High Pressure Water Cleaner

SWMS · SWMS-10189

  • 10 个工作步骤
  • 版本 10

This High Pressure Water Cleaner Safe Work Method Statement (SWMS) covers the hazards and controls of operating petrol or electric-powered high-pressure water jet cleaners that use cold water, hot water and steam. It sets out how to operate a pressure washer safely and what safety equipment to use.

It covers 10 job steps, from working alone, arriving at site and setting up the work area to environment, housekeeping, manual tasks, operating the pressure cleaner, refuelling, completion and emergency response.

It includes controls for mobile plant movement and hazardous atmospheres, and for pressurised water, electricity, hot water and steam, asbestos, lead, noise and slips, trips and falls.

It suits construction contractors, cleaning services and maintenance teams who operate high-pressure water cleaners.

查看单独页面

High Pressure Water Cleaner SWMS 预览

High Pressure Water Cleaner

SWMSVersion 10
Company doing the work
[Company]
Business contact
—
Phone #
—
Responsible person (for monitoring SWMS and work)
—
Contact phone #
—
Signature
—
Date
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone #
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Eye Protection

Job steps, hazards and controls

  • Work activity

    Working alone

    • Hazard

      Emergency

      Before controls4 Acute
      Controls
      • Ensure a second person knows your location and expected time of return

      • Use mobile phone, telephone or radio to periodically check-in

      • Communication equipment within easy reach at all times

      • Take extra care to work safely and methodically

      • Have a first aid kit readily available and stocked appropriately.

      After controls2 Moderate
      Responsible
      • Operatorto maintain call logins

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 9 个工作步骤,从“Arrival at site”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个体系

免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。

  • 付费套餐包含

    使用套餐中的模板额度。这一份需要 20 个额度。

    比较套餐和价格
  • 单独购买

    $999.90 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

涵盖内容

10 个工作步骤

  1. Working aloneKeep in contact when working alone
  2. Arrival at sitePosition the vehicle, report in and check the site
  3. Work area set upSet up exclusion zones and make power and fuel units safe
  4. EnvironmentControl noise, waste, spills and runoff
  5. House keepingKeep the work area, hoses and leads clear
  6. Manual tasksUnload and move the pressure unit safely
  7. Operating the pressure cleanerCheck and operate the pressure cleaner safely
  8. RefuellingRefuel away from ignition sources
  9. On completionShut down, drain and store the unit, and sign out
  10. Emergency responseCall 000, apply first aid and report incidents

涵盖的危险

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。