Ưu đãi truy cập sớm:Truy cập sớm: giảm 30%, chừng nào bạn vẫn còn đăng ký.

Nhận ưu đãi

Các tài liệu mẫu được soạn bằng tiếng Anh.

Gói tiết kiệm · 40 mẫu

Civil Roadworks

Gói tiết kiệm · PACK-50316

Xem trước mẫu Gói tiết kiệm Civil Roadworks
  • 40 mẫu
  • 40 mẫu với giá của 26 mẫu
  • Được đưa vào một thư mục trong Thư viện

A set of 40 SWMS for road construction and maintenance contractors: kerb and channel, asphalt, road pavement stabilising, traffic line removal, traffic corridors and soil compaction.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost 26 template credits instead of 40.

Xem trước SWMS Tipper and Dog

Tipper and Dog

SWMSVersion 14
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Energised ElectricalWork on or near energised electrical installations or services
  • Traffic CorridorsWork on, in or adjacent to a road, railway, shipping lane or other traffic corridor in use by traffic other than pedestrians
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Seat Belt

Job steps, hazards and controls

  • Work activity

    Check weather conditions & prepare

    • Hazard

      Extreme weather

      Before controls3 High
      Controls
      • Check weather conditions – do not work in extreme conditions

      • Reschedule works to work in more moderate temperatures.

      After controls2 Moderate
      Responsible
      • SupervisorMaintain awareness of weather conditions
      • OperatorFollow controls
    • Hazard

      Hyperthermia

      Hypothermia

      Before controls3 High
      Controls
      • Ensure vehicle cabin is air-conditioned

      • Workers trained to recognise the symptoms of hyperthermia and hypothermia

      • Hot conditions. Ensure:

        • Suitable protective clothing

        • Sun brim on hard hats

        • Safety glasses - UV rated

        • Use 30+ sunscreen on exposed skin

        • Adequate drinking water

        • Access to shade on breaks

        • Adequate breaks.

      • Cold conditions. Ensure:

        • Schedule warm-up breaks

        • Hold breaks inside

        • Dress warmly in layers

        • Stay dry (wet clothing chills the body rapidly)

        • Workers must get out of the cold as soon as they can if starting to feel symptoms

        • Alcohol, cigarettes, caffeine and certain medications increase susceptibility to cold.

      After controls2 Moderate
      Responsible
      • SupervisorMaintain awareness of weather conditions
      • OperatorFollow controls

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

Thêm 15 bước công việc, từ Working alone đến Emergency response

Mỗi bước đều có mối nguy, mức rủi ro và biện pháp kiểm soát, cùng phần ký nhận của đội.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy gói tiết kiệm này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Mọi tài liệu sẽ vào Thư viện của bạn, trong một thư mục mang tên gói.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Gói này cần 26 lượt thay vì 40 lượt.

    So sánh các gói và giá
  • Mua một lần

    $2,338.70 $3,598.00 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Gói gồm những gì

  1. Tipper and Dog

    SWMS · 16 bước công việc

    Hazards and controls for operating a tip truck and dog trailer, including side tippers, from coupling trailers to tipping, refuelling and emergency response.

    Cũng bán riêng
  2. Concrete Kerb - Channel

    SWMS · 16 bước công việc

    SWMS for installing extruded concrete kerb and channel: site set-up, traffic, plant delivery, subgrade, extrusion, wet cement, refuelling and emergencies.

    Cũng bán riêng
  3. Traffic Line Removal

    SWMS · 16 bước công việc

    Traffic Line Removal SWMS: 16 job steps covering the hazards and controls for removing traffic line markings with mobile plant.

    Cũng bán riêng
  4. Earthmoving Equipment

    SWMS · 23 bước công việc

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    Cũng bán riêng
  5. Traffic Corridor - Establishing a Safe Work Zone

    SWMS · 8 bước công việc

    Traffic corridor SWMS: 8 job steps covering the traffic management plan, safe work zone set-up, traffic controllers, pedestrians and zone takeouts.

    Cũng bán riêng
  6. Stabilising Road Pavement

    SWMS · 16 bước công việc

    SWMS for stabilising a road pavement: planning, set-up near roads, machinery, dust control, cement and lime spreading, grading, fuelling and emergencies.

    Cũng bán riêng
  7. Hot Asphalt Truck

    SWMS · 11 bước công việc

    Covers operating a hot asphalt truck for road paving, with the risks and controls for each job step from travel to emergency response.

    Cũng bán riêng
  8. Hydro Seeding

    SWMS · 12 bước công việc

    A SWMS for hydro seeding: the hazards and controls for spreading seed, fertilisers and agricultural chemicals to prepared seedbeds with a hydroseeder.

    Cũng bán riêng
  9. Site Mobilisation

    SWMS · 13 bước công việc

    Site Mobilisation SWMS: 13 job steps for packing, transporting and unloading shipping containers by road vehicle, covering mobile plant, power lines and fuelling.

    Cũng bán riêng
  10. Surveyor

    SWMS · 14 bước công việc

    Surveyor SWMS: 14 job steps covering laser operation, rail, road and water work, remote and public areas, mobile plant and emergency response.

    Cũng bán riêng
  11. Soil Compactor

    SWMS · 19 bước công việc

    SWMS for soil compactor work: weather, site set-up, overhead lines, slopes, silica dust, refuelling, ground workers and emergency response.

    Cũng bán riêng
  12. Water Cart

    SWMS · 14 bước công việc

    SWMS for diesel or petrol water cart work: travel, filling from a hydrant, dust suppression, working near plant, refuelling and emergencies.

    Cũng bán riêng
  13. Soil Testing

    SWMS · 11 bước công việc

    Soil Testing SWMS: 11 job steps from remote travel and set-up to soil testing, mobile plant, completion and emergency response.

    Cũng bán riêng
  14. Asphalt Concrete Road Application and Repairs

    SWMS · 18 bước công việc

    SWMS for asphalt and concrete road application and repairs: site set-up, traffic, power lines, cutting, applying material, fuelling and emergencies.

    Cũng bán riêng
  15. Trench Excavation

    SWMS · 15 bước công việc

    Trench Excavation SWMS: 15 job steps covering excavating and working in trenches over 1.5 m deep, from planning to emergency response.

    Cũng bán riêng
  16. Silica Dust

    SWMS · 14 bước công việc

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    Cũng bán riêng
  17. Trailer Mounted Hydro Excavator

    SWMS · 20 bước công việc

    Trailer mounted hydro excavator SWMS: 20 job steps from coupling the trailer to hydro jetting, vacuum operation, unloading and emergencies.

    Cũng bán riêng
  18. Road Profiler Machine

    SWMS · 23 bước công việc

    Road Profiler Machine SWMS: 23 job steps covering silica dust, mobile plant, power lines, underground services, roadside work and emergencies.

    Cũng bán riêng
  19. Road Safety Barrier Installation

    SWMS · 21 bước công việc

    Safe work method statement for installing road safety barriers: 21 job steps from planning and traffic control to post driving, silica dust and emergencies.

    Cũng bán riêng
  20. Roller Operation

    SWMS · 17 bước công việc

    Roller Operation SWMS: 17 job steps covering drum and multi-wheel rollers on roadworks, from site set-up and power lines to maintenance and emergencies.

    Cũng bán riêng
  21. Mobile Plant Working Near-Around

    SWMS · 8 bước công việc

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    Cũng bán riêng
  22. Civil Shoulder Grading

    SWMS · 17 bước công việc

    SWMS for road shoulder grading with a grader, water cart and roller: float transport, traffic, dust control, gravel, compaction, refuelling and emergencies.

    Cũng bán riêng
  23. Bollard Speed Bump Tactile Paving

    SWMS · 15 bước công việc

    SWMS for installing bollards, speed bumps and tactile paving at crossings, pedestrian islands, vehicle crossovers, railway platforms and car parks.

    Cũng bán riêng
  24. Scraper-Dozer-Grader

    SWMS · 20 bước công việc

    SWMS for scraper, dozer and grader work: site set-up, machine operation, slopes, power lines, underground services, refuelling and emergencies.

    Cũng bán riêng
  25. Asphalt Paver

    SWMS · 13 bước công việc

    Asphalt Paver SWMS: 13 job steps covering hot mix paving, delivery and crane lifting, hot mix and fuel hazards, overhead lines, traffic and emergencies.

    Cũng bán riêng
  26. Spotter

    SWMS · 11 bước công việc

    SWMS for spotters and safety observers: traffic and mobile plant, work near overhead and underground assets, scaffolding and EWPs, roll-over and first aid.

    Cũng bán riêng
  27. Nuclear Densometer

    SWMS · 12 bước công việc

    Nuclear Densometer SWMS: 12 job steps covering storage, transport, radiation exposure, mobile plant, trenches and emergencies.

    Cũng bán riêng
  28. Lasers

    SWMS · 9 bước công việc

    Lasers SWMS: 9 job steps covering Class 1, 2 and 3R construction lasers, beam set-up, eye injury, mobile plant, roadside work and emergencies.

    Cũng bán riêng
  29. Horizontal Directional Boring

    SWMS · 16 bước công việc

    SWMS for horizontal directional boring: locating underground services, drilling, service strikes, rig maintenance, refuelling and emergencies.

    Cũng bán riêng
  30. Sediment Fencing

    SWMS · 18 bước công việc

    SWMS for installing sediment and safety fencing: machine set-up, wire straining, nail and staple guns, refuelling and emergency response.

    Cũng bán riêng
  31. Line Marking

    SWMS · 13 bước công việc

    Line Marking SWMS: 13 job steps for airless line marking on concrete and bitumen, covering traffic, paint, fuel, plant and emergencies.

    Cũng bán riêng
  32. Civil Road Base and Seal

    SWMS · 18 bước công việc

    Civil road base and seal SWMS covering 18 job steps, from site set-up and machinery delivery to compaction, sealing, fuelling and emergencies.

    Cũng bán riêng
  33. Construction Night Works

    SWMS · 4 bước công việc

    SWMS for general construction work at night: planning, work area set-up, night works and emergency response, with lighting, plant and fatigue controls.

    Cũng bán riêng
  34. Light Vehicle on Construction

    SWMS · 16 bước công việc

    Light Vehicle on Construction SWMS: 16 job steps covering travel, loading, fuelling, breakdowns, accidents, mobile plant and emergencies.

    Cũng bán riêng
  35. Site Establishment

    SWMS · 11 bước công việc

    Site Establishment SWMS: 11 job steps from planning and traffic management to tools, site set-up, working at height and emergency response.

    Cũng bán riêng
  36. Guided Boring Pipe Jacking Works

    SWMS · 17 bước công việc

    A SWMS for guided boring and pipe jacking works: the hazards and controls for excavating launch and retrieval pits, hoisting and running the machine.

    Cũng bán riêng
  37. Excavation Near Assets

    SWMS · 13 bước công việc

    SWMS for excavating near underground services and assets: site planning, survey, work area set-up, contact with utilities and emergency response.

    Cũng bán riêng
  38. Manual Handling

    SWMS · 18 bước công việc

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    Cũng bán riêng
  39. Confined Space Work

    SWMS · 10 bước công việc

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    Cũng bán riêng
  40. Bulk Excavations

    SWMS · 13 bước công việc

    SWMS for bulk excavation work: planning, plant operation, shoring, water-charged ground, silica dust, re-fuelling, environmental controls and emergencies.

    Cũng bán riêng

Nội dung bao gồm

Các mối nguy được đề cập

Luật và tiêu chuẩn được dẫn chiếu

Mỗi SWMS đều đi kèm danh sách tham chiếu luật và bộ quy tắc thực hành (codes of practice) của chúng tôi.

Bạn tiết kiệm được gì

MẫuBước công việcMua riêng
Tipper and Dog16$89.95 · 1 lượt mở mẫu
Concrete Kerb - Channel16$89.95 · 1 lượt mở mẫu
Traffic Line Removal16$89.95 · 1 lượt mở mẫu
Earthmoving Equipment23$89.95 · 1 lượt mở mẫu
Traffic Corridor - Establishing a Safe Work Zone8$89.95 · 1 lượt mở mẫu
Stabilising Road Pavement16$89.95 · 1 lượt mở mẫu
Hot Asphalt Truck11$89.95 · 1 lượt mở mẫu
Hydro Seeding12$89.95 · 1 lượt mở mẫu
Site Mobilisation13$89.95 · 1 lượt mở mẫu
Surveyor14$89.95 · 1 lượt mở mẫu
Soil Compactor19$89.95 · 1 lượt mở mẫu
Water Cart14$89.95 · 1 lượt mở mẫu
Soil Testing11$89.95 · 1 lượt mở mẫu
Asphalt Concrete Road Application and Repairs18$89.95 · 1 lượt mở mẫu
Trench Excavation15$89.95 · 1 lượt mở mẫu
Silica Dust14$89.95 · 1 lượt mở mẫu
Trailer Mounted Hydro Excavator20$89.95 · 1 lượt mở mẫu
Road Profiler Machine23$89.95 · 1 lượt mở mẫu
Road Safety Barrier Installation21$89.95 · 1 lượt mở mẫu
Roller Operation17$89.95 · 1 lượt mở mẫu
Mobile Plant Working Near-Around8$89.95 · 1 lượt mở mẫu
Civil Shoulder Grading17$89.95 · 1 lượt mở mẫu
Bollard Speed Bump Tactile Paving15$89.95 · 1 lượt mở mẫu
Scraper-Dozer-Grader20$89.95 · 1 lượt mở mẫu
Asphalt Paver13$89.95 · 1 lượt mở mẫu
Spotter11$89.95 · 1 lượt mở mẫu
Nuclear Densometer12$89.95 · 1 lượt mở mẫu
Lasers9$89.95 · 1 lượt mở mẫu
Horizontal Directional Boring16$89.95 · 1 lượt mở mẫu
Sediment Fencing18$89.95 · 1 lượt mở mẫu
Line Marking13$89.95 · 1 lượt mở mẫu
Civil Road Base and Seal18$89.95 · 1 lượt mở mẫu
Construction Night Works4$89.95 · 1 lượt mở mẫu
Light Vehicle on Construction16$89.95 · 1 lượt mở mẫu
Site Establishment11$89.95 · 1 lượt mở mẫu
Guided Boring Pipe Jacking Works17$89.95 · 1 lượt mở mẫu
Excavation Near Assets13$89.95 · 1 lượt mở mẫu
Manual Handling18$89.95 · 1 lượt mở mẫu
Confined Space Work10$89.95 · 1 lượt mở mẫu
Bulk Excavations13$89.95 · 1 lượt mở mẫu
Mua từng mẫu$3,598.00 · 40 lượt mở mẫu
Trong gói này$2,338.70 · 26 lượt mở mẫu Bạn tiết kiệm $1,259.30

Đánh giá

Chưa có đánh giá nào.

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.