Six SWMS for fencing contractors: fencing, wire and electric fencing, earthmoving equipment, heat stress and power tools.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost five template credits instead of six.

Xem trước SWMS Wire and Electric Fencing Installation

Wire and Electric Fencing Installation

SWMSVersion 6
Company doing the work
[Company]
Business contact
—
Business contact phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with the requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile Plant

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers are trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract.

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards are identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

(add notes specific to this site)

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Eye Protection
  • Hand Protection
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

Inherent risk-rating (IR) before controls; residual risk-rating (RR) after controls.

  • Work activity

    Planning

    • Hazard

      Incorrect machinery and materials

      Before controls3 High
      Controls
      • Plan for the type of fence:

        • Machinery required for clearing fence line, ensure SWMS in place for applicable machine, e.g. bulldozer, grader

        • Requirements of the fence. e.g. Livestock control, preventing access, land management

        • Length of fence

        • Types of wire, i.e. barbed or plain (consider the weight of rolls for worker manually handling on site)

        • Grade of wire required

        • Grade of strainer posts or pickets

        • Spacing of posts and pickets

        • Gates.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Property encroachment / legislative breach

      Before controls3 High
      Controls
      • If on the property boundary, ensure neighbours are informed before work commences

      • Approvals/permits are in place if required, e.g. accessing adjoining properties, vegetation-clearing permits etc.

      • Confirm the location of the boundary line.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Working alone, emergency

      Before controls4 Acute
      Controls
      • Before undertaking activities in remote areas, careful planning and preparation must be undertaken

      • Select the most appropriate vehicle for the conditions

      • A procedure is developed for regular contact with people working remotely or in isolation, which outlines the frequency, nominated time, and method of contact appropriate for the work location and conditions:

        • An immediate supervisor or manager is aware of travel itineraries, current locations & what tasks are being undertaken in the remote area(s)

        • Scheduled contact people and Injury reporting procedures are developed and in place

        • Mobile & satellite phones and Emergency Position Indicating Radio Beacon (EPIRB) is fit for purpose, tested before departure & phones have spare, fully charged batteries and facilities for continuing charging

      • An emergency response procedure is developed & followed by the works depot or office if staff in remote areas fails to make scheduled contact at the nominated time

      • All safety equipment, including first aid & vehicle breakdown/rescue/tool kits & fire extinguisher(s), are checked before departure, fit for purpose, and regularly maintained

      • Hazard identification procedures:

        • Sufficient supplies of water, food, fuel & supplies needed

        • All relevant workers are appraised for required competencies & for any pre-existing medical conditions if working in remote or isolated locations.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Hunters - gunshot wounds

      Before controls4 Acute
      Controls
      • Check with landowners that no shooters are hunting/culling in the area:

        • If gunshots are heard nearby, leave the area immediately

        • Wear high-visibility clothing at all times.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Exposure to respirable crystalline silica (RCS) – dust inhalation

      Before controls4 Acute
      Controls
      • Concrete work- e.g. post setting

      • Training and information provided to workers on RCS should include the following:

        • Identification of RCS dust through Safety Datasheet (SDS) or labels

        • Dust exposure prevention

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes).

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Extreme weather

      Before controls3 High
      Controls
      • Check weather conditions – do not work in extreme conditions

      • Reschedule works to work in more moderate temperatures.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Hyperthermia, hypothermia

      Before controls3 High
      Controls
      • Ensure workers are trained to recognise the symptoms of hyperthermia and hypothermia

      • Hot conditions. Ensure:

        • Suitable protective clothing

        • Sun brim on hard hats

        • Safety glasses - UV rated

        • Use 30+ sunscreen on exposed skin

        • Adequate drinking water

        • Access to shade on breaks

        • Adequate breaks.

      • Cold conditions. Ensure:

        • Schedule warm-up breaks

        • Hold breaks inside

        • Dress warmly in layers

        • Stay dry (wet clothing chills the body rapidly)

        • Workers must get out of the cold as soon as they can if starting to feel symptoms

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

Thêm 19 bước công việc, từ Transporting materials đến Emergency response

Mỗi bước đều có mối nguy, mức rủi ro và biện pháp kiểm soát, cùng phần ký nhận của đội.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy gói tiết kiệm này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Mọi tài liệu sẽ vào Thư viện của bạn, trong một thư mục mang tên gói.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Gói này cần 5 lượt thay vì 6 lượt.

    So sánh các gói và giá
  • Mua một lần

    $449.75 $539.70 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Gói gồm những gì

  1. Wire and Electric Fencing Installation

    SWMS · 20 bước công việc

    Wire and Electric Fencing SWMS: 20 job steps covering stranded wire and electric fence installation, machinery, post holes, wire straining and emergencies.

    Cũng bán riêng
  2. Heat Stress

    SWMS · 8 bước công việc

    Heat Stress SWMS: 8 job steps covering heat stress symptoms, acclimatisation, hydration, shade, working alone and emergency response.

    Cũng bán riêng
  3. Fencing

    SWMS · 16 bước công việc

    Fencing SWMS: 16 job steps for wire, timber, steel panel, pool and glass panel fences, from planning to post holes, gates and emergencies.

    Cũng bán riêng
  4. Earthmoving Equipment

    SWMS · 23 bước công việc

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    Cũng bán riêng
  5. Powered Non-powered Tools

    SWMS · 12 bước công việc

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    Cũng bán riêng
  6. Manual Handling

    SWMS · 18 bước công việc

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    Cũng bán riêng

Nội dung bao gồm

Các mối nguy được đề cập

Luật và tiêu chuẩn được dẫn chiếu

Mỗi SWMS đều đi kèm danh sách tham chiếu luật và bộ quy tắc thực hành (codes of practice) của chúng tôi.

Bạn tiết kiệm được gì

MẫuBước công việcMua riêng
Wire and Electric Fencing Installation20$89.95 · 1 lượt mở mẫu
Heat Stress8$89.95 · 1 lượt mở mẫu
Fencing16$89.95 · 1 lượt mở mẫu
Earthmoving Equipment23$89.95 · 1 lượt mở mẫu
Powered Non-powered Tools12$89.95 · 1 lượt mở mẫu
Manual Handling18$89.95 · 1 lượt mở mẫu
Mua từng mẫu$539.70 · 6 lượt mở mẫu
Trong gói này$449.75 · 5 lượt mở mẫu Bạn tiết kiệm $89.95

Đánh giá

Chưa có đánh giá nào.

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.