Electric Vehicle Battery Charging
- Company doing the work
- [Company]
- Business contact
- —
- Phone #
- —
- Responsible person (for monitoring SWMS and work)
- —
- Responsible person's phone
- —
- Responsible person's signature
- —
- Date signed
- —
- Principal Contractor (PC)
- [Principal contractor]
- PC Address
- —
- PC phone
- [PC phone]
- Date SWMS provided to PC
- —
- Job Site Address
- [Site address]
- Part of a construction project
- —
Site Management Plan
If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.
High-risk construction work
This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)
- Mobile PlantMobile plant movement
- Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere
Planning and preparation
Planning
Liaise with Principal Contractor to identify on-site safety systems and procedures
Establish supervisory and communication arrangements
Principal contractor to confirm emergency response procedures are in place.
Hold points
Hold points identified and signed off before continuing work. (specify the hold points)
Training and licences
All workers to have a General Construction Induction Card
Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.
Trained First Aider on site
All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.
Worker duties and responsibilities
Fit condition for work, i.e., no signs of fatigue, alcohol or drugs
Attend all site inductions/briefings
Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)
Only carry out work related to the contract
Inspect completed work and report possible safety, environmental and quality matters to the supervisor.
Monitoring and review
All people involved in the task must have this SWMS communicated to them before work commences
SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident
If additional site hazards identified, review this SWMS and amend control measures to suit
People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP
Give the principal contractor a copy of the revised SWMS
The site supervisor to monitor works against the controls stated in this SWMS
SWMS must be kept on-site and made available for inspection or review
Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident
Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.
Site-specific notes
Legislation and codes of practice
None listed.
Personal protective equipment (PPE)
- Foot Protection
- High Visibility
- Eye Protection
- Hand Protection
Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.
Job steps, hazards and controls
- Work activity
Planning
- Hazard
Fire/ explosion; Hazardous chemicals – including sulphuric acid, lead; Hazardous atmosphere
Before controls4 AcuteControlsRepair/charging area. Ensure:
The area has caution signs
Well ventilated (provide explosion-proof mechanical ventilation if required)
Protected from direct sunlight
Not located near flammable storages or other hazardous chemicals
Spill containment system in place
Adequate fire protection provided
Emergency shower and eyewash provided
No ignition sources within 6m; all electrical installations should be rated explosion-proof
Equipped with overhead hoists, conveyors or cranes for handling batteries
A clear pathway for Battery/Forklift travels from the storage/unloading area to the charging area.
After controls2 ModerateResponsible- Supervisor
- Hazard
Contact with electricity
Before controls4 AcuteControlsPlant and equipment. Ensure:
All manufacturer’s /supplier’s instructions and user manuals are available
Electrical equipment installed by qualified electricians where necessary
Portable electrical equipment is connected, protection by an appropriate residual current device (RCD)
Seek the advice of a competent person for appropriate inspection and testing intervals of equipment
Clearly marking walkways and charging area.
After controls2 ModerateResponsible- Supervisor
IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute
Overall risk after controls2 MModeratethe highest rating after controls
5 more job steps, from Training to Emergency response
Each with its hazards, risk ratings and controls, plus your crew's sign-on.




