẫu
Nuclear Densometer12$89.95 · 1 lượt mở mẫu
Dogman12$89.95 · 1 lượt mở mẫu
Manual Handling18$89.95 · 1 lượt mở mẫu
Formwork Decks-Columns-Stairs21$89.95 · 1 lượt mở mẫu
Site Mobilisation13$89.95 · 1 lượt mở mẫu
Horizontal Directional Boring16$89.95 · 1 lượt mở mẫu
Tipper and Dog16$89.95 · 1 lượt mở mẫu
Excavation Near Assets13$89.95 · 1 lượt mở mẫu
Concrete Pile Removal14$89.95 · 1 lượt mở mẫu
Geofabric Installation17$89.95 · 1 lượt mở mẫu
Light Vehicle on Construction16$89.95 · 1 lượt mở mẫu
Mobile Concrete Batching Machine12$89.95 · 1 lượt mở mẫu
Soil Compactor19$89.95 · 1 lượt mở mẫu
Site Establishment11$89.95 · 1 lượt mở mẫu
Remote Control Trench Roller15$89.95 · 1 lượt mở mẫu
Mua từng mẫu$3,148.25 · 35 lượt mở mẫu
Trong gói này$1,978.90 · 22 lượt mở mẫu Bạn tiết kiệm $1,169.35

Đánh giá

Chưa có đánh giá nào.

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.